Prescott VA Substation Project Single Line.pdf

PDF 755 KB Posted

Attached to
H261--Facility Electrical Maintenance, Inspections, and Testing
Solicitation number
36C26223Q0670
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APS

MAIN SOURCE

APS

ALTERNATE SOURCE

PM-15

500 KVA

208/120V-3PH

PM-1

225 KVA

208/120V-3PH

SWITCHGEAR WITH APS FEED

APS XFR

SWITCH

SC676116

N.C. N.C. N.C.

N.C.

A.S.A.S.

A.S. A.S.

50 51

V

A 50 51 A

FEEDER 1 FEEDER 2

REDIRECTED EAST 12.47 KV LOOPREDIRECTED WEST 12.47 KV LOOP

A.S.

MVB-4

12.47kV

1.7MW

GEN 1

11 A

A

MVATS-X2 MVATS-X1

GF-1

MVB-1

1200A ACB

500MVA

MVB-2

1200A ACB

500MVA

MVB-3

1200A ACB

500MVA

A.S.

M

NEAR BLDG 111 BOILER HOUSE

GF-1 GF-1

BLDG 22

BLDG 23

BLDG 31

BLDG 32

BLDG 153

A

B

A 11

11 A

V.S.

BLDG 14

B A

8A B

TO PV ARRAY CONTROLLER

PM-46

1500 KVA

480Y/277V

HH9

APS ALTERNATE

SOURCE FROM POLE (OVHD)

FROM PM-9

TO PM-2

U

(EXISTING 4" C W/ 3-1/O SOLID)

REMOVE & REPLACE CONDUCTORS

FROM EXISTING APS

POLE 497273 (OVHD)

File details come from the government source that posted it. Updated .