United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Denver Federal Center, Building 85

P.O. Box 25047 Denver, Colorado 80225-0047 http://www.blm.gov

Pre-Solicitation Notice April 18, 2024

Solicitation Number: 140L0624R0038 Project Identification: Morgan Bridge Riparian Restoration Point of Contact: Vicki Meier, Contracting Officer, vmeier@blm.gov Project Location: Work under this contract is located in Bingham County, approximately 23 miles Southeast of Blackfoot, Idaho near the intersection of the Blackfoot River Road and Lincoln Creek Road. Site entrance coordinates, 111.9269204° W, 43.0600066° N.

Magnitude of Construction: Between $250-500K Estimated Period of Performance: 485 calendar days after issuance of the notice to proceed North American Industry Classification System (NAICS) Code: 237990 / Other Heavy and Civil Engineering Construction Produce Service Code: Y1PA750P – Construction of Recreation Facilities (Non-Building) Small Business Size Standard: $45M Solicitation Set-Aside: Total Small Business – Only companies that qualify as a small business under the applicable size standard will be considered.

Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) in early May 2024.

Proposal Submission Deadline: Exact date unknown at this time / 30-days after the issuance of the RFP.

Registration Requirements: Perspective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile to include completed representations and certifications.

https://sam.gov/content/home Site Visit: Yes – Approximately 1-2 weeks after the issuance of the RFP. Refer to FAR provision 52.236-27 within the subsequent solicitation.

Project Description: The Bureau of Land Management (BLM) has a design-build requirement for all labor, materials, equipment, and supervision to make riparian restorations in the Morgan Bridge project area. The work will occur within the BLM, Idaho Falls District, Pocatello Field Office, in Bingham County, approximately 23 miles Southeast of Blackfoot, Idaho. The work will consist of design and construction of the following:

1. Mobilization,

2. Survey,

3. Design,

4. Riverbank stabilization,

5. Riverbank recontouring,

6. Riparian vegetation plantings, and

7. Culvert replacement.

https://sam.gov/content/home

BUREAU OF LAND MANAGEMENT
National Operations Center
Denver Federal Center, Building 85
P.O. Box 25047
Denver, Colorado 80225-0047
http://www.blm.gov

File details come from the government source that posted it. Updated .