PRICE-COST SCHEDULE .docx
DOCX document 16 KB Posted
- Attached to
- 6515--Brand Name Steris or Approved Equal - Reprocessing Sinks WJB Dorn VA Medical Center Columbia, SC
- Solicitation number
- 36C24720Q1052
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24720Q1052_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4.00 |
| EA |
| __________________ |
| __________________ |
CE1223
Two stations without timer or water control sensor, Stainless steel, Knee operated water ON/OFF Two stations without timer or water control sensor Stainless steel Manual knee operated water ON/OFF
| 4.00 |
| EA |
| __________________ |
| __________________ |
CE00006
CHAIR CARRIER-DBL SINK
| 8.00 |
| EA |
| __________________ |
| __________________ |
CE0000003
LAMINAR FLOW FAUCET HEAD FOR FLEXMATIC AND STREAMLINE SCRUB STATIONS.
| 4.00 |
| EA |
| __________________ |
| __________________ |
CE0000001
Eye Wash Fixture for Flexmatic and Streamline Scrub Stations
| 4.00 |
| EA |
| __________________ |
| __________________ |
CE00003
UNIM SCREEN -UNIT AFTER 1/76
| 4.00 |
| EA |
| __________________ |
| __________________ |
SCRUB SINK STATION INFRARED 5 YEARS COMPREHENSIVE. COMPREHENSIVE IS ALL-INCLUSIVE SERVICE COVERAGE; PARTS, LABOR, AND TRAVEL FOR ALL SCHEDULED PREVENTIVE MAINTENANCE INSPECTIONS AND UNLIMITED REPAIRS ARE INCLUDED. EXCLUDED FROM COVERAGE ARE ACCESSORIES AND COMSUMABLE/EXPENDABLE ITEMS.
| 4.00 |
| EA |
| __________________ |
| __________________ |
Install Dual or Triple Scrub Station Installation shall include all necessary labor (non-union) and materials required to uncrate, set-in-place and assemble equipment. Price shall be for normal working hours, Monday – Friday 8 am -5 pm unless otherwise noted. Also includes with Installation Services an operational check-out test, any necessary adjustments and a demonstration of the equipment for appropriate facility personnel.
• Two Stations
| 2.00 |
| EA |
| __________________ |
| __________________ |
CE1233
Three stations without timer or water control sensor, Stainless steel, Knee operated water ON/OFF Three stations without timer or water control sensor Stainless steel Manual knee operated water ON/OFF
| 2.00 |
| EA |
| __________________ |
| __________________ |
CE00007
CHAIR CARRIER/TRIPLE SINK
| 2.00 |
| EA |
| __________________ |
| __________________ |
CE0000001
Eye Wash Fixture for Flexmatic and Streamline Scrub Stations
| 6.00 |
| EA |
| __________________ |
| __________________ |
CE0000003
Laminar Flow Faucet Head for Flexmatic and Streamline Scrub Stations
| 4.00 |
| EA |
| __________________ |
| __________________ |
CE00003
UNIM SCREEN -UNIT AFTER 1/76
| 2.00 |
| EA |
| __________________ |
| __________________ |
Scrub Sink 3 Stations Manual 5 Yrs Comprehensive Comprehensive with all-inclusive service coverage; parts, labor and travel for all scheduled Preventive Maintenance inspections and unlimited repairs included.
| 2.00 |
| EA |
| __________________ |
| __________________ |
Install Dual or Triple Scrub Station Installation includes all necessary labor (non-union) and materials required to uncrate, set-in-place and assemble equipment. Price is for normal working hours, Monday – Friday 8 am -5 pm unless otherwise noted. Also includes with Installation Services an operational check-out test, any necessary adjustments and a demonstration of the equipment for appropriate facility personnel.
• Two Stations
| GRAND TOTAL |
| __________________ |
File details come from the government source that posted it. Updated .