This document provides specifications for improvements to the Heart O' the Hills Entrance Station in Olympic National Park, Washington. The work includes earthwork, pavement, grading, concrete, utility relocation, signing, striping, and minor safety upgrades along 17 miles of roadway. Estimated costs range from $1 million to $2 million. Key tasks involve clearing, grubbing, structure removal, excavation and embankment, geosynthetics, aggregate base courses, asphalt paving, structural concrete, reinforcing steel, culverts and drains, curbs, sidewalks, guardrails, gates, signs, pavement markings, temporary traffic control, electrical systems installation, and construction of a support building including a flagpole and kiosk foundation. The solicitation number is 69056720B000027 and is being issued by the Department of Transportation Federal Highway Administration for improvements at the Heart O' the Hills Entrance Station in Olympic National Park, Washington.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NPS OLYM 12(1), Heart O the Hills Entrance Station Improvements
The work consists of earthwork, pavement, grading, concrete work, utility relocation, signing, striping, minor safety improvements.
Project length: 17 Miles
Tentative Fixed Completion Date: July 2021 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $1,000,000 and $2,000,000
Location: 5 miles S of Port Angeles, WA
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control Silt Fence Fiber Roll Check Dam (fiber roll)
32 LF
1087 LF
11 EA
DIVISION 200 – Earthwork 201 Clearing & Grubbing All (LPSM) ch ed ul e
Sc h
Na m e
203 Removal of Structures & Obstruction Pipe Culvert Self Pay Kiosk 25 KVA Pad Mounted Transormer Flag Pole and FOundaltion Terminal Section Curb Curb and Gutter Guardrail Sewerline Waterline Cable Line Building Utility conduits Sawcutting Pavement
3 EA
1 EA
1 EA
1EA
8 EA
140 LF
60 LF
140 LF
620 LF
200 LF
500 LF
All All
770 LF
204 Excavation & Embankment Roadway Excavation Subexcavation Select Borrow
1770 CY
370 CY
380 CY
207 Earthwork Geosynthetics Geotextile Filer, Class 1, Type A Inulation Board, Polystryrene
2480 SY
50 SY
208 Structure Excavation Structural Backfill
220 CY
80 CY
212 Site Grading 2700 SY
DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate, Method 2 480 CY
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete Pavement, Type 2 700 T 412 Tack Coat (asphalt surface treatment) 310 Gal
DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) 60 CY ch ed ul e
Sc h
Na m e
554 Reinforcing Steel, Epoxy Coated 4950 LB
DIVISION 600 – Incidental Construction 602 Culverts & Drains
18” CMP
24” CMP
18” End Section 24” End Section
12 LF
170 LF
2 EA
4 EA
609 Curb & Gutter Curb, Concrete 16” Depth Curb, Concrete 18” Depth Curb and Gutter, Concrete, 13” Depth
21 LF
421 LF
45 LF
611 Water System, Complete 4-Inch Waterline, Building roof underdrain
All
90 LF
612 Sanitary Sewer Systems All 615 Sidewalk, concrete Accessibility Ramp, Concrete Detectable Warning Panels
90 SY
4 EA
6 SY
617 Guardrail System G4, Type 2, Class A Steel pos Terminal Section Type Tangent
150 LF
8 EA
619 Gate, Metal, 16 Feet width Bollard Past (4 inch) Bollard Post (8 inch) Remove and reset gate
1 EA
2 EA
11 EA
1 EA
622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 633 Sign System Sign System, Government Furnsihed Sign Rumble Strip Remove and reset sign
15 EA
1 EA
550 LF
5 EA
634 Permanent Pavement Markings Type B, Turn Arrow Type B “Only” work message Type B Accessibility symbol
825,480 FL
1 EA
1EA
17 EA
635 Temporary Traffic Control – Flagger 160 Day
635 Temporary Traffic Control Cone Drum Portable Changeable Message Sign Plastic Fence Construction Sign Supervisor
100 EA
30 EA
2 EA
250 LF
300 SF
80 Day
636 System Installation, Electrical (complete) System Installation, Changeable Message Sign System Installation, Traffic Detector System Conduit, 1 Inch PVC Conduit, 1 1.4 inch PVC Conduit, 2 Inch PVC Utility Box, Junction Box Utility Box, Concrete Utility Trench
All All All
80 LF
220 LF
5++0 FL
3 EA
2 EA
1915 LF
646 Building, Support Building Fixture, Flag Pole (35-foot pole and foundation) Fixture, Kiosk (Foundation)
All
1 EA
All
| DIVISION 200 – Earthwork |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
| DIVISION 550 – Bridge Construction |
File details come from the government source that posted it. Updated .