This notice provides details for the MT PRA GLAC 10(44), Lake McDonald Utility Relocation federal contract opportunity. The project involves replacing utilities along Lake McDonald and Going to the Sun Road within Glacier National Park, Montana, including replacing the sewer force main, power, and phone lines. Construction will take place from early summer 2022 to late spring 2023, with limited full road closures allowed at night from June through September 2022. The completed utilities must be operational by early April 2023. Bidders must monitor the BETA SAM website for release of the solicitation documents during winter 2021-2022. Technical questions must be submitted by email to plans-spec@dot.gov by September 7, 2021, with general inquiries directed to wfl.contracts@dot.gov or 360-619-7520. The estimated price range for the project is between $10-15 million.

View the file

Other files

File Type Posted
glac01044_PreAdPlans.pdf PDF
PROJECT DESCRIPTION_Lake McDonald.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE OFFERORS

RE: MT PRA GLAC 10(44) Lake McDonald Utility Relocation Lake McDonald Utility Relocation Solicitation No. 69056721R000012

The attached preliminary plans are being furnished to aid prospective Offerors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After November 1, 2021, access will be weather dependent; contact the Glacier National Park for current road conditions at https://www.nps.gov/glac/planyourvisit/weather.htm. No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located in Glacier National Park, Flathead County, Montana.

Lake McDonald Utility Relocation will replace utilities in the GTSR corridor between the Lake McDonald Lodge and Apgar Village within Glacier National Park, Montana. Specifically, this project includes replacing the existing sewer force main, power, and phone in the corridor along Lake McDonald and Going to The Sun Road (GTSR). Additionally, the lift station near the Lake McDonald Lodge is to be replaced and the lift station at the Sprague Creek Campground is to be modified and improved. The project is intended to be constructed from early summer 2022 to late spring 2023. Due to concessionaire agreements and Park visitation, field construction activities requiring full road closure can’t begin until October 1, 2022, but limited full closures with traffic control sheds are allowed at nights from June through September 2022. The completed sewer, power, and phone lines must be operational by early April 2023. As the area is in a high mountain environment, snow plowing will be a required component of the project and the contractor will be responsible for all plowing activities to maintain construction operations.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Solicitation documents - Documents will be available during the winter of 2021/2022. Please monitor the BETA SAM site for actual date of solicitation release (https://beta.sam.gov/). To

9/7/2021 https://www.nps.gov/glac/planyourvisit/weather.htm mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov

Preliminary Plans letter receive automatic notification through BETA SAM, you must login and select “Follow” feature and follow the steps as indicated.

Thank you for your interest in this project.

RE: MT PRA GLAC 10(44) Lake McDonald Utility Relocation

File details come from the government source that posted it. Updated .