Hawaii - Big Island
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F21R0016 & W9128F21R0017
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1100 | Big Island Year 1 | | | | |
| 1101 | Planning Effort | Negotiated Line Item | | | |
| 1102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 1104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 1105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 1106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 1107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 1108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 1109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 1 | | | | $ 25,000.00 |
| 2100 | Big Island Year 2 | | | | |
| 2101 | Planning Effort | Negotiated Line Item | | | |
| 2102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 2104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 2105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 2106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 2107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 2108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 2109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 2 | | | | $ 25,000.00 |
| 3100 | Big Island Year 3 | | | | |
| 3101 | Planning Effort | Negotiated Line Item | | | |
| 3102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 3104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 3105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 3106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 3107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 3108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 3109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 3 | | | | $ 25,000.00 |
| 4100 | Big Island Year 4 | | | | |
| 4101 | Planning Effort | Negotiated Line Item | | | |
| 4102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 4104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 4105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 4106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 4107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 4108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 4109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 4 | | | | $ 25,000.00 |
| 5100 | Big Island Year 5 | | | | |
| 5101 | Planning Effort | Negotiated Line Item | | | |
| 5102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 5104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 5105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 5106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 5107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 5108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 5109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 5 | | | | $ 25,000.00 |
| 6100 | Big Island Year 6 | | | | |
| 6101 | Planning Effort | Negotiated Line Item | | | |
| 6102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 6104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 6105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 6106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 6107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 6108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 6109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 6 | | | | $ 25,000.00 |
| 7100 | Big Island Year 7 | | | | |
| 7101 | Planning Effort | Negotiated Line Item | | | |
| 7102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 7104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 7105 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 7106 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 7107 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 7108 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 7109 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Big Island Year 7 | | | | $ 25,000.00 |
Hawaii - Kaua'i
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F21R0016 & W9128F21R0017
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1200 | Kaua'i Year 1 | | | | |
| 1201 | Planning Effort | Negotiated Line Item | | | |
| 1202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 1204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 1205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 1206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 1207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 1208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 1209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 1 | | | | $ 25,000.00 |
| 2200 | Kaua'i Year 2 | | | | |
| 2201 | Planning Effort | Negotiated Line Item | | | |
| 2202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 2204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 2205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 2206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 2207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 2208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 2209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 2 | | | | $ 25,000.00 |
| 3200 | Kaua'i Year 3 | | | | |
| 3201 | Planning Effort | Negotiated Line Item | | | |
| 3202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 3204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 3205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 3206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 3207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 3208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 3209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 3 | | | | $ 25,000.00 |
| 4200 | Kaua'i Year 4 | | | | |
| 4201 | Planning Effort | Negotiated Line Item | | | |
| 4202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 4204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 4205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 4206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 4207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 4208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 4209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 4 | | | | $ 25,000.00 |
| 5200 | Kaua'i Year 5 | | | | |
| 5201 | Planning Effort | Negotiated Line Item | | | |
| 5202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 5204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 5205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 5206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 5207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 5208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 5209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 5 | | | | $ 25,000.00 |
| 6200 | Kaua'i Year 6 | | | | |
| 6201 | Planning Effort | Negotiated Line Item | | | |
| 6202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 6204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 6205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 6206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 6207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 6208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 6209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 6 | | | | $ 25,000.00 |
| 7200 | Kaua'i Year 7 | | | | |
| 7201 | Planning Effort | Negotiated Line Item | | | |
| 7202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 7204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 7205 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 7206 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 7207 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 7208 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 7209 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Kaua'i Year 7 | | | | $ 25,000.00 |
Hawaii - Maui
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F21R0016 & W9128F21R0017
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1300 | Maui Year 1 | | | | |
| 1301 | Planning Effort | Negotiated Line Item | | | |
| 1302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 1304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 1305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 1306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 1307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 1308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 1309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 1 | | | | $ 25,000.00 |
| 2300 | Maui Year 2 | | | | |
| 2301 | Planning Effort | Negotiated Line Item | | | |
| 2302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 2304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 2305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 2306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 2307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 2308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 2309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 2 | | | | $ 25,000.00 |
| 3300 | Maui Year 3 | | | | |
| 3301 | Planning Effort | Negotiated Line Item | | | |
| 3302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 3304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 3305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 3306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 3307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 3308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 3309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 3 | | | | $ 25,000.00 |
| 4300 | Maui Year 4 | | | | |
| 4301 | Planning Effort | Negotiated Line Item | | | |
| 4302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 4304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 4305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 4306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 4307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 4308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 4309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 4 | | | | $ 25,000.00 |
| 5300 | Maui Year 5 | | | | |
| 5301 | Planning Effort | Negotiated Line Item | | | |
| 5302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 5304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 5305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 5306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 5307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 5308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 5309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 5 | | | | $ 25,000.00 |
| 6300 | Maui Year 6 | | | | |
| 6301 | Planning Effort | Negotiated Line Item | | | |
| 6302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 6304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 6305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 6306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 6307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 6308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 6309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 6 | | | | $ 25,000.00 |
| 7300 | Maui Year 7 | | | | |
| 7301 | Planning Effort | Negotiated Line Item | | | |
| 7302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 7304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 7305 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 7306 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 7307 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 7308 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 7309 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL Maui Year 7 | | | | $ 25,000.00 |
Hawaii - O'ahu
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F21R0016 & W9128F21R0017
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1400 | O'ahu Year 1 | | | | |
| 1401 | Planning Effort | Negotiated Line Item | | | |
| 1402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 1404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 1405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 1406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 1407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 1408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 1409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 1 | | | | $ 25,000.00 |
| 2400 | O'ahu Year 2 | | | | |
| 2401 | Planning Effort | Negotiated Line Item | | | |
| 2402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 2404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 2405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 2406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 2407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 2408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 2409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 2 | | | | $ 25,000.00 |
| 3400 | O'ahu Year 3 | | | | |
| 3401 | Planning Effort | Negotiated Line Item | | | |
| 3402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 3404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 3405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 3406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 3407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 3408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 3409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 3 | | | | $ 25,000.00 |
| 4400 | O'ahu Year 4 | | | | |
| 4401 | Planning Effort | Negotiated Line Item | | | |
| 4402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 4404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 4405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 4406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 4407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 4408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 4409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 4 | | | | $ 25,000.00 |
| 5400 | O'ahu Year 5 | | | | |
| 5401 | Planning Effort | Negotiated Line Item | | | |
| 5402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 5404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 5405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 5406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 5407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 5408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 5409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 5 | | | | $ 25,000.00 |
| 6400 | O'ahu Year 6 | | | | |
| 6401 | Planning Effort | Negotiated Line Item | | | |
| 6402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 6404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 6405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 6406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 6407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 6408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 6409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 6 | | | | $ 25,000.00 |
| 7400 | O'ahu Year 7 | | | | |
| 7401 | Planning Effort | Negotiated Line Item | | | |
| 7402 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7403 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 7404 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 7405 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 7406 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 7407 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 7408 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 7409 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL O'ahu Year 7 | | | | $ 25,000.00 |
Hawaii - All Other Islands
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F21R0016 & W9128F21R0017
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1500 | All Other Islands Year 1 | | | | |
| 1501 | Planning Effort | Negotiated Line Item | | | |
| 1502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 1504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 1505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 1506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 1507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 1508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 1509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 1 | | | | $ 25,000.00 |
| 2500 | All Other Islands Year 2 | | | | |
| 2501 | Planning Effort | Negotiated Line Item | | | |
| 2502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 2504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 2505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 2506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 2507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 2508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 2509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 2 | | | | $ 25,000.00 |
| 3500 | All Other Islands Year 3 | | | | |
| 3501 | Planning Effort | Negotiated Line Item | | | |
| 3502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 3504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 3505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 3506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 3507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 3508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 3509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 3 | | | | $ 25,000.00 |
| 4500 | All Other Islands Year 4 | | | | |
| 4501 | Planning Effort | Negotiated Line Item | | | |
| 4502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 4504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 4505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 4506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 4507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 4508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 4509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 4 | | | | $ 25,000.00 |
| 5500 | All Other Islands Year 5 | | | | |
| 5501 | Planning Effort | Negotiated Line Item | | | |
| 5502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 5504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 5505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 5506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 5507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 5508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 5509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 5 | | | | $ 25,000.00 |
| 6500 | All Other Islands Year 6 | | | | |
| 6501 | Planning Effort | Negotiated Line Item | | | |
| 6502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 6504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 6505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 6506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 6507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 6508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 6509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 6 | | | | $ 25,000.00 |
| 7500 | All Other Islands Year 7 | | | | |
| 7501 | Planning Effort | Negotiated Line Item | | | |
| 7502 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7503 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | | 220,000 | $ - 0 |
| 7504 | Install Government Furnished Plastic Sheeting Metal Roof | SF | | 1,620,000 | $ - 0 |
| 7505 | Furnish and Install Structural Panels | SF | | 43,400 | $ - 0 |
| 7506 | Furnish and Install Rafters | LF | | 6,700 | $ - 0 |
| 7507 | Minor Debris Clearance | EA | | 350 | $ - 0 |
| 7508 | Major Debris Clearance | EA | | 50 | $ - 0 |
| 7509 | Small Roof Repair | EA | | 3 | $ - 0 |
| TOTAL All Other Islands Year 7 | | | | $ 25,000.00 |