Pre-Solicitation_Notice_2.pdf
PDF 157 KB Posted
- Solicitation number
- 140L0622R0040
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center
Building 50, Denver Federal Center
P.O. Box 2547 https://www.blm.gov
Pre-Solicitation Notice
07/11/2022
Solicitation Number: 140L0622R0040
Project Identification: HVAC System Replacement, BLM Farmington District Office, NM
Point of Contact: Vicki Meier, Contract Specialist, vmeier@blm.gov
Project Location: 6251 College Blvd., Farmington, NM 87402
Magnitude of Construction: Between $1M – $5M
Estimated Period of Performance: 330 calendar days after issuance of the notice to proceed
North American Industry Classification System (NAICS) Code: 238220 / Plumbing, Heating & A/C Contractors
Produce Service Code: N045 – Installation of Plumbing & Heating Equipment
Small Business Size Standard: $16.5M
Solicitation Set-Aside: Total Small Business – Only companies that qualify as a small business under the applicable size standard will be considered.
Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) in late July – approximately July 28.
Proposal Submission Deadline: Exact date unknown at this time / 30-days after the issuance of the RFP.
Registration Requirements: Perspective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile to included completed representations and certifications.
(https://sam.gov/content/home)
Site Visit: Yes – Approximately 1-2 weeks after the issuance of the RFP. Refer to FAR provision 52.236-27 within the subsequent solicitation.
Project Description: The subject requirement consists of all labor, materials, equipment, and supervision to perform the following three phases of construction: 1) Phase 1 – West end of the building; 2) Phase 2 – Middle section of the building; 3) Phase 3 – East end of the building. The Government will occupy portions of the building that will not be under construction during the entire contract period. Construction must not interfere with the Government’s day-to-day operations; utilities may not be interrupted unless expressly permitted by the Contracting Officer.
https://www.blm.gov/ mailto:vmeier@blm.gov https://sam.gov/content/home
File details come from the government source that posted it. Updated .