This presolicitation notice provides details for the construction of a new ANT Storage Building and related demolition and sitework at USCG Station Milford Haven in Hudgins, Virginia. The project includes demolishing four existing buildings and constructing a new 4,239 square foot ANT Storage Building near the station's main entry. The new building will contain offices, workstations, storage, shops, a boat bay, locker rooms, and related facilities. The solicitation will be issued in early April 2024 as a total set-aside for Women Owned Small Businesses with a response due date of April 2nd, 2024. The period of performance is approximately 240 calendar days from notice to proceed. The construction value is estimated between $1,000,000 to $5,000,000. All questions must be submitted in writing to the issuing contracting specialist by the specified date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRESOLICITATION NOTICE

Subject: Construct ANT Storage Building & Remodel UPH Heads in Station Building

GENERAL INFORMATION

Solicitation Number: 70Z08324RCLEV0040

Place of Contract Performance: USCG STATION MILFORD HAVEN- 63 Millpoint Road, Hudgins, VA 23076-2005

Product Service Code: Y1EB Construction of Structures and Facilities

Set-aside Status: Women Owned Small Business (WOSB)

Closing Response Date: April 2nd ,2024

CONTACT INFORMATION

Contact Point: Connie Taylor

Contract Specialist

USCG Civil Engineering Unit - Cleveland

1240 E. Ninth Street, Room 2179

Cleveland, OH 44199

PROJECT DESCRIPTION

The Contractor shall provide all labor, materials, equipment, transportation and supervision necessary for the following:

1.1 Sitework:

1.1.1 Four existing buildings – MK Shop, BM Shop, ANT Building and Locker Room shall all be demolished. The demolition shall include removal of all foundations, elevated concrete slabs and cutting and capping all existing utilities. The existing concrete slab between the water edge and the four buildings being demolished shall also be removed.

The demolition of the buildings shall not occur until the new ANT Storage Building is complete.

1.2 Construction of a new ANT Storage Building:

1.2.1 The 4,239 s.f. building shall be located near the main entry of the base. An existing house shall be demolished where the new ANT Storage Building shall be built. The new building shall be a wood structure with composite siding and an asphalt shingle roof. A new drive shall be provided for boat access into the boat storage area. The ANT Storage

Building program shall contain the spaces:

A. Three (3) offices, four (4) work stations and a plan/chart file area.

B. Administrative storage closet and a computer server closet.

C. Locker Room – male (7) and female (3), common washdown/drying area

D. Single use men and women restrooms including a shower unit in each restroom.

E. Laundry Room.

F. Janitor’s Closet

G. Battery charging room and Hazmat storage closet.

H. Boat Bay – 50’ long minimum, 20’ high minimum.

I. BM Shop and MK Shop.

J. Area for storing forklift.

K. Mezzanine area for storage.

PROJECT DESCRIPTION

The solicitation will be advertised as a total Women Owned Small Business (WOSB) Set-Aside. The applicable

NAICS code is 236220 with a size standard of $45 million. The solicitation will be issued around early April 2024.

The period of performance is approximately 240 calendar days from the issuance of the Notice to Proceed. The

Construction magnitude is expected to be between $1,000,000 and $5,000,000. All questions must be submitted in writing to the issuing office via email to CS Connie Taylor at Connie.s.taylor@uscg.mil.