Prelim Letter - WY NPS GRTE 2017(1) .pdf

PDF 168 KB Posted

Attached to
WY NPS 2017(1) MOOSE WILSON ROAD PHASE 1
Solicitation number
69056721R000010
Issued by

View the file

Other files

File Type Posted
Synopsis - Project description.pdf PDF
QA_10-21-21.pdf PDF
grte2017(1)_Prelim_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE OFFERORS

RE: WY NPS GRTE 2017(1)

Moose Wilson Road Phase 1 Solicitation No. 69056721R000010

The attached preliminary plans are being furnished to aid prospective Offerors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After November 1st 2021, access will be weather dependent; review current road conditions at Park Roads - Grand Teton National Park (U.S. National Park Service) (nps.gov) . No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located in Grand Teton National Park Teton County, Wyoming.

• Moose Wilson Road o Overlay (Milepost 4.8 to 6.2) – Work on this segment consists of patching, milling and paving.

o Reconstruction (Milepost 6.2 to 7.1) - Work on this section includes grading, drainage, base, paving, and bridge construction.

o Granite Canyon Trail Head Parking lot (Located near M.P. 6.2) – Work consists of grading, base, paving, curb, gutter, and sidewalks.

o Poker Flats (Located near M.P. 6.2) - Work consists of grading, base, paving, and sidewalks.

o Granite Entrance Station (Located near M.P. 6.9) - work consists of grading, base, paving, multi-use path, utilities and kiosk.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Solicitation documents - Documents will be available during the winter of 2021/2022. Please monitor the SAM site for actual date of solicitation release (https://.sam.gov/). To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.

Thank you for your interest in this project.

8/31/2021 https://www.nps.gov/grte/planyourvisit/roads.htm https://www.nps.gov/grte/planyourvisit/roads.htm mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov

RE: WY NPS GRTE 2017(1)

File details come from the government source that posted it. Updated .