PRICE COST SCHEDULE.pdf
PDF 103 KB Posted
- Attached to
- J047--Mobile Boiler Piping Relocation
- Solicitation number
- 36C25722Q0183
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722Q0183 0001.docx | DOCX document | |
| 36C25722Q0183 0001.pdf | ||
| 36C25722Q0183 - QUESTION AND ANSWERS.pdf | ||
| Wage Determination.pdf | ||
| SOW Mobile Boiler Piping Relocation.pdf | ||
| 36C25722Q0183.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Relocate temporary boiler piping [ Natural Gas, Fuel oil supply and return, and boiler feed water] to have valves accessible from inside boiler plant at ground level. Make a new penetration in boiler plant wall for piping and case penetration with steel reinforcement. fabricate and install sheet metal cover on wall around piping at the penetration on both sides of the wall.
Terminate piping outside wall for future boiler connection. Insulation is included.
GRAND TOTAL __________________