Price Schedule Hawaii Regions - Locked.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Advance Contract Initiative (ACI) for Emergency Temporary Roof Repairs - Hawaiian Islands - Unrestricted
Solicitation number
W9128F21R0017
Issued by

About this file

This document contains a price schedule for an Advance Contract Initiative for emergency temporary roof repairs across the Hawaiian Islands. The solicitation will result in the award of two $45 million single award task order contracts with a 7-year period of performance to include a 5-year base period and a 2-year option period. The price schedule outlines pricing for line items such as planning efforts, work order processing, installation of government furnished plastic sheeting for shingle and metal roofs, structural panel and rafter installation, debris clearance, and small roof repairs. Pricing is provided for each of the Hawaiian Islands and all other islands for seven years. The solicitation will close on March 9, 2021 unless amended and is open to both large and small businesses. The Department of the Army Corps of Engineers District Omaha is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hawaii - Big Island

SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE

W9128F21R0016 & W9128F21R0017

TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00

Contractor Name: _______________________________________________________________

Hawaii
Big Island

NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only

Line Item Description Unit of Issue Unit Price Qty Total

1100Big Island Year 1
1101Planning EffortNegotiated Line Item
1102Work Order ProcessingEA$ 125.00200$ 25,000.00
1103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
1104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
1105Furnish and Install Structural PanelsSF43,400$ - 0
1106Furnish and Install RaftersLF6,700$ - 0
1107Minor Debris ClearanceEA350$ - 0
1108Major Debris ClearanceEA50$ - 0
1109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 1$ 25,000.00
2100Big Island Year 2
2101Planning EffortNegotiated Line Item
2102Work Order ProcessingEA$ 125.00200$ 25,000.00
2103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
2104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
2105Furnish and Install Structural PanelsSF43,400$ - 0
2106Furnish and Install RaftersLF6,700$ - 0
2107Minor Debris ClearanceEA350$ - 0
2108Major Debris ClearanceEA50$ - 0
2109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 2$ 25,000.00
3100Big Island Year 3
3101Planning EffortNegotiated Line Item
3102Work Order ProcessingEA$ 125.00200$ 25,000.00
3103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
3104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
3105Furnish and Install Structural PanelsSF43,400$ - 0
3106Furnish and Install RaftersLF6,700$ - 0
3107Minor Debris ClearanceEA350$ - 0
3108Major Debris ClearanceEA50$ - 0
3109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 3$ 25,000.00
4100Big Island Year 4
4101Planning EffortNegotiated Line Item
4102Work Order ProcessingEA$ 125.00200$ 25,000.00
4103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
4104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
4105Furnish and Install Structural PanelsSF43,400$ - 0
4106Furnish and Install RaftersLF6,700$ - 0
4107Minor Debris ClearanceEA350$ - 0
4108Major Debris ClearanceEA50$ - 0
4109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 4$ 25,000.00
5100Big Island Year 5
5101Planning EffortNegotiated Line Item
5102Work Order ProcessingEA$ 125.00200$ 25,000.00
5103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
5104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
5105Furnish and Install Structural PanelsSF43,400$ - 0
5106Furnish and Install RaftersLF6,700$ - 0
5107Minor Debris ClearanceEA350$ - 0
5108Major Debris ClearanceEA50$ - 0
5109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 5$ 25,000.00
6100Big Island Year 6
6101Planning EffortNegotiated Line Item
6102Work Order ProcessingEA$ 125.00200$ 25,000.00
6103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
6104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
6105Furnish and Install Structural PanelsSF43,400$ - 0
6106Furnish and Install RaftersLF6,700$ - 0
6107Minor Debris ClearanceEA350$ - 0
6108Major Debris ClearanceEA50$ - 0
6109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 6$ 25,000.00
7100Big Island Year 7
7101Planning EffortNegotiated Line Item
7102Work Order ProcessingEA$ 125.00200$ 25,000.00
7103Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
7104Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
7105Furnish and Install Structural PanelsSF43,400$ - 0
7106Furnish and Install RaftersLF6,700$ - 0
7107Minor Debris ClearanceEA350$ - 0
7108Major Debris ClearanceEA50$ - 0
7109Small Roof RepairEA3$ - 0
TOTAL Big Island Year 7$ 25,000.00

Hawaii - Kaua'i

SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE

W9128F21R0016 & W9128F21R0017

TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00

Contractor Name: _______________________________________________________________

Hawaii
Kaua'i

NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only

Line Item Description Unit of Issue Unit Price Qty Total

1200Kaua'i Year 1
1201Planning EffortNegotiated Line Item
1202Work Order ProcessingEA$ 125.00200$ 25,000.00
1203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
1204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
1205Furnish and Install Structural PanelsSF43,400$ - 0
1206Furnish and Install RaftersLF6,700$ - 0
1207Minor Debris ClearanceEA350$ - 0
1208Major Debris ClearanceEA50$ - 0
1209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 1$ 25,000.00
2200Kaua'i Year 2
2201Planning EffortNegotiated Line Item
2202Work Order ProcessingEA$ 125.00200$ 25,000.00
2203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
2204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
2205Furnish and Install Structural PanelsSF43,400$ - 0
2206Furnish and Install RaftersLF6,700$ - 0
2207Minor Debris ClearanceEA350$ - 0
2208Major Debris ClearanceEA50$ - 0
2209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 2$ 25,000.00
3200Kaua'i Year 3
3201Planning EffortNegotiated Line Item
3202Work Order ProcessingEA$ 125.00200$ 25,000.00
3203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
3204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
3205Furnish and Install Structural PanelsSF43,400$ - 0
3206Furnish and Install RaftersLF6,700$ - 0
3207Minor Debris ClearanceEA350$ - 0
3208Major Debris ClearanceEA50$ - 0
3209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 3$ 25,000.00
4200Kaua'i Year 4
4201Planning EffortNegotiated Line Item
4202Work Order ProcessingEA$ 125.00200$ 25,000.00
4203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
4204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
4205Furnish and Install Structural PanelsSF43,400$ - 0
4206Furnish and Install RaftersLF6,700$ - 0
4207Minor Debris ClearanceEA350$ - 0
4208Major Debris ClearanceEA50$ - 0
4209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 4$ 25,000.00
5200Kaua'i Year 5
5201Planning EffortNegotiated Line Item
5202Work Order ProcessingEA$ 125.00200$ 25,000.00
5203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
5204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
5205Furnish and Install Structural PanelsSF43,400$ - 0
5206Furnish and Install RaftersLF6,700$ - 0
5207Minor Debris ClearanceEA350$ - 0
5208Major Debris ClearanceEA50$ - 0
5209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 5$ 25,000.00
6200Kaua'i Year 6
6201Planning EffortNegotiated Line Item
6202Work Order ProcessingEA$ 125.00200$ 25,000.00
6203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
6204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
6205Furnish and Install Structural PanelsSF43,400$ - 0
6206Furnish and Install RaftersLF6,700$ - 0
6207Minor Debris ClearanceEA350$ - 0
6208Major Debris ClearanceEA50$ - 0
6209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 6$ 25,000.00
7200Kaua'i Year 7
7201Planning EffortNegotiated Line Item
7202Work Order ProcessingEA$ 125.00200$ 25,000.00
7203Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
7204Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
7205Furnish and Install Structural PanelsSF43,400$ - 0
7206Furnish and Install RaftersLF6,700$ - 0
7207Minor Debris ClearanceEA350$ - 0
7208Major Debris ClearanceEA50$ - 0
7209Small Roof RepairEA3$ - 0
TOTAL Kaua'i Year 7$ 25,000.00

Hawaii - Maui

SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE

W9128F21R0016 & W9128F21R0017

TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00

Contractor Name: _______________________________________________________________

Hawaii
Maui

NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only

Line Item Description Unit of Issue Unit Price Qty Total

1300Maui Year 1
1301Planning EffortNegotiated Line Item
1302Work Order ProcessingEA$ 125.00200$ 25,000.00
1303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
1304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
1305Furnish and Install Structural PanelsSF43,400$ - 0
1306Furnish and Install RaftersLF6,700$ - 0
1307Minor Debris ClearanceEA350$ - 0
1308Major Debris ClearanceEA50$ - 0
1309Small Roof RepairEA3$ - 0
TOTAL Maui Year 1$ 25,000.00
2300Maui Year 2
2301Planning EffortNegotiated Line Item
2302Work Order ProcessingEA$ 125.00200$ 25,000.00
2303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
2304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
2305Furnish and Install Structural PanelsSF43,400$ - 0
2306Furnish and Install RaftersLF6,700$ - 0
2307Minor Debris ClearanceEA350$ - 0
2308Major Debris ClearanceEA50$ - 0
2309Small Roof RepairEA3$ - 0
TOTAL Maui Year 2$ 25,000.00
3300Maui Year 3
3301Planning EffortNegotiated Line Item
3302Work Order ProcessingEA$ 125.00200$ 25,000.00
3303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
3304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
3305Furnish and Install Structural PanelsSF43,400$ - 0
3306Furnish and Install RaftersLF6,700$ - 0
3307Minor Debris ClearanceEA350$ - 0
3308Major Debris ClearanceEA50$ - 0
3309Small Roof RepairEA3$ - 0
TOTAL Maui Year 3$ 25,000.00
4300Maui Year 4
4301Planning EffortNegotiated Line Item
4302Work Order ProcessingEA$ 125.00200$ 25,000.00
4303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
4304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
4305Furnish and Install Structural PanelsSF43,400$ - 0
4306Furnish and Install RaftersLF6,700$ - 0
4307Minor Debris ClearanceEA350$ - 0
4308Major Debris ClearanceEA50$ - 0
4309Small Roof RepairEA3$ - 0
TOTAL Maui Year 4$ 25,000.00
5300Maui Year 5
5301Planning EffortNegotiated Line Item
5302Work Order ProcessingEA$ 125.00200$ 25,000.00
5303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
5304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
5305Furnish and Install Structural PanelsSF43,400$ - 0
5306Furnish and Install RaftersLF6,700$ - 0
5307Minor Debris ClearanceEA350$ - 0
5308Major Debris ClearanceEA50$ - 0
5309Small Roof RepairEA3$ - 0
TOTAL Maui Year 5$ 25,000.00
6300Maui Year 6
6301Planning EffortNegotiated Line Item
6302Work Order ProcessingEA$ 125.00200$ 25,000.00
6303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
6304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
6305Furnish and Install Structural PanelsSF43,400$ - 0
6306Furnish and Install RaftersLF6,700$ - 0
6307Minor Debris ClearanceEA350$ - 0
6308Major Debris ClearanceEA50$ - 0
6309Small Roof RepairEA3$ - 0
TOTAL Maui Year 6$ 25,000.00
7300Maui Year 7
7301Planning EffortNegotiated Line Item
7302Work Order ProcessingEA$ 125.00200$ 25,000.00
7303Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
7304Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
7305Furnish and Install Structural PanelsSF43,400$ - 0
7306Furnish and Install RaftersLF6,700$ - 0
7307Minor Debris ClearanceEA350$ - 0
7308Major Debris ClearanceEA50$ - 0
7309Small Roof RepairEA3$ - 0
TOTAL Maui Year 7$ 25,000.00

Hawaii - O'ahu

SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE

W9128F21R0016 & W9128F21R0017

TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00

Contractor Name: _______________________________________________________________

Hawaii
O'ahu

NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only

Line Item Description Unit of Issue Unit Price Qty Total

1400O'ahu Year 1
1401Planning EffortNegotiated Line Item
1402Work Order ProcessingEA$ 125.00200$ 25,000.00
1403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
1404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
1405Furnish and Install Structural PanelsSF43,400$ - 0
1406Furnish and Install RaftersLF6,700$ - 0
1407Minor Debris ClearanceEA350$ - 0
1408Major Debris ClearanceEA50$ - 0
1409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 1$ 25,000.00
2400O'ahu Year 2
2401Planning EffortNegotiated Line Item
2402Work Order ProcessingEA$ 125.00200$ 25,000.00
2403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
2404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
2405Furnish and Install Structural PanelsSF43,400$ - 0
2406Furnish and Install RaftersLF6,700$ - 0
2407Minor Debris ClearanceEA350$ - 0
2408Major Debris ClearanceEA50$ - 0
2409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 2$ 25,000.00
3400O'ahu Year 3
3401Planning EffortNegotiated Line Item
3402Work Order ProcessingEA$ 125.00200$ 25,000.00
3403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
3404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
3405Furnish and Install Structural PanelsSF43,400$ - 0
3406Furnish and Install RaftersLF6,700$ - 0
3407Minor Debris ClearanceEA350$ - 0
3408Major Debris ClearanceEA50$ - 0
3409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 3$ 25,000.00
4400O'ahu Year 4
4401Planning EffortNegotiated Line Item
4402Work Order ProcessingEA$ 125.00200$ 25,000.00
4403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
4404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
4405Furnish and Install Structural PanelsSF43,400$ - 0
4406Furnish and Install RaftersLF6,700$ - 0
4407Minor Debris ClearanceEA350$ - 0
4408Major Debris ClearanceEA50$ - 0
4409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 4$ 25,000.00
5400O'ahu Year 5
5401Planning EffortNegotiated Line Item
5402Work Order ProcessingEA$ 125.00200$ 25,000.00
5403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
5404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
5405Furnish and Install Structural PanelsSF43,400$ - 0
5406Furnish and Install RaftersLF6,700$ - 0
5407Minor Debris ClearanceEA350$ - 0
5408Major Debris ClearanceEA50$ - 0
5409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 5$ 25,000.00
6400O'ahu Year 6
6401Planning EffortNegotiated Line Item
6402Work Order ProcessingEA$ 125.00200$ 25,000.00
6403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
6404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
6405Furnish and Install Structural PanelsSF43,400$ - 0
6406Furnish and Install RaftersLF6,700$ - 0
6407Minor Debris ClearanceEA350$ - 0
6408Major Debris ClearanceEA50$ - 0
6409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 6$ 25,000.00
7400O'ahu Year 7
7401Planning EffortNegotiated Line Item
7402Work Order ProcessingEA$ 125.00200$ 25,000.00
7403Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
7404Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
7405Furnish and Install Structural PanelsSF43,400$ - 0
7406Furnish and Install RaftersLF6,700$ - 0
7407Minor Debris ClearanceEA350$ - 0
7408Major Debris ClearanceEA50$ - 0
7409Small Roof RepairEA3$ - 0
TOTAL O'ahu Year 7$ 25,000.00

Hawaii - All Other Islands

SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE

W9128F21R0016 & W9128F21R0017

TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00

Contractor Name: _______________________________________________________________

Hawaii
All Other Islands

NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only

Line Item Description Unit of Issue Unit Price Qty Total

1500All Other Islands Year 1
1501Planning EffortNegotiated Line Item
1502Work Order ProcessingEA$ 125.00200$ 25,000.00
1503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
1504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
1505Furnish and Install Structural PanelsSF43,400$ - 0
1506Furnish and Install RaftersLF6,700$ - 0
1507Minor Debris ClearanceEA350$ - 0
1508Major Debris ClearanceEA50$ - 0
1509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 1$ 25,000.00
2500All Other Islands Year 2
2501Planning EffortNegotiated Line Item
2502Work Order ProcessingEA$ 125.00200$ 25,000.00
2503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
2504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
2505Furnish and Install Structural PanelsSF43,400$ - 0
2506Furnish and Install RaftersLF6,700$ - 0
2507Minor Debris ClearanceEA350$ - 0
2508Major Debris ClearanceEA50$ - 0
2509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 2$ 25,000.00
3500All Other Islands Year 3
3501Planning EffortNegotiated Line Item
3502Work Order ProcessingEA$ 125.00200$ 25,000.00
3503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
3504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
3505Furnish and Install Structural PanelsSF43,400$ - 0
3506Furnish and Install RaftersLF6,700$ - 0
3507Minor Debris ClearanceEA350$ - 0
3508Major Debris ClearanceEA50$ - 0
3509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 3$ 25,000.00
4500All Other Islands Year 4
4501Planning EffortNegotiated Line Item
4502Work Order ProcessingEA$ 125.00200$ 25,000.00
4503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
4504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
4505Furnish and Install Structural PanelsSF43,400$ - 0
4506Furnish and Install RaftersLF6,700$ - 0
4507Minor Debris ClearanceEA350$ - 0
4508Major Debris ClearanceEA50$ - 0
4509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 4$ 25,000.00
5500All Other Islands Year 5
5501Planning EffortNegotiated Line Item
5502Work Order ProcessingEA$ 125.00200$ 25,000.00
5503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
5504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
5505Furnish and Install Structural PanelsSF43,400$ - 0
5506Furnish and Install RaftersLF6,700$ - 0
5507Minor Debris ClearanceEA350$ - 0
5508Major Debris ClearanceEA50$ - 0
5509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 5$ 25,000.00
6500All Other Islands Year 6
6501Planning EffortNegotiated Line Item
6502Work Order ProcessingEA$ 125.00200$ 25,000.00
6503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
6504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
6505Furnish and Install Structural PanelsSF43,400$ - 0
6506Furnish and Install RaftersLF6,700$ - 0
6507Minor Debris ClearanceEA350$ - 0
6508Major Debris ClearanceEA50$ - 0
6509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 6$ 25,000.00
7500All Other Islands Year 7
7501Planning EffortNegotiated Line Item
7502Work Order ProcessingEA$ 125.00200$ 25,000.00
7503Install Government Furnished Plastic Sheeting Shingle RoofSF220,000$ - 0
7504Install Government Furnished Plastic Sheeting Metal RoofSF1,620,000$ - 0
7505Furnish and Install Structural PanelsSF43,400$ - 0
7506Furnish and Install RaftersLF6,700$ - 0
7507Minor Debris ClearanceEA350$ - 0
7508Major Debris ClearanceEA50$ - 0
7509Small Roof RepairEA3$ - 0
TOTAL All Other Islands Year 7$ 25,000.00