Pre-Solicitation Notice TEMF B2824 and B2850.pdf

PDF 504 KB Posted

Attached to
Fort Polk TEMF Repairs B2824 and B2850
Solicitation number
W9126G20R0592
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z – TEMF REPAIRS B2824 AND B2850 PROJECT, FORT POLK, LA

General Information

Document Type: Pre-Solicitation Notice Number: W9126G-20-R-0592 Posted Date: March 13, 2020 Classification Code: Z – Repair and or Alteration

Contracting Office Address US Army Corps of Engineers, Ft. Worth District, P.O. Box 17300, ATTN: CESWF-CT, Room 2A17, 819 Taylor Street, Ft. Worth, TX 76102-0300

Description

1. CONTRACT INFORMATION: The proposed project will be a small business set-aside two step design build request for proposal. The North American Industrial Classification System code is 236220, which has a size standard of $39,500,000. A firm-fixed-price contract will be awarded. The contract is anticipated to be approximately awarded in September 2019. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at h ttps://www.sam.gov/. No state level certifications will be accepted. This contract is subject to the availability of funds per FAR clause 52.232-18.

2. PROJECT INFORMATION: Construction Range is between $10,000,000 and $25,000,000. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform a complete renovation of Hangar Building 6940 at Fort Polk, Louisiana, as specified within this RFP. All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements. Obtain all operating and construction permits, and permitting actions required by codes and DPW. The Contractor shall be the architect/engineer and constructor of record on this project. The design and construction shall be an integrated approach that achieves the highest quality of operations and aesthetics in meeting the requirements of the building’s users while at the same time is cost effective and establishes economical and efficient synergy among the systems and spaces applicable to the structure as a whole. The Contractor shall be responsible for the professional quality, constructability, technical accuracy, and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, structural, mechanical, electrical, civil, and other architectural and engineering features of the work shall be accomplished, reviewed, and approved by licensed professionals to practice in their respective professional field in a state or possession of the United States. The Contractor shall be responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation shall alleviate the Contractor from performing any additional design as required to produce a complete set of construction documents. Contractor is not authorized to “fast‐ track” this project by allowing construction activities to begin prior to completed and approved design documents. This building will be completely vacated during construction. User will remove and store all furniture, equipment and other items that they intend to keep for future use.

THIS IS NOT A REQUEST FOR PROPOSAL

File details come from the government source that posted it. Updated .