This is a Price Breakdown template for the Modernize Generator Project (36C26126R0031) at the Department of Veterans Affairs Honolulu campus. The document outlines a comprehensive construction project structure organized by CSI divisions, with line items for material, equipment, labor, and total costs. The project encompasses extensive work across multiple construction disciplines including general requirements, demolition, concrete, metals, thermal and moisture protection, openings, finishes, fire suppression, plumbing, HVAC systems, electrical installations, communications infrastructure, electronic safety and security systems, earthwork, and exterior improvements. Cost categories include project management, quality control, superintendent services, safety oversight, mobilization, shop drawings, testing and inspections, commissioning, and specialized services such as asbestos abatement and seismic restraint requirements.
The template includes provisions for bonds, insurance, home office overhead, and profit margin calculations, with subtotal and grand total lines for project pricing. This price breakdown serves as Attachment A to the solicitation and corresponds to Project #459-24-001, which addresses remediation for site deficiencies at the VA Honolulu facility per the draft statement of work and specifications. The document is structured to allow contractors to itemize costs across all required work components, providing a detailed basis for proposal evaluation and contract administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Form - 36C26125R0031 Modernize Generators.docx | DOCX document | |
| 36C26126R0031_1 Modernize Generators.pdf | ||
| Modernize Generator System Final Specifications 2026-04-03.pdf | ||
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| Wage Determination HI20260001 Jan 16 2026.pdf | ||
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.pdf | ||
| Modernize Generator System Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A - Price Breakdown 36C26126R0031 - Project # 459-24-001, Modernize Generators Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total
| Project Manager/QC |
| Superintendent/Safety |
| Mobilization |
| Division 01 - General Requirements |
| General Requirements |
| Project Schedule |
| Shop Drawings |
| Safety Requirements |
| Quality Control |
| Testing Laboratory Services |
| Special Inspections |
| Temporary Environmental Controls |
| Construction Waste Management |
| Sustainable Construction Requirement |
| General Commisioning Requirements |
| Division 02 - Existing Conditions |
| Site Surveys |
| Demolition |
| Traditional Asbestos Abatement |
| Division 03- Concrete |
| (Short-Form) Cast-in-Place Concrete |
| Division 05- Metals |
| Metal Fabrication |
| Division 07- Thermal and Moisture Protection |
| Firestopping |
| Thermal Insulation |
| Joint Sealants |
| Division 08- Openings |
| Hollow Metal Doors |
| Door Hardware |
| Division 09- Finishes |
| Non-Structural Metal Framing |
| Gypsum Board |
| Resilient Base and Accessories |
| Painting |
| Division 10- Specialties |
| Wall and Door Protection |
| Fire Extinguisher Cabinets |
| FIRE EXTINGUISHERS |
| Division 13- Special Construction |
| Seismic Restraint Requirements for Non-Strutural Components |
Division 14- Conveying Equipment
| Division 21- Fire Supression |
| Wet-Pipe Sprinkler Systems |
Division 22- Plumbing
| Division 23- Heating, Ventilating, and Air Conditioning (HVAC) |
| Common Work Results for HVAC |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| Noise and Vibration Control for HVAC Piping and Equipment |
| HVAC and Boiler Plant Insulation |
| Commissioning of HVAC Systems |
| Direct-Digital Control System for HVAC |
| Facility Fuel Systems |
| Division 26- Electrical |
| Requirements for Electrical Installations |
| Low-Voltage Electrical Power Conductors and Cables |
| Grounding and Bonding for Electrical Systems |
| Raceway and Boxes for Electrical Systems |
| Underground Electrical Construction |
| Overcurrent Protective Device Coordination Study |
| Commissioning of Electrical Systems |
| Wiring Devices |
| Motor Controllers |
| Engine Generators |
| Division 27- Communications |
| Grounding and Bonding for Communications Systems |
| Requirements for Communications Installations |
| Conduits and Backboxes for Communication System |
| Structure Cabling |
| Communications Optical Fiber Backbone Cabling |
| Commicationcopper Horizontal Cabling |
| Division 28- Electronic Safety and Security |
| Common Work Results for Electronic Safety and Security |
| Conductors and Cables for Electronic Safety and Security |
| Grounding and Bonding for Electronic Safety and Security |
| Conduits and Backboxes for Electronic Safety and Security |
| Fire Detection and Alarm |
| Division 31- Earthwork |
| Earthwork |
| Dewatering |
| Division 32- Exterior Improvements |
| Cement and Concrete for Exterior Improvements |
| Asphalt Paving |
| Chain Link Fences and Gates |
| Planting |
| Bonds |
| Insurance |
| Home Office Overhead |
| Profit |
SUB-TOTAL