About this file
This is a preliminary bid results document from the Oregon Department of Transportation (ODOT) for a Clear Zone Tree Removal project on Interstate 5 at Siskiyou Summit, solicitation number S-73000-00009015. The project encompasses tree trimming, brushing, vegetation clearing, and removal of dead trees capable of reaching the roadway across six sections of Interstate 5 (mileposts 4.68 through 9.64) and the center median, with stump and brush treatment included for all sections. Five contractors submitted bids for the work: Sheets Trucking & Excavation, Top Notch Tree Service, Backwoods General Contracting LLC, Trees Plus Northwest LLC, and Timber Ridge Contracting, LLC. The bid opening occurred on January 12, 2024, at 11:00 AM.
The bid results show significant pricing variation among contractors across the eight line items (mobilization, temporary traffic protection and direction, and six geographic sections of tree removal work). Sheets Trucking & Excavation submitted the lowest total bid at $78,915.00, followed by Top Notch Tree Service at $95,000.00, Backwoods General Contracting LLC at $189,883.00, Trees Plus Northwest LLC at $218,500.00, and Timber Ridge Contracting, LLC at $382,052.00. All pricing is on a lump-sum basis per line item. The document clearly states that preliminary results do not constitute an award, indicating the evaluation process was still ongoing at the time of this document's issuance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lentils.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ODOT BID ITEMS
| PRELIMINARY RESULTS: ESB Interstate 5 Siskiyou Summit: Clear Zone Tree Removal S-73000-00009015 | |||||||||||||
| Bidder name: | Sheets Trucking & Excavation | Top Notch Tree Service | Backwoods General Contracting LLC | Trees Plus Northwest LLC | Timber Ridge Contracting, LLC | ||||||||
| January 12, 2024 @ 11:00 AM | |||||||||||||
| QTY | UNIT | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | ||
| 1 | Mobilization | 1 | LS | $3,225.00 | $3,225.00 | $ 12000.00 | $12,000.00 | $3,000.00 | $3,000.00 | $ 10500.00 | $10,500.00 | $ 51750.00 | $51,750.00 |
| 2 | Temporary Protection & Direction of Traffic | 1 | LS | $26,000.00 | $26,000.00 | $ 19000.00 | $19,000.00 | $38,340.00 | $38,340.00 | $ 21500.00 | $21,500.00 | $ 87012.50 | $87,012.50 |
| 3 | Interstate 5 (MP 4.68-5.96) Section 1 - Tree Trimming, |
Brushing, Clearing of vegetation. Remove all dead trees capable of reaching the roadway, Stump and brush
| treatment. | 1 | LS | $9,245.00 | $9,245.00 | $ 4000.00 | $4,000.00 | $16,252.00 | $16,252.00 | $ 30000.00 | $30,000.00 | $ 42300.00 | $42,300.00 |
| 4 | Interstate 5 (MP5.96 – 7.08) Section 2 - Tree Trimming, |
Brushing, Clearing of vegetation. Remove all dead trees capable of reaching the roadway, Stump and brush
| treatment. | 1 | LS | $9,135.00 | $9,135.00 | $ 16,000.00 | $16,000.00 | $37,262.00 | $37,262.00 | $ 28,000.00 | $28,000.00 | $ 41,080.50 | $41,080.50 |
| 5 | Interstate 5 (MP7.08 – 8.17) Section 3 - Tree Trimming, |
Brushing, Clearing of vegetation. Remove all dead trees capable of reaching the roadway, Stump and brush
| treatment. | 1 | LS | $8,350.00 | $8,350.00 | $ 16000.00 | $16,000.00 | $33,000.00 | $33,000.00 | $ 35000.00 | $35,000.00 | $ 82232.00 | $82,232.00 |
| 6 | Interstate 5 (MP8.17 – 9.64) Section 4 - Tree Trimming, |
Brushing, Clearing of vegetation. Remove all dead trees capable of reaching the roadway, Stump and brush
| treatment. | 1 | LS | $7,675.00 | $7,675.00 | $ 12000.00 | $12,000.00 | $36,329.00 | $36,329.00 | $ 40000.00 | $40,000.00 | $ 41125.00 | $41,125.00 |
| 7 | Interstate 5 (MP4.86 – 5.36) Section 5 - Tree removal in the | |||||||||||
| center median Stump and brush treatment. | 1 | LS | $9,935.00 | $9,935.00 | $ 16,000.00 | $16,000.00 | $16,200.00 | $16,200.00 | $ 42,000.00 | $42,000.00 | $ 26,500.00 | $26,500.00 |
| 8 | Interstate 5 (MP5.44 – 5.55) Section 6 - Tree removal of |
marked trees in the Northbound offramp and onramp
| areas of exit 6. Stump and brush treatment. | 1 | LS | $5,350.00 | $5,350.00 | $ 12000.00 | $12,000.00 | $9,500.00 | $9,500.00 | $ 11500.00 | $11,500.00 | $ 10052.00 | $10,052.00 | ||
| TOTAL | $78,915.00 | TOTAL | $95,000.00 | TOTAL | $189,883.00 | TOTAL | $218,500.00 | TOTAL | $382,052.00 | |||||
| Preliminary results are not an indicator of Award. |