This is a pricing schedule template for solicitation 140R4025R0003 from the Bureau of Reclamation for RGSM (Rio Grande Silvery Minnow) Population Monitoring services. The schedule covers a base year and four option years, with each year containing the same nine tasks - five required and four optional.

The required tasks include conducting field sampling at 20 sites/month for 7 months, additional field sampling at 20 sites for 2 months, intensive sampling in November, monthly and annual reporting, and presentation of results. Optional tasks include participation in scientific workshops, additional field sampling at 20 sites for 2 months (TBD by government), field sampling at 30 additional sites for 2 months, and collecting additional data per seine haul. The schedule includes provisions for a potential 6-month extension of services under FAR 52.217-8, with prices to be prorated based on rates in effect at the time of exercise.

View the file

Other files

File Type Posted
Sol_140R4025R0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R4025R0003 RGSM Population Monitoring

PRICE SCHEDULE

ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

BASE YEAR

00010Task 1: (Required) Conduct Field Sampling
at 20 sites/month for 7 months7Months______________________

00020 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________

00030 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)

00040 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)

00050 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________

00060 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue

00070 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)

00080 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the 7 months

00090 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________ Per Seine Haul

BASE YEAR TOTAL ____________

OPTION YEAR ONE

00110Task 1: (Required) Conduct Field Sampling
at 20 sites/month for 7 months7Months______________________

00120 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________

00130 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)

00140 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)

00150 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________

00160 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue

00170 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)

00180 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the 7 months

00190 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________

OPTION YEAR ONE TOTAL ____________

OPTION YEAR TWO

00210Task 1: (Required) Conduct Field Sampling
at 20 sites/month for 7 months7Months______________________

00220 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________

00230 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)

00240 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)

00250 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________

00260 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue

00270 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)

00280 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the

00290 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________

OPTION YEAR TWO TOTAL ____________

OPTION YEAR THREE

00310Task 1: (Required) Conduct Field Sampling
at 20 sites/month for 7 months7Months______________________

00320 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________

00330 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)

00340 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)

00350 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________

00360 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue

00370 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)

00380 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the

00390 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________

OPTION YEAR THREE TOTAL ____________

OPTION YEAR FOUR

00410Task 1: (Required) Conduct Field Sampling
at 20 sites/month for 7 months7Months______________________

00420 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________

00430 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)

00040 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)

00450 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________

00460 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue

00470 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)

00480 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the

00490 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________

OPTION YEAR FOUR TOTAL ____________

If 6-month extension of services is required per FAR 52.217-8, the prices for the Option to Extend Service’s term will be calculated based on the prorated term and prices that are in effect at the time the option is exercised.