This document is a Request for Qualifications (RFQ) issued by the Town of Grafton Board of Sewer Commissioners for the construction of improvements to the existing 2.4 mgd wastewater treatment plant (WWTP). The project includes construction of a phosphorus removal system with pumping station, new UV disinfection facilities, improvements to secondary treatment systems, grit and screenings improvements, primary settling tank improvements, new odor control systems, upgrades to the existing sludge pumping systems, new chemical systems, installation of new sludge thickening and septage receiving equipment, a new generator, process and control building improvements, drainage and site improvements, and solar PV. The RFQ is seeking qualified general contractors and filed sub-contractors for various trades, including tile work. The estimated cost of the project is $36 million. The deadline for submitting Statements of Qualifications (SOQs) is August 20, 2015 at 2:00 PM EST.

The RFQ indicates that general contractors and filed sub-contractors must be pre-qualified to bid on the project. Interested firms can obtain the RFQ from the office of CDM Smith Inc. in Boston, MA. The project will be funded through the State Revolving Fund (CWSRF-3990).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF GRAFTON WASTEWATER TREATMENT PLANT IMPROVEMENTS

PROJECT NO. CWSRF-3990 REQUEST FOR QUALIFICATIONS (RFQs)

In accordance with ST. 2004. c. 193 and M.G.L. c. 149 § 44 (A -M), the Town of Grafton

Board of Sewer Commissioners is seeking qualified general contractors and filed sub-contractors to submit Statements of Qualifications (SOQs) for the construction of improvements to the existing 2.4 mgd wastewater treatment plant (WWTP) including construction of a phosphorus removal system with pumping station and new UV disinfection facilities, as well as improvements to and new structures associated with secondary treatment systems necessary to meet NPDES permit effluent requirements, grit and screenings improvements including a new screening channel, primary settling tank improvements including a valve chamber, new odor control systems, upgrades to the existing sludge pumping systems, new chemical systems, installation of new sludge thickening and septage receiving equipment, a new generator, process and control building improvements including new laboratory and administrative facilities, drainage and site improvements, solar PV, and all other work necessary to complete the work under this Contract including demolition, site work, yard piping, plumbing, fire protection, HVAC, electrical and instrumentation and controls.

Sub-bid categories include: masonry; miscellaneous and ornamental iron; waterproofing, dampproofing and caulking; roofing and flashing; metal windows; glass and glazing;

tile*; acoustic tile; resilient floors; painting; plumbing; heating, ventilation and air conditioning; and electrical work.

*Please note this advertisement is only for the addition of TILE as a filed sub-trade category requiring prequalification. Please note the revised submission date of August

20, 2015 at 2:00 PM EST. No other modifications have been made.

Any contractor seeking to be prequalified as both a general contractor and subcontractor for a particular filed sub-bid trade(s) is required to file separate responses to this RFQ.

The estimated cost of this project is $36 million dollars. Interested firms may pick up the

RFQs from the office of CDM Smith Inc, 75 State Street, Suite 701, Boston, MA 02109

Attn: William Dana Green (617-452-6639) beginning on August 5th, 2015. RFQs may also be mailed, faxed or emailed, as requested. General contractors and filed sub-contractors must be pre-qualified to bid on the project. The deadline when SOQs are due is Thursday, August 20th, 2015 at 2:00 PM for both sub-contractors and general contractors. The SOQ shall be submitted to the Board of Sewer Commissioners c/o Mr.

Paul Cournoyer, Grafton Memorial Municipal Center, 30 Providence Road, Grafton, MA

01519.