This document provides a prequalified sources list and details for an upcoming federal construction contract opportunity. The prequalified sources list identifies companies approved to provide deep mix method, soil-bentonite and slag cement-bentonite cutoff walls, earthwork, and jet grout capabilities for levee improvement projects in Sacramento, California. The related federal contract opportunity will be an invitation for bid to construct 1.8 miles of varying types of seepage cutoff walls along the Sacramento River East Levee, including open trench soil-bentonite and slag cement-bentonite cutoff walls, deep mix method cutoff walls, and jet grout cutoff walls. Additional scope includes utility relocations, work adjacent to an active railroad, relief well modifications, removal and replacement of a city sump, and contaminated soil handling. Night work is permitted for jet grout construction only. All work must be completed by December 2021 with levee reconstruction by September 2021. The solicitation will proceed unrestricted using contractors from the prequalified sources list and is estimated to issue on October 30th with bids due November 30th.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prequalified Sources List (PSL) for Cutoff Wall Construction in Support of the Sacramento District Levee Improvement –

Seepage and Stability Constriction Contracts

26 November 2019 Revised 23 December 2019

Revised 26 August 2020 (annual on-ramping) updated 15 October 2020 (Great Lakes to Forgen name change only)

1) As defined in Defense Federal Acquisition Regulation Supplement (DFARS) 236.272 Prequalification of Sources may be used when necessary to ensure timely and efficient performance of critical construction projects.

2) Pursuant to the United States Army Corps of Engineers (USACE) Acquisition Instruction (UAI) 5136.272, the Chief of Contracting in the pay grade of General Schedule GS-15 is delegated by the Head of the Contracting Activity to authorize the use of prequalification by determining, in writing, that a construction project is of an urgency or complexity that requires prequalification.

3) On 24 October 2019, the Chief of Contracting, Sacramento District determined that it was in the best interest of the Government to use prequalification procedures in support of the USACE Cutoff Wall Levee Improvement – Seepage and Stability Construction Contracts.

4) On 25 October 2019, the Sacramento District posted the announcement of the Prequalified Sources List (PSL) on Federal Business Opportunities (FBO).1

5) On 27 April 2020, the Sacramento District posted the annual on-ramping for the Prequalified Sources List (PSL) to include the addition of Jet Grout capabilities.

6) Based on the procedures approved in the aforementioned determination and the revised minimum prequalification standards, the following list of prequalified contractors, is hereby established. The table below represents the companies individually approved for DMM Cutoff Walls, SB & SCCB Cutoff Walls, Earthwork and Jet Grout.

1 As of 12 November 2019, FBO was replaced by beta.SAM.gov.

DMM Cutoff Walls SB & SCCB Cutoff Walls

Earthwork Jet Grout

Raito Odin Nordic Treviicos Malcolm International

Maloney-Odin Odin Pacchiosi

JAFEC Forgen (previously Great Lakes)

Maloney-Odin

Keller Ahtna-Great Lakes Kiewit Treviicos Geo-Solutions Forgen (previously Great Lakes)

Nordic Ahtna-Great Lakes Treviicos (SCCB only)

7) Please note your Company will be required to maintain the “prequalified” team or a collaboration of contractors included on the PSL when bidding on projects issued against the PSL or provide supporting information for any new team member added.

Additionally, this will need to be supported by letters of commitment at the time of submission of your bid.