This document contains minutes from a pre-proposal conference and site visit for a federal construction contract opportunity. The Department of the Air Force Pacific Air Forces is seeking to modernize the existing Misawa Air Base Hospital in Japan through 225 square meters of new building additions and 1701 square meters of renovation work. The pre-proposal conference provided an overview of the solicitation requirements, including a firm-fixed-price contract structure and a performance period of 1200 calendar days. A subsequent site visit allowed prospective offerors to observe the project locations and existing conditions. Proposals are due by April 27, 2021 with questions accepted until April 9.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
35TH FIGHTER WING (PACAF)
MISAWA AIR BASE, JAPAN
7 Apr 21
MEMORANDUM FOR ALL PROSPECTIVE OFFERORS
FROM: 35th Contracting Squadron, Plans & Programs/Specialized Flight
Bldg. 656, Misawa Air Base, Misawa-shi, Aomori-ken, Japan
SUBJECT: Pre-proposal Conference Minutes & Record of Site Visit, Request for Proposal (RFP) No.
FA520521R0003, Project No. 1090686, Hospital Modernization, Misawa Air Base, Japan
1. These are minutes of the pre-proposal conference and its subsequent site visit conducted for the subject solicitation on 5 Apr 21, in accordance with FAR 52.236-27 “Site Visit (Construction) – Alternate I” and the Solicitation Attachment 3, Other Contact Requirements, paragraph 9. L001 “Notice of Pre-Bid/Pre-Proposal Conference”. The pre-proposal conference was held at 35th Contracting Squadron’s conference room, Bldg.
656, Misawa Air Base, Japan, with attendance of the representatives of the following firms and the government’s individuals:
Firms (Alphabetical order) Government American Engineering Corporation Maj Taylor Valentine, 35 CES/CEN Fujimoto Kensetsu K.K. 2d Lt Ross Minigutti, 35 CES/CENM Green Hospital Supply Inc. Mr. Nicholas Bloomer, 35 CES/CENM Sankyo Tekunosu Corporation Mr. John McCown, 35 CES/CEN Suzuki Kensetsu Kogyo Co. Ltd. Mr. Yasuhiro Yonaiyama, 35 CES/CENMD Urakawa Kensou Co. Ltd. Mr. Mitsuhiro Kashiwazaki, 35 CES/CENMD
Mr. Yukihiro Tashima, 35 CES/CENMD Mr. Shuushin Tanaka, 35 CES/CENMC Capt Byron Muhlenberg, 35 CONS/DBO 2d Lt Thao Truong, 35 CONS/PKP Mr. Takafumi Nosaki, 35 CONS/PKP
2. Outline of Pre-proposal Conference and Site Visit conducted.
a. Pre-proposal Conference. The purpose of the conference/site visit is to enhance the “exchange of information” encouraged in FAR 15.201. The conference was opened by 2nd Lt Truong/Contract Administrator (CA) at 1310 hours who proceeded to present the topics contained on the briefing slides (Attachment 1, Pre-proposal Conference Briefing Slides). All attendees were reminded that:
All questions asked must be formally submitted to 35 CONS in the form of questionnaire and/or request for clarification later;
Any technical questions deemed to be critical by the government engineers and the Contracting
Officer (CO) must be submitted in writing to 35 CONS; and
Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing (ref. Solicitation Attachment 3, “Other Contract Requirements”, paragraph 9, L001(c)).
(1) Solicitation Briefings by 35 CONS. The general scope and requirements, and filling instructions of the solicitation including proposal preparation instruction and proposal evaluation procedures were explained by 2nd Lt Truong with Japanese translation by Mr. Nosaki. At the conclusion, approximately 1330 hours, the CA turned over the briefing to 35 CES to present the technical portion of the proposed project to enhance the understanding of the project requirements.
(2) Technical Briefings by 35 CES. The technical briefing on the project requirements and phasing was presented by 2nd Lt Minigutti with Japanese translation by Mr. Yonaiyama in accordance with the specifications and drawings (Attachment 2, Technical Briefing Slides).
(3) Questions and Answers. No questions were asked during the above briefing sessions.
(4) The conference was ended at around 1400 hours and moved to the site visit locations.
b. Site Visit. Subsequent to the pre-proposal conference, the scheduled site visit was conducted at the hospital starting at 1415 hours, by the attendees. The site visit was led by Mr. Jones, Facility Manager, and all attendees observed the existing condition of each section where required to be renovated and the portion of the building addition required under this project.
(1) Questions and Answers during Site Visit. No questions were asked during the site visit.
(2) The site visit concluded at approximately 1600 hours and all attended prospective offerors were reminded that any questions should be submitted to 35 CONS in writing not later than 9 Apr 21, and the proposal closing time/date is 02:00 PM (JST) on 27 Apr 21.
3. Accordingly, the pre-proposal conference and the site visit were concluded at 1615 hours.
THAO N. TRUONG, 2d Lt, USAF Contract Administrator
Approved:
BYRON H. MUHLENBERG, Capt, USAF Contracting Officer
Attachments:
1. Pre-proposal Conference Briefing Slides, 25 slides
2. Technical Briefing Slides, 30 slides cc: 35 CES/CENM
TRUONG.THAO.N
GOC.1391422741
Digitally signed by
TRUONG.THAO.NGOC.13914227
Date: 2021.04.07 13:22:44 +09'00'
MUHLENBERG.BYRON.
HENRY
KRESS.1033442145
Digitally signed by
MUHLENBERG.BYRON.HENRY
KRESS.1033442145
Date: 2021.04.08 16:46:55 +09'00'
Mission – People - Safety
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th FW Misawa Air Base
Pre-proposal Conference / Site Visit RFP No. FA520521R0003
Project No. 1090686 Hospital Modernization, Misawa Air Base, Japan
35 CONS/PKP
35 CES/CENM
5 Apr 21 1300 hours
Summary
Scope & Requirements
General Requirement / Pricing Structure
Solicitation
CONS remarks for solicitation / filling instructions
CES Technical Briefing
Q&A Session
Site Visit
Location Map
Hospital Bldg. 99
Main Gate
School BX
Commissary
LNG Plant
Scope & Requirements (Cont’d)
Project Description (Sec. B):
Hospital Modernization: 225 square meters of new building additions, 1701 square meters of renovation and temporary facilities during construction for the existing Misawa AF Hospital.
Place: Main Base, Bldg. 99
Contract Type: Firm-Fixed-Price (FFP)
Performance Period: 1200 Calendar Days (incl. 30 CD mobilization)
Solicitation
Fill-in
Complete block 14 through 20
RFP – Page 2
Solicitation (Cont’d)
Fill-in
RFP – Page 3
RFP – Page 4
Fill-in
Section F
FAR 52.211-12 Liquidated Damages @¥63,606 (1st day) & @¥38,416 (2nd day ~)
RFP – Page 6
Section I
DFARS 252.204-7004 Antiterrorism Awareness Training for Contractors Contractor personnel who require routine physical access to military installation shall complete Level 1 antiterrorism awareness training within 30 days of requiring access and annually thereafter
FAR 52.223-3 Hazardous Material Fill-in
RFP – Page 11
RFP – Page 12
Section J
RFP – Page 21
Section K
FAR 52.204-8 Annual Reps & Certs
FAR 52.204-24 Reps Certain Telecom & Video Surveillance Svc or Equipment
FAR 52.209-7 Responsibility Matters
DFARS 252.204-7007 Alt. A, Annual Reps & Certs
Fill-in
RFP – Page 22~
RFP – Page 25~
RFP – Page 27~
RFP – Page 28~
Other Contract Requirements
Para. 6, Special Contract Requirements:
H002 Required Insurance Property Damage - ¥2,000,000
H003 Performance Bond Submit within 30 CD after the award date of contract
Require additional if Mod > $10,000
Atch 3 – Page 3
(Cont’d)
Para. 8, Reps, Certs & Other Statements of Offerors
K001 Tax Exemption under SOFA Fill-in
Atch 3 – Page 4
Total amount of consumption tax
¥53.80 x Est. Gas QTY for 1200 CD
¥32.10 x Est. Diesel QTY for 1200 CD
(Cont’d)
Para. 8, Reps, Certs, & Other Statements of Offerors (cont’d)
K002 Contractor’s Cert
K003 Const. Contractor License Offeror shall submit “special construction license” under applicable law together with offer, to demonstrate compliance with FAR 52.236-7, as modified, and DFARS 252.225-7042
Joint Venture or Partnership – the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offer
Such offer that fails in representation of the above required license will not be considered for award
Fill-in
Submit
Atch 3 – Page 5
Section L
FAR 52.204-7 System for Award Management Offeror is required to be registered in SAM when submitting an offer
L-100 Proposal Preparation Instructions Offerors are required to meet all sol. requirements, terms & conditions, reps & certs, and tech. requirements
Prepare & Submit:
Part I – Summary and Misc. Data (Submit Orig.+ 1 Copy) Part II – Price Proposal (Submit Orig.+ 1 Copy) Part III – Past Performance Proposal (Submit Orig. + 1 Copy)
Submit
RFP – Page 31
RFP – Page 33
Section L (cont’d)
Part I – Summary & Misc. Data (Submit Orig.+ 1 Copy)
Concise summary & Master Table of Contents of the Entire Proposal
Signed SF 1442 (Page 1 & 2) Acknowledgement of the all sol. amendments, if issued Fill-ins/Cert in Section I thru K and Atch 3
Section I (pages require a fill-in) Section K (its entirely) Atch 3 para. 8 (pages require a fill-in)
Affirmation of no exceptions, deviations, or waivers, if none proposed
Submit
Section L (cont’d)
Part II – Price Proposal (Submit Orig.+ 1 Copy)
Completed Section B (Page 3 & 4)
Section L (cont’d)
Part III – Past Performance Proposal (No more than 5 pages per contract / Submit Orig.+ 1 Copy) Past Performance Information (see next slide for detail)
No more than 5 contracts within 5 years Quality & Satisfaction Rating of Contracts
Any info currently available (letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts
Past/Present Performance Questionnaire (PPQ) Use Atch. 10 of RFP Customer/POC evaluator must directly send PPQ to the CO Do not include in proposal package
Past Performance Information
Solicitation (Cont’d)
1 Company/Division name
2 Contract/Project Title
3 Contracting Agency/Customer
4 Contract Number
5 Contract Dollar Value (use FY21 budget rate of ¥107.9114 if conversion is necessary)
6 Period of Performance
7 Verified, up-to-date name, mailing and e-mail addresses, and telephone number of the contracting officer (Point-of-Contact)
8 Comments regarding compliance with contract terms and conditions
9 Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions
10 Include rationale supporting your assertion of relevance and identify aspects (scope, magnitude of effort, and complexity) of the contracts deemed relevant and how they relate to the proposed effort
Section L (cont’d)
Past Performance Questionnaire (PPQ) Atch 9 & 10
Submit
Request for PPQ
Send a completed PPQ within 10 days after receipt of PPQ request
Offeror Customer/POC
Evaluator
35 CONS/PKP
E‐mail:
miyako.fujimoto.jp@us.af.mil takafumi.nosaki.jp@us.af.mil
FAX: 0176‐52‐4793
Mail: 35th Contracting Squadron Attn: Mr. Takafumi Nosaki Bldg. 656, Misawa Air Base, Hirahata, Misawa‐shi, Aomori‐ken, Japan 033‐0012
Section M
M-900 Basis for Contract Award Subjective Tradeoff (STO) best value source selection Weight of Importance: Past performance is approximately equal to price
Evaluation Process:
Price – Fairness and reasonableness of the price. The Gov’t reserves the right to perform price realism analysis Past Performance – Recent and Relevant performance information
RFP – Page 37 ~
Section M (Cont’d)
Past Performance Factor Recency: Work within the last 5 years Relevancy: Performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation
Integrated Assessment The Gov’t reserves the right to award a contract to other than the lowest price offer Best value award decision using the Price and the Past
Performance Confidence Rating
CES Technical Briefing
All questions asked must be formally submitted to 35 CONS in the form of questionnaire and/or request for clarification later
Any technical questions deemed to be critical by the government engineers and the Contracting Officer must be submitted in writing to 35 CONS Example:
Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications.
Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing (ref. Solicitation Attachment 3, “Other Contract Requirements”, para 9, L001(c))
Q&A
No. Target Document Reference Question 1 Specification Volume 1 Section 01 11 00
Para. 1.2.3 xxxxxxx
2 Drawing GI005 xxxxxxx
Let’s move on to Site Visit but please be reminded
RFP Closing Date / Time:
27 Apr 21 / 02:00 PM (JST)
Questions shall be submitted to 35 CONS/PKP miyako.fujimoto.jp@us.af.mil / takafumi.nosaki.jp@us.af.mil / thao.truong.2@us.af.mil
NLT 9 Apr 21
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th Fighter Wing
Mission – People – Safety
35 CONS & 35 CES
5 April 2021
Hospital Modernization Site Visit Project No. 1090686
Purpose for Site Visit
Gather to confirm the scopes by the qualified, experienced and capable firms who are interested in performing the project.
Mission – People – Safety 2
Agenda
Project Summary
Site Visit to Hospital (Bldg. 99)
Mission – People – Safety 3
Project Summary
225 square meters of new building additions, 1701 square meters of renovation and temporary facilities during construction for the existing Misawa AF Hospital.
Mission – People – Safety 4
Project Summary (Cont’d)
Project scope includes site work modifications, new addition footings and foundations, structure frame, exterior wall and roof construction, demolition of existing interior construction, new interior walls, ceilings, door and finishes, mechanical, electrical, plumbing, communications and fire and life safety systems for the new and renovated areas.
Mission – People – Safety 5
Project also includes replacement mechanical systems for areas receiving no architectural renovation and communication, fire and life safety systems throughout the entire hospital. Departments affected by architectural renovation include Dental, Sterile Processing, Nutrition Services, Pharmacy, and Medical Records.
Mission – People – Safety 6
Period of Performance: 1,200 calendar days (CDs) incl.
30 CDs mobilization
Phases can be done concurrently but sub phases must be done in sequence (example: A and B phase can happen at the same time but A2 must be after A1, B2 must be after B1)
Mission – People – Safety 7
01 42 00.00 33 contains the acceptable JIS standards
CFUSM is provided as Attachment 6 of the RFP
Mission – People – Safety 8
Most difficult part of the project will be coordination between the different Hospital teams
Drawing GI104 lists restrictions of each flight/unit, certain phases will require construction only during weekends or nights
Schedule must be set to allow for IO&T (initial outfitting and transition) contractor the required amount of down time between sub phases to allow for refurbishment
Mission – People – Safety 9
Project Phasing
Mission – People – Safety 10
A2 A2
A1
A1
LOWER LEVEL
Project Phasing (A1, A2)
Demo, Architectural, Electrical, HVAC/Plumbing and Fire Sprinkler/ Alarm/Mass notification system installation is required during both A1 and A2 phase
Departments Affected: Medical Logistics, Tricare, Health Promotions flight and Medical Surgical Unit
A1 estimated 6 months, A2 estimated 9 months construction time
Mission – People – Safety 11
Project Phasing (Cont’d)
Mission – People – Safety 12
B1
GROUND LEVEL
Mission – People – Safety 13
B1/2
B2 B2
B2
Project Phasing (B1, B2)
Demo, Architectural, Electrical, HVAC/Plumbing, Fire Sprinkler/ Alarm/Mass notification system installation and mobilization of SPD trailer during phase B
Departments Affected: Medical Logistics, Surgical Services Flight, Maternal Newborn Unit and Medical Surgical Unit
B1 estimated 9 months, B2 estimated 8 months construction time
Phase B involves the most extensive HVAC/Plumbing repairs
Mission – People – Safety 14
Mission – People – Safety 15
C1
Project Phasing (C1)
All disciplines required for Phase C, most extensive system commissioning, electrical and demo required during Phase C
Departments Affected during C1: Dental Squadron, Information Systems Flight
7 months estimated construction time for C1
Mission – People – Safety 16
Mission – People – Safety 17
C2
Project Phasing (C2)
Departments Affected during C2: Dental Squadron, Information Systems Flight
10 months estimated construction time for C2
Mission – People – Safety 18
Mission – People – Safety 19
C3
Project Phasing (C3)
Departments Affected during C3: Dental Squadron
5 months estimated construction time for C3
Mission – People – Safety 20
Mission – People – Safety 21
C4
Project Phasing (C4)
Departments Affected during C4: Dental Squadron, Information Systems Flight
12 months estimated construction time for C4
Mission – People – Safety 22
Mission – People – Safety 23
C5
Project Phasing (C5)
Departments Affected during C5: Dental Squadron
7 months estimated construction time for C5
Mission – People – Safety 24
Mission – People – Safety 25
D1
Mission – People – Safety 26
D2
Mission – People – Safety 27
PENTHOUSE
Project Phasing (D1, D2)
Demo, Architectural, Electrical and HVAC repairs required during this phase
Departments Affected: Pharmacy Flight, Tricare Flight
D1 estimated 2 months, D2 estimated 6 months construction time
Mission – People – Safety 28
Site Location Map
*need to add slide here about important spec sections
Mission – People – Safety 29 to
Base Hospital (Bldg. 99)
Mission – People – Safety 30
| Pre-proposal Conference Minutes & Record of Site Visit RFP No. FA520521R0003, Hospital Modernization |