This is a Pre-Proposal Meeting Agenda for the DNR Rifle River Recreation Area Improvements project (Reference 751.22334.MAA) conducted by the Michigan Department of Natural Resources on August 3, 2022. The state is seeking a Professional Services Consultant (PSC) to provide design and construction administration services for campground and day-use area improvements at Rifle River Recreation Area. Project scope includes existing condition assessments and design services for new sanitary sewer systems, upgraded electrical systems, and new water service at both the campground and Beach House day-use facility; pavement replacement and site grading/drainage improvements; barrier-free design in compliance with 1966 Public Act 1, Michigan Rehabilitation Code for Existing Buildings, and the Americans with Disabilities Act; and structural assessment of an existing cable strand bridge with potential repair or complete replacement recommendations. The PSC is responsible for verifying base information, preparing all construction documents, obtaining required governing agency approvals, and preparing as-built record drawings. The project will require Phases 300 (Schematic Design) and 500 (Final Design) services with standard 50 percent and 90 percent design reviews. Questions are due Wednesday, August 10, 2022 at noon, with an addendum issued by Friday, August 12, 2022. Proposals are due Thursday, August 18, 2022 at 2:00 p.m., with contract and kick-off meeting scheduled for Thursday, September 8, 2022 at 9:00 a.m. Site visits were conducted during the pre-proposal meeting.
Proposals will be evaluated by committee on an 80 percent technical and 20 percent cost basis, with evaluation occurring approximately one week before the committee meets for award. Proposals must be submitted through SIGMA VSS in files not exceeding 6 megabytes at a time and should demonstrate understanding of the specific project rather than include general boilerplate language. Proposers must provide a realistic design schedule including plan for construction with specific dates and submit an estimate of the construction budget. Reimbursable expenses are project-specific and detailed in the sample contract; eligible reimbursables will be outlined in project documents. Limited AutoCAD files and available drawings are available, with additional files to be provided to the successful firm on a flash drive. All contract documents and addenda are posted on Sigma VSS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 220803_Sign In Sheet.pdf | ||
| RFP Billable Rate 22334.pdf | ||
| SAMPLE Billable Rate Contract (Rev 220207).pdf | ||
| Project Statement 22334.pdf | ||
| Addendum 1 22334.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Meeting Agenda DNR-Rifle River Recreation Area Improvements
751.22334.MAA
8/3/2022 R.1
1. Attendance
a. Sign in Sheet - can represent only one company, make sure company name submitting bid is what is shown
b. Introductions
2. Meeting Overview
a. Project Overview, RFP highlights, common questions
b. Small group so feel free to ask questions
c. Email directly to me alvarom1@michigan.gov
d. Tour Site
3. Project Statement:
a. Professional services consultant (PSC), who will provide professional (design and construction administration services) for Rifle River Recreation Area Campground and Day Use Areas The campground improvement work will require existing condition assessments and design services for a new sanitary sewer, an upgraded electrical system, and a new water service.
b. Pavement replacement in the modern campground was completed in 2020. Inclusive with this work are any site improvements (grading/drainage) needed to address any of the associated utility improvements.
c. The Rifle River Recreation Area Day Use includes a Beach House in need of renovations that require condition assessments and design services for a new sanitary sewer, an upgraded electrical system, a new water service, and road/parking lot pavement rehabilitation. Inclusive with this work are any site improvements needed to address any of the associated utility/road improvements. The alterations will include barrier free design requirements of 1966 Public Act 1, the current Michigan Rehabilitation Code for Existing Buildings, and the federal Americans with Disabilities Act.
d. Additionally, there is an existing cable strand bridge that requires a structural assessment that may result in repairs to the existing bridge or a complete replacement. This bridge is in constant need of repair and the cutting of the riverbanks are beginning to affect the bridge headwalls.
e. The PSC shall be responsible for verifying and gathering accurate base information, preparation of all necessary construction documents, approval of these documents by the required governing agencies, and final as-built record drawings. There shall be the standard 50 percent and 90 percent reviews for the Phase 300 and 500 services, with additional meetings dedicated to idea generation and conceptual design development with project team.
4. PSC Tasks
a. What Phases: 300 & 500.
5. Project Documents
a. All contract documents are on Sigma VSS, addendum will be posted there.
b. See RFP document for how proposal is to be structured for NTE Billable Rate.
c. Description of Phases, etc.
i. 100: Study Services
ii. 200: Program Analysis
iii. 300: Schematic Design
iv. 400: Preliminary Design
v. 500: Final Design
vi. 600: Construction Administration-Office Services
vii. 700: Construction Admi9nistrastion – Field Services
d. Proposals will be evaluated by a committee and scored based on 80% technical and 20% cost.
e. Show that you understand the specific project. General boilerplate language is not needed.
f. Submit on SIGMA only., (6megs at a time)
6. Site Visits
a. Additional site visits. If any requests for pictures let me know.
b. Collect all information needed today. If additional information is needed contact me.
c. Take all the pictures you need.
7. Project Schedule
a. Questions Due: Wednesday August 10, 2022, at Noon.
b. Addendum Issued: Friday August 12, 2022, (probably by 2:00)
c. Proposals Due: Thursday August 18, 2022 at 2:00, Thursday
d. Evaluation will take place & Award Process, usually about 1 week before committee meets
e. Contract/Kick Off Meeting: Thursday September 8, 2022 at 9:00am
f. Propose a realistic schedule in your proposal for design including plan for construction. Include dates.
8. Construction Budget
a. Please give an estimate of Construction Budget in Proposal
9. Reimbursables
a. Project Specific. See Project Statement.
b. See Sample Contract for eligible expenses, reimbursables, etc.
10. Review Project Statement.
a. Additional comments by the project team?
b. Attachments; N/A
c. Available drawings/AutoCAD files limited; files will be provided to successful firm on flash drive.
11. Attendance reminder
12. Questions? If any come up during the tour be sure they are directed to me via email.
13. Thank you for your interest.