This document outlines the scope of work for a federal construction project. The project involves road paving and bike lane construction along 0.5 miles of Snug Harbor Road near Cooper Landing, Alaska. Work includes excavation, grading, slope stabilization, retaining wall installation, and drainage structure rehabilitation. An estimated price range between $2-3 million is provided. The project is scheduled for completion in fall 2020. Required work is organized into standard construction divisions including earthwork, slope reinforcement, aggregate base courses, asphalt paving, drainage, erosion control, traffic control, and landscaping/turf establishment. The related federal contract opportunity lists the solicitation and agency details as the Alaska PFH 59(2), Snug Harbor Road Paving and Bike Lane, Phase 2 project through the Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AK PFH 59(2) Prelim Letter_10-Sept-2020.pdf | ||
| af05902_Pre-Ad Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK PFH 59(2), Snug Harbor Road Paving and Bike Lane, Phase II
The work consists of excavation grading, slope stabilization, retaining wall work and ditch reestablisthment.
Project length: .5 miles
Tentative Fixed Completion Date: Fall 2020
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $2,000,000.00 and $3,000,000.00
Location: 2 Miles S of Cooper Landing, Alaska
DESCRIPTION OF WORK IN US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll, check dams
158 Watering for Dust Control
DIVISION 200 – Earthwork
201 Clearing & Grubbing 3.7 acres 202 Additional Clearing & Grubbing (clearing & grubbing) ch ed ul e
Sc h
Na m e
203 Removal of Structures & Obstructions (structures, demolition) Riprap blanket removal
204 Excavation & Embankment 62,000 CUYDS
205 Rock Blasting: Controlled Blast Hole (rock blasting)
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No
207 Earthwork Geosynthetics
208 Structure Excavation
211 Roadway Obliteration
212 Linear Grading
213 Subgrade stabilization
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap 2,600 LNFT of ditch 252 Rockery, Special Rock Embankment, and Rock Buttress
253 Gabions & Revet Mattresses
255 Mechanically Stabilized Earth Walls (retaining walls) 2,200 SQFT.
256 Permanent Ground Anchors
(ground anchors)
257 Contactor-Designed Retaining Walls (contractor completed designs)
258 Reinforced Concrete Retaining Walls (retaining walls)
259 Soil Nail Retaining Walls
260 Rock Bolts & Dowels
261 Reinforced Soil Slopes
270 Compaction Grouting
271 Geotechnical Exploration ch ed ul e
Sc h
Na m e
273 Polyurethane Resin Injection (PUR)
274 Vibro Columns
275 Geofoam
DIVISION 300 – Aggregate and Base Courses
301 Untreated Aggregate Courses (crushed aggregate) 302 Minor Crushed Aggregate
303 Road Reconditioning
304 Full Depth Reclamation
305 Full Depth Reclamation With Cement
306 Full Depth Reclamation With Asphalt
307 Cement Treated Aggregate Course
309 Emulsified Asphalt Treated Base Course (crushed aggregate)
310 Cold In-Place Recycled Asphalt Base Course
311 Stabilized Aggregate Surface Course
312 Dust Palliative
313 Aggregate-Topsoil Course
314 Stockpiled Aggregates
DIVISION 400 – Asphalt Pavements & Surface Treatments
401 Asphalt Concrete Pavement By Gyratory Mix Design Method 403 Asphalt Concrete 160 ton
405 Open-Graded Asphalt Friction Course
406 Fog Seal ch ed ul e
Sc h
Na m e
407 Chip Seal
408 Cold Recycled Asphalt Base Course
409 Micro Surfacing
410 Slurry Seal
411 Asphalt Prime Coat (asphalt surface treatment)
412 Asphalt Tack Coat (asphalt surface treatment)
413 Asphalt Pavement Milling
414 Asphalt Pavement Crack Sealing & Filling
415 Paving Geotextiles
418 Asphalt Concrete Pavement Patching
429 Bonded Wearing Course
DIVISION 500 – Rigid Pavement
501 Minor Concrete Pavement
502 Concrete Pavement Restoration
DIVISION 550 – Bridge Construction
551 Driven Piles
552 Structural Concrete (concrete – major structures)
553 Prestressed Concrete
554 Reinforcing Steel
555 Steel Structures (structures, steel)
556 Bridge Railing
557 Timber Structures (structures, timber) ch ed ul e
Sc h
Na m e
558 Dampproofing
559 Waterproofing (concrete – major structures)
560 Removal of Concrete By Hydrodemoltion
561 Structural Concrete Injection & Crack Repair
562 Temporary Works
563 Painting (structures, painting)
564 Bearing Devices
565 Drilled Shafts
566 Shotcrete
567 Micropiles
568 High Performance Concrete
569 Concrete Overlays For Bridge Decks
574 Geosynthetic Reinforced Soil Integrated Bridge System
575 Minor Bridge Work
576 Pile Encapsulation
577 Plastic Structures
580 Alternate Bridge
582 Helical Piles
DIVISION 600 – Incidental Construction
601 Minor Concrete Structures (concrete – minor structures)
602 Culverts & Drains (indicate one or both)
603 Structural Plate Structures (culverts & drains)
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) ch ed ul e
Sc h
Na m e
605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) 2,700 LNFT
606 Corrugated Metal Spillways
607 Cleaning, Relaying, & Repairing Existing Drainage Structures
608 Paved Waterways (culverts & drains)
609 Curb & Gutter (concrete – minor structures) (indicate which)
610 Horizontal Drains
611 Water Systems
612 Sanitary Sewer Systems
613 Simulated Stone Masonry Surface (concrete – minor structures)
614 Lean Concrete Backfill
615 Sidewalks, Pads & Paved Medians
(concrete – minor structures)
616 Slope Paving
617 Guardrail
618 Concrete Barriers & Precast Guardwalls
619 Fences, Gates, Cattle Guards & Bollard Posts 130 LNFT
620 Stone Masonry
621 Monuments & Markers (construction survey & staking) (yes/no) No
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
624 Topsoil (landscaping & related items) 24,000 SQYD.
625 Turf Establishment
(indicate seeding or mulching separately) 24,000 SQYD.
626 Plants, Trees, Shrubs, Vines & Groundcovers ch ed ul e
Sc h
Na m e
627 Sod
629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 24,000 SQYD.
633 Permanent Traffic Control (traffic control devices)
634 Permanent Pavement Markings (traffic pavement markings)
635 Temporary Traffic Control – Flagger 2,500 hours
635 Temporary Traffic Control – Pilot Car 850 hours
635 Temporary Traffic Control – All Req’d
636 Traffic Signal, Traffic Counter, Lighting, & Electrical Systems
637 Facilities & Services (field offices, laboratories, & housing)
645 Locating Utilities
646 Roadside Development (use pay item description)
647 Environmental Mitigation (use pay item description)
650 Temporary Diversions
651 Rockfall Protection
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
| DIVISION 500 – Rigid Pavement |
| DIVISION 550 – Bridge Construction |