Pre-Solict - Description.pdf
PDF 495 KB Posted
- Solicitation number
- 6982AF23B000030
About this file
This document provides a project description for the construction of two stream crossings along rural roads in North Dakota. The Central Federal Lands Highway Division of the Federal Highway Administration, in cooperation with Billings County and the U.S. Forest Service, is proposing to replace informal low water crossings over Magpie Creek and Whitetail Creek with engineered structures to provide safe and consistent access. The Magpie Crossing will include replacing the existing crossing with a multi-span bridge and approach roadwork, while the Whitetail Crossing will involve removing the current low water crossing and installing a precast reinforced concrete box culvert with approach reconstruction and sight distance improvements. Principal work items include excavation, road base and surfacing aggregates, precast structures, riprap, pilings, concrete, guardrails and other road elements. The anticipated advertisement date for the solicitation is September 2023 with construction planned from November 2023 to October 2024. The estimated bid range is between $2 million and $5 million, to be solicited as a full and open competition under solicitation number 6982AF23B000030.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS NOT AN INVITIATION FOR BID, PLAN AND
SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NUMBER: ND FLAP 704(1) & 795(1)
PROJECT NAME: MAGPIE AND WHITE TAIL CROSSINGS
PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with Billings County and U.S. Forest Service (USFS), are proposing construction of ND FLAP 704(1) and 795(1) Magpie and Whitetail Crossings, to provide safe travel and allow consistent access across Magpie Creek (Magpie Road) and Whitetail Creek (Whitetail Road). The existing routes have informal low water crossings with negligible hardened surfacing which are in poor condition and are impassable during storm events.
SCOPE OF THE WORK:
The scope of this project will include the construction of structures across Magpie Creek and Whitetail Creek to allow the passage of vehicles. Work will also include roadway work for the stream crossing approaches as appropriate.
The Magpie Crossing will include the replacement of the existing low water crossing with a multi-span bridge structure over Magpie Creek. It will also include adjacent roadway reconstruction leading up to the bridge structure including gravel surfacing.
The Whitetail Crossing will include removal and replacement of the existing low water crossing to include an AOP precast reinforced box culvert structure including approach work; and roadway reconstruction including sight distance improvements and gravel surfacing. The crossing location will straighten the roadway through this section leading up to the Whitetail Picnic Area per the project application proposal.
PRINCIPAL WORK ITEMS:
Line Item Unit Estimated Quantity
ROADWAY EXCAVATION CU YD 1630
ROADWAY AGGREGRATE, METHOD 2, SURFACE COURSE TON 740
CONCRETE, HEADWALL (HEADWALLS AND WINGWALLS,
DOUBLE BARREL) EACH 2
12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE
BOX CULVERT LN FT 68
PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE .7
CLEARING AND GRUBBING ACRE 2.5
EMBANKMENT CONSTRUCTION CU YD 10.2
PLACED RIPRAP, METHOD B, CLASS 3 CU YD 600
ROADWAY AGGREGRATE, METHOD 2, SURFACE COURSE TON 1230
STEEL PIPE PILE, IN PLACE (24” DIA x ¾”) LN FT 240
STELL PIPE PILE, IN PLACE (18” DIA x ½”) LN FT 200
DYNAMIC PILE LOAD TEST EACH 4
STRUCTURAL CONCRETE, CLASS A (AE) CU YD 186
REINFORCING STEEL, EPOXY COATED LB 33,000
BRIDGE RAILING, STEEL, TWO RAIL LN FT 250
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LN FT 175
TERMINAL SECTION, TYPE MGS TANGENT EACH 4
STRUCTURAL TRANSITION RAILING LN FT 100
PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 1.20
STRUCTURAL BACKFILL CU YD 30
ANTICIPATED SCHEDULE:
The anticipated advertisement date for the project is September 2023 with construction anticipated from November 2023 to October 2024.
ESTIMATED COST RANGE:
Estimated Bid Range: Between $2,000,000 and $5,000,000
This will be solicited as a full & open competition.