Price_Schedule_fillable.docx
DOCX document 18 KB Posted
- Attached to
- MRG RGSM Population Monitoring
- Solicitation number
- 140R4025R0003
About this file
This is a pricing schedule template for solicitation 140R4025R0003 from the Bureau of Reclamation for RGSM (Rio Grande Silvery Minnow) Population Monitoring services. The schedule covers a base year and four option years, with each year containing the same nine tasks - five required and four optional.
The required tasks include conducting field sampling at 20 sites/month for 7 months, additional field sampling at 20 sites for 2 months, intensive sampling in November, monthly and annual reporting, and presentation of results. Optional tasks include participation in scientific workshops, additional field sampling at 20 sites for 2 months (TBD by government), field sampling at 30 additional sites for 2 months, and collecting additional data per seine haul. The schedule includes provisions for a potential 6-month extension of services under FAR 52.217-8, with prices to be prorated based on rates in effect at the time of exercise.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R4025R0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R4025R0003 RGSM Population Monitoring
PRICE SCHEDULE
ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
BASE YEAR
| 00010 | Task 1: (Required) Conduct Field Sampling | ||||
| at 20 sites/month for 7 months | 7 | Months | ___________ | ___________ |
00020 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________
00030 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)
00040 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)
00050 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________
00060 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue
00070 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)
00080 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the 7 months
00090 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________ Per Seine Haul
BASE YEAR TOTAL ____________
OPTION YEAR ONE
| 00110 | Task 1: (Required) Conduct Field Sampling | ||||
| at 20 sites/month for 7 months | 7 | Months | ___________ | ___________ |
00120 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________
00130 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)
00140 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)
00150 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________
00160 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue
00170 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)
00180 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the 7 months
00190 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________
OPTION YEAR ONE TOTAL ____________
OPTION YEAR TWO
| 00210 | Task 1: (Required) Conduct Field Sampling | ||||
| at 20 sites/month for 7 months | 7 | Months | ___________ | ___________ |
00220 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________
00230 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)
00240 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)
00250 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________
00260 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue
00270 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)
00280 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the
00290 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________
OPTION YEAR TWO TOTAL ____________
OPTION YEAR THREE
| 00310 | Task 1: (Required) Conduct Field Sampling | ||||
| at 20 sites/month for 7 months | 7 | Months | ___________ | ___________ |
00320 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________
00330 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)
00340 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)
00350 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________
00360 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue
00370 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)
00380 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the
00390 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________
OPTION YEAR THREE TOTAL ____________
OPTION YEAR FOUR
| 00410 | Task 1: (Required) Conduct Field Sampling | ||||
| at 20 sites/month for 7 months | 7 | Months | ___________ | ___________ |
00420 Task 2: (Required) Conduct Field Sampling for an additional 20 sites/month for 2 of the 7 months 2 Months ___________ ___________
00430 Task 3: (Required) Conduct Intensive 1 Lump Sum ___________ ___________ Sampling (November)
00040 Task 4: (Required) Reporting (Monthly 1 Lump Sum ___________ ___________ and Annually)
00450 Task 5: (Required) Presentation of Results 1 Lump Sum ___________ ___________
00460 Task 6: (Optional) Participate in Scientific 1 Lump Sum ___________ ___________ Workshop or Similar Dialogue
00470 Task 7: (Optional) Conduct Field Sampling 2 Months ___________ ___________ for an additional 20 sites/month for 2 months (TBD by Government)
00480 Task 8: (Optional) Conduct Field Sampling 2 Months ___________ ___________ at an additional 30 sites/month for 2 of the
00490 Task 9: (Optional) Collect Additional Data 1 Lump Sum ___________ ___________
OPTION YEAR FOUR TOTAL ____________
If 6-month extension of services is required per FAR 52.217-8, the prices for the Option to Extend Service’s term will be calculated based on the prorated term and prices that are in effect at the time the option is exercised.