Pre-Solicitation Notice - Shipfitter Standalone 5Aug24-20Dec2024.docx

DOCX document 17 KB Posted

Attached to
Touch Labor Shipfitter support Federal contract opportunity
Solicitation number
N3904024RCPNSY400T3899
Issued by
Department of the Navy Naval Sea Systems Command

About this file

The document provided is a Pre-Solicitation Notice for a federal contract opportunity at the Portsmouth Naval Shipyard (PNS) to provide 15 experienced, skilled, and qualified Marine Shipfitter personnel to support the overhaul, modernization, and repair work on 688 Class and 774 Class Submarines. The period of performance is anticipated to be from August 5, 2024, to December 20, 2024, with an estimated 1,568 man-days required, including 143 overtime man-days. The place of performance will be at PNS in Kittery, Maine. The formal solicitation is expected to be posted on the System for Award Management (SAM.gov) website within 15-30 days from the date of this pre-solicitation notice. The Performance Work Statement (PWS) is currently in draft status and may be subject to revisions or the addition/deletion of work items, as well as changes to the period of performance.

View the file

Other files for this federal contract opportunity

Other files attached to Touch Labor Shipfitter support, newest first.
File Type Posted
Fy 24 SOW - Shipfitter Standalone.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Solicitation Notice

Portsmouth Naval Shipyard (PNS) requires five (15) experienced, skilled and qualified Marine Shipfitter personnel to assist with the execution of 688 Class and 774 Class Submarine overhaul, modernization and repair work.

Period of Performance and Level of Effort (subject to change between this notice and solicitation) – The period of performance is 02 September 2024 to 29 August 2025. The level of effort required is ten (10) personnel. Table 1 represents an estimate of man days needed, straight time (ST) and overtime (OT).

Trade
POP Start
POP End
ST MDs (excluding holidays)
OT MDs
Total MDs
Shipfitters (Shop 11)
08/05/2024
12/20/2024
1425
143
1568

Table 1 The Contractor shall provide fully trained and competent personnel necessary to perform the trade outlined in the Performance Work Statement PWS, Place of Performance will be PNS Kittery Maine.

PLEASE BE ADVISED This Notice is issued in accordance with FAR 5.203(a) and shall not be construed as a commitment by the Government to issue a solicitation or award a contract. A formal solicitation will be posted electronically on System for Award Management (https://www.SAM.gov)

Attached with this Pre-Solicitation Notice is the PWS. PLEASE BE ADVISED the PWS is in draft status and is subject to revision or additional work items may be added or deleted (the period of performance is also subject to change).

Formal Solicitation is anticipated to be posted between 15-30 days from this pre-solicitation notice.