draft_Schedule of Rates_page_1_2.pdf

PDF 156 KB Posted

Attached to
Pilotage Services at Kin-Nakagusuku Bay and Naha Port, Okinawa, Japan
Solicitation number
PreSol-N6264925QGA01
Issued by

About this file

This document is a draft Schedule of Rates for Solicitation N6264925QGA01, covering maritime vessel services for two federal agencies (CFAO and MSCO) from 1 January 2026 to 30 June 2030. The schedule includes detailed rate tables for various naval vessel types with different tonnages and drafts, such as LHD, LPD, LSD, CG, DDG, FFG/LCS, MCM, and SSN, as well as auxiliary vessels like T-AO, T-AKE, T-AOE, T-EPF, T-ARC, T-ARS, and T-AKR. The document outlines estimated quantities for each vessel type across a base year and Option Year I, with placeholder pricing in Japanese Yen (¥), indicating rates will be competitively determined.

The second page provides additional context about rate structures, specifically noting day-time and night-time rates referenced in the Performance Work Statement (PWS) sections 9.1 and 9.2. It also instructs quoters to provide pricing for standard and nighttime cancellation charges, with references to specific PWS sections. The cancellation and waiting charge sections suggest complex pricing mechanisms will be involved in the final contract, with detailed guidelines for different service scenarios and time-based rate differentials.

View the file

Other files

File Type Posted
draft_Performance Work Statement.pdf PDF
draft_Schedule of Rates_page_2_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For CFAO

CLIN SLIN Type of Ship Tonnage Draft (m) Est. Qty. Unit Price Ext. Total

0001AA 150 -¥ -¥

0001AB 60 -¥ -¥

0002AA 110 -¥ -¥

0002AB 80 -¥ -¥

0003AA 110 -¥ -¥

0003AB 80 -¥ -¥

0004AA 50 -¥ -¥

0004AB 40 -¥ -¥

0005AA 600 -¥ -¥

0005AB 200 -¥ -¥

0006AA 50 -¥ -¥

0006AB 30 -¥ -¥

0007AA 204 -¥ -¥

0007AB 120 -¥ -¥

0008AA 120 -¥ -¥

0008AB 60 -¥ -¥

For MSCO

CLIN SLIN Type of Ship Tonnage Draft (m) Est. Qty. Unit Price Est. Total

1001AA 10 -¥ -¥

1001AB 5 -¥ -¥

1002AA 150 -¥ -¥

1002AB 40 -¥ -¥

1003AA 5 -¥ -¥

1003AB 5 -¥ -¥

1004AA 5 -¥ -¥

1004AB 5 -¥ -¥

1005AA 5 -¥ -¥

1005AB 5 -¥ -¥

1006AA 5 -¥ -¥

1006AB 5 -¥ -¥

1007AA 5 -¥ -¥

1007AB 5 -¥ -¥

1008AA 5 -¥ -¥

1008AB 5 -¥ -¥

1009AA 5 -¥ -¥

1009AB 5 -¥ -¥

T-EPF (NMP) 9,781 4.8

Estimated Subtotal:

Estimated Subtotal:

T-ARS (NMP) 2,857 5.2

T-ARS 2,857 5.2

T-AKR 73,204 11.0

T-EPF 9,781 4.5

T-ARC 15,929 7.9

T-AKE 43,758 9.0

T-AOE 48,500 12.0

10.0

7,000

7.2

6.7

10.5

9.8

4.5

4.8

9.8

1,500

CG

27,000

17,000

10,000

9,000

LPD

LSD

DDG

FFG/LCS

Base Year : 1 January 2026 - 31 December 2030

LHD/LHD 42,000 9.0

4,000

T-AO 25,444

MCM

SSN

Solicitation N6264925QGA01 Schedule of Rates

: Indicates Night-time Rate

"Day-time" Rate: Refer to PWS section 9.1.

Cancellation Charge

Quoters shall fill in the price for the Standard Cancellation Charge and Night time Cancellation Charge

Waiting Charge Refer to 9.3 of the Performance Work Statement.

"Night-time" Rate: Refer to PWS section 9.2

Standard Cancellation Charge Ref. PWS 9.4.1

Nighttime Cancellation Charge Ref. PWS 9.4.2

JPY

JPY

Option Year I : 1January 2030- 30 Jun 2030

For CFAO

CLIN SLIN Type of Ship Tonnage Draft (m) Est. Qty. Unit Price Ext. Total

2001AA 15 -¥ -¥

2001AB 6 -¥ -¥

2002AA 11 -¥ -¥

2002AB 8 -¥ -¥

2003AA 11 -¥ -¥

2003AB 8 -¥ -¥

2004AA 5 -¥ -¥

2004AB 4 -¥ -¥

2005AA 60 -¥ -¥

2005AB 20 -¥ -¥

2006AA 5 -¥ -¥

2006AB 3 -¥ -¥

2007AA 24 -¥ -¥

2007AB 12 -¥ -¥

2008AA 12 -¥ -¥

2008AB 6 -¥ -¥

For MSCO

CLIN SLIN Type of Ship Tonnage Draft (m) Est. Qty. Unit Price Est. Total

1002AA 1 -¥ -¥

1002AB 1 -¥ -¥

1002AC 15 -¥ -¥

1002AD 4 -¥ -¥

1002AE 1 -¥ -¥

1002AF 1 -¥ -¥

1002AG 1 -¥ -¥

1002AH 1 -¥ -¥

1002AJ 1 -¥ -¥

1002AK 1 -¥ -¥

1002AL 1 -¥ -¥

1002AM 1 -¥ -¥

1002AN 1 -¥ -¥

1002AP 1 -¥ -¥

Solicitation N6264925QGA01 Schedule of Rates

LHD 42,000 9.0

LPD 27,000 7.2

LSD 17,000 6.7

CG 10,000 10.5

DDG 9,000 9.8

FFG/LCS 4,000 4.5

MCM 1,500 4.8

SSN 7,000 9.8

Estimated Subtotal:

T-AOE 48,500 12.0

T-EPF 9,781 4.5

T-AO 25,444 10.0

T-AKE 43,758 9.0

T-ARC 15,929 7.9

T-ARS 2,857 5.2

T-AKR 73,204 11.0

1002AQ 1 -¥ -¥

1002AR 1 -¥ -¥

1002AS 1 -¥ -¥

1002AT 1 -¥ -¥

: Indicates Night Time Rates

Estimated Subtotal:

T-ARS (NMP) 2,857 5.2

T-EPF (NMP) 9,781 4.8

Base
Option I

File details come from the government source that posted it. Updated .