Prevailing Wages TA-685-270-001.pdf
PDF 222 KB Posted
- Attached to
- TA-685-270-001 (IQC) Slate Roof Repair / Thermal Energy Improvement / TPO Install and Fluid Applied
- Solicitation number
- BPM059719
- Issued by
- Carroll County, Maryland
About this file
This is a Prevailing Wages Request form for a capital improvement project located at the DPSCS Police Correctional Training Center in Sykesville, Maryland. The project, designated TA-685-270-001, encompasses slate roof repairs and Building-Up Roofing (BUR) system upgrades to a 20-year No-Defect Limit (NDL) Thermoplastic Polyolefin (TPO) roofing system, along with complete chiller and automated control system replacements. The project has an estimated total value of $3,772,764.00, which exceeds the $250,000 threshold requiring prevailing wage compliance.
The document serves as a prevailing wages request submitted in connection with the project's planning and budgeting phases. No specific bidding deadlines, site visit schedules, or contract award dates are referenced in the provided content. The form indicates that prevailing wage requirements will apply to this project due to its substantial value and scope of work, requiring contractors and subcontractors to comply with applicable prevailing wage standards for the jurisdiction and work classifications involved.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U:\Projects\Maintenance Engineering\TA-685-270-001_DPSCS_Police Correctional Training Center\Jessica\Prevailing Wages Request TA-685-270-001.docx
Prevailing Wages Request
*For projects with a total value of $250,000 or more
Project Number: TA-685-270-001
Project Name: SLATE ROOF REPAIR / THERMAL ENERGY IMPROVEMENT/ THERMOPLASTIC
POLYOLEFIN (TPO) ROOFING SYSTEM & FLUID APPLIED
Project Location: DPSCS Sykesville, Maryland 21784
Estimated Value: $3,772,764.00
Description of Work: Work covers slate roofing repairs and BUR upgrade to a 20-year NDL TPO system, alongside complete chiller and automated control system replacements.
File details come from the government source that posted it. Updated .