PreproposalMeeting_042426.pdf

PDF 1 MB Posted

Attached to
Professional Consulting Services Continuing Contracts
Solicitation number
26-039EN-RFQu
Issued by
Hillsborough County, Florida

About this file

This is a pre-proposal meeting presentation for the City of Plant City, Florida's Request for Qualifications (RFQu) for continuing professional consulting services in utilities engineering and related disciplines. The City seeks qualified firms to provide on-call support across four primary discipline categories: Water/Wastewater/Reclaimed Water Conveyance Systems and Staff Augmentation; Water and Wastewater Treatment Process; Environmental and Sustainability; and Electrical, Instrumentation and Controls, SCADA, and Systems Integration. The utilities department manages extensive infrastructure including one Water Reclamation Facility with a permitted capacity of 10 million gallons per day, four water treatment plants, 265 miles of potable water mains, 160 miles of gravity sewer mains, 57 wastewater lift stations, and various other conveyance systems. The pre-proposal meeting occurred on April 24, 2026, at 2:00 p.m. at 902 N Mobley Street in Plant City, Florida. The question submission deadline is May 4, 2026, at 5:00 p.m., and proposals are due by May 14, 2026, at 2:00 p.m. Evaluation committee meetings are scheduled for May 27, 2026. Respondents must submit separate responses for each discipline category, with submissions limited to 50 pages maximum. The anticipated contract term extends for three years with renewal options available.

Evaluation criteria include firm qualifications (20 points), ability of professional personnel and staff experience (35 points), project approach and responsiveness (20 points), current and project workload (10 points), location and accessibility (8.5 points), minority business enterprise status (5 points), and local preference (1.5 points). The City anticipates selecting multiple firms to ensure adequate capacity and specialized expertise. Current ongoing project needs include lift station retrofits and replacements, collection system rehabilitation, water treatment plant construction, direct potable reuse preliminary design, master plan updates, facility planning, water reclamation facility process evaluation, and staff augmentation. Upcoming projects encompass additional lift station work, water main construction, on-call modeling support, asset management services, GIS and plan review support, water reclamation facility expansion, construction of Water Treatment Plant 6, and direct potable plant development with environmental compliance and instrumentation improvements. All questions must be directed to the Plant City Procurement Department.

View the file

Other files

File Type Posted
Professional_Consulting_Services_Continuing_Contracts_(Addendum_#2_Revision).pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
JMTs_CoPC_Library_of_Eng_Services_21-020EN-FC.pdf PDF
Mead__26_Hunt.pdf PDF
OHC_Environmental_RFQ_21-020EN-FC_Plant_City.pdf PDF
PPM_Consultants_2C_Inc._RFQ_21-020-EN-FC_Library_of_Engineering_Services_for_Continuing_Contracts_(Cat_3).pdf PDF
PreproposalMeeting_042426.pdf PDF
RK_26K.pdf PDF
SGM_Submittal_RFQ_21-020EN-FC_Library_of_Engineering_Continuing_Contracts.pdf PDF
SinghofenAssociates_RFQ21-020EN-FC_PlantCity.pdf PDF
Southeastern_Surveying.pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
KCA_City_of_Plant_City_Library_of_Engineering_Svcs_for_Cont_Contracts_RFQ_21-020EN-FC.pdf PDF
Nova_-RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
Reiss_-_Plant_City_RFQ_21_20_EN_FC_.pdf PDF
Halff_Associates_Inc.pdf PDF
Hydro_Solutions_Consulting.pdf PDF
KPI_Engineering_16-014EN-MS.pdf PDF
Kimley-Horn_submittal_for_Plant_City_RFQ_21-020EN-FC.pdf PDF
Madrid_CPWG_Response_to_Plant_City_-_Library_of_Engineeing_Services.pdf PDF
Maser_Consulting_Response_to_RFQ_21-020EN-FC_Plant_City.pdf PDF
OCI_Associates_2C_Inc.pdf PDF
ARMINIUS_CATEGORY_6.pdf PDF
Arehna_FQ_21-020EN-FC.pdf PDF
Atkins_RFQ-21-020EN-FC-Plant-City-FL-Gen-Eng-Svc.pdf PDF
Black_and_Veatch_RFQ21020ENFC.pdf PDF
Boggs_Enginering_RFQ_Response.pdf PDF
Carollo_Engineers.pdf PDF
CivilSurv.pdf PDF
DRMP_PlantCity_RFQ_21-020EN-FC.pdf PDF
DTC-RFQ_21-02EN-FC_Library_of_Engineering_Services_for_Continuing_Contract.pdf PDF
Wood_Bid_21-020EN-FC_Proposal_Final_12102020.pdf PDF
Applied_Sciences_Consulting.pdf PDF
Boggs_Enginering_RFQ_Response.pdf PDF
Carollo_Engineers.pdf PDF
Chastain_Skillman_SOQ-Plant_City_RFQ_2321-020EN-FC.pdf PDF
Curtoom_Libraries_of_Engineering_Services_RFQ_21_020EF_FC.pdf PDF
Florida_Transportation_Engineering.pdf PDF
Water_and_Wastewater_Engineering_Solutions.pdf PDF
Wood_Bid_21-020EN-FC_Proposal_Final_12102020.pdf PDF
Woodard__26_Curran.pdf PDF
Capital_Consulting_Solutions.pdf PDF
Conemco_RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
GLE_Plant_City_RFQ_21-020EN-FC_Response.pdf PDF
Griner_Engineering_Inc_RFQ_Response.pdf PDF
2026-04-13_-_General_Engineering_Continuing_Agreement_-_Work_based_on_Work_order_(1).pdf PDF
2026-05-07_-_Surveying_and_mapping_-_by_Work_Order.pdf PDF
2026-05-07_-_Surveying_and_mapping_-_by_Work_Order.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuing Professional Consulting Services Plant City Utilities

Request for Qualifications

4/24/2026Utilities

• RFQ ID: 26-030UA-RFQu

• Request for Proposals Advertised: April 14, 2026

• Pre-Proposal Meeting : April 24, 2026, 2:00 pm

902 N Mobley St, Plant City, FL 33563

• Question Submission Deadline: May 04, 2026, 5:00 pm

• Proposal Submission Deadline: May 14, 2026, 2:00 pm

• Evaluation Committee Meetings: May 27, 2026

• https://procurement.opengov.com/portal/plantcitygov https://procurement.opengov.com/portal/plantcitygov

Submittal Instructions

• Plant City Procurement Department is the ONLY staff designated and authorized to answer questions.

• Separate Responses for each Discipline.

• 50 Pages Max.

• Name the proposal correctly.

Ex. ABC_Category3

Highlights

• Contract Terms

• Fee

• Contract Documents

• Insurance Requirements

• Proposal Format

• Evaluation Committee

It is anticipated that multiple firms may be selected to ensure adequate capacity, specialized expertise, and responsiveness.

Disciplines Anticipated

Discipline Category 1

• Water/Wastewater/Reclaimed Water Conveyance Systems/Staff Augmentation

Discipline Category 2

• Water and Wastewater Treatment Process

Discipline Category 3

• Environmental and Sustainability

Discipline Category 4

• Electrical, Instrumentation and Controls, SCADA, and Systems Integration

Evaluation Criteria

Firm Qualification, Ability of Prof Personnel and

Staff Experience, 35Project Approach and

Responsiveness, 20

Current and Project Workload, Location / Accessibility, 8.5

Minority Business Enterprise, 5

Local Preference, 1.5

CPC Utilities

1 Water Reclamation Facility 4 Water Treatment Plants 57 Wastewater Lift Station Mains 265 miles of Potable Water Mains 46 miles of Reclaimed Water

Mains 160 miles of Gravity Sewer Mains 55 miles of Force Mains

Utilities Department

4/24/2026City Powerpoint Template

Operation

• Water Treatment

• Water Reclamation

• Regulation

• Water Quality

Maintenance

• Distribution

• Collection

• Pumping Operation

• Electrical, Instrumentation and Control

Environmental Compliance

• Cross-Connection Control Program

• Water Conservation Program

• MS4 Permit

• Industrial

Pretreatment Program

WRF Overview

Plant City Water Reclamation Facility Location: 1500 Victoria Street FDEP Permit Number: FL0026557 Current Permitted Capacity: 10 MGD Surface Water Discharge – 6 MGD to Itchepackesassa Creek

Project Needs

Growth

Asset Management

Repair and Rehabilitation

Operation and Maintenance

Ongoing Projects

Lift Station 7 Retrofit Lift Station 11 Force Main Bypass Lift Station 2 Force Main Replacement Collection System R&R McIntosh Park Wetland Gilchrist Park Canal Restoration Water Treatment Plant 5 Construction Direct Potable Preliminary Design Master Plan Updates Facility Plan WRF Process Evaluation Local Limit Study MISC permitting and regulation reporting support Asset Management SCADA Evaluation Staff Augmentation

Upcoming Projects

Lift Station 9 Replacement Lift Station 12 and 22 Replacement Lift Station 5 Force Main Replacement Trapnell Road Water Main Construction On-Call Modeling Support Asset Management Staff Augmentation – GIS, Plan Review, and CEI WRF Expansion

WTP 6

Direct Potable Plant Environmental Compliance Instrumentation and Control Improvement

Questions?

Utilities

Continuing Professional Consulting Services
Request for Qualifications
Submittal Instructions
Highlights
Disciplines Anticipated
Evaluation Criteria
CPC Utilities
Utilities Department
WRF Overview
Project Needs
Ongoing Projects
Upcoming Projects
Slide Number 13

File details come from the government source that posted it. Updated .