Mt. Elbert Pumped Storage Powerplant Unit 1 Rotor Crack Repair

Price Schedule

B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

MT. ELBERT PUMPED STORAGE POWERPLANT

UNIT 1 ROTOR CRACK REPAIR

FRYINGPAN-ARKANSAS PROJECT, COLORADO

B.1 PRICE SCHEDULES

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offerors shall complete the price schedule and submit in Volume 2 – Price Schedule. No pricing information shall be included in Volume 1 – Statement of Qualifications.

(c) Price Schedule A will be awarded as Firm Fixed Price. Price Schedule B will be awarded as Not-To-Exceed. If exercised, Optional Price Schedule C will be awarded upon completion of the 45 percent design.

(d) Price Schedule B or Optional Price Schedule C, as applicable, to be definitized and converted to a Firm Fixed Price upon the completion of the 90 percent design as detailed in the Technical Criteria Package.

(e) Offerors shall complete Table A, Price Schedule A, Price Schedule B, and Optional Price Schedule C.

(f) Definitions:

(1) CLIN – Contract Line Item Number

Table A - Overhead and Profit Item # Category Design (%) Construction (%) 1 Job Management/General/Field Overhead and Costs

2 Bonds and Insurance 3 Home Office Overhead (General and

Administration)

4 Profit

B - 2

Price Schedule A – Rotor Investigation and Design Recommendations

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

A1 WBR

1452.232 -81

Bonds Only For the lump sum of $ $

A2 01 81 05 Rotor Investigation and Design Recommendations

For the lump sum of $ $

Price Schedule B – Rotor Crack Repair (BASE PROPOSAL)

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

B1 01 81 05 Design Rotor Repair For the lump sum of $ $

B2 FAR

52.246-

Warranty For the lump sum of $

B3 WBR

1452.23 2-81

Construction Mobilization and Preparation - Repair

For the lump sum of $

B4 01 81 05 Construct and Install Rotor Spider Repair

For the lump sum of $

B5 01 81 05 Inspect Rotor Spider For the lump sum of $

B6 01 81 05 Commissioning For the lump sum of $

TOTAL BASE PROPOSAL AMOUNT (A + B1 through B6) $

B7 01 81 05 Over and Above Rotor Defect Repair (See H-2) (OPTION)

300 in3 $ NTE $100,000

B - 3

Price Schedule C – Rotor Spider Replacement (OPTION PROPOSAL)

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

C1 01 81 05 Design Rotor Replacement For the lump sum of $ $

C2 FAR

52.246-

Warranty For the lump sum of $

C3 01 81 05 Fabricate Complete Rotor Assembly

For the lump sum of $

C4 WBR

1452.23 2-81

Construction Mobilization and Preparation

For the lump sum of $

C5 01 81 05 Construction and Install Rotor Spider Replacement

For the lump sum of $

C6 01 81 05 Inspect Rotor Spider For the lump sum of $

C7 01 81 05 Commissioning For the lump sum of $

TOTAL OPTION PROPOSAL AMOUNT (A + C1 through C7)

C8 01 81 05 Cost/Deduct for Rotor Design, Fabrication, and Installation compatible with existing stator core and field poles (OPTION)

For the lump sum of + $______

OR

END OF SUPPLIES OR SERVICES AND PRICES/COSTS