This pre-solicitation document describes a Multiple Award Task Order Contract (MATOC) for Expedited Road & Bridge Construction in California, issued by the Central Federal Lands Highway Division of the Federal Highway Administration. The solicitation will be a small business set-aside, with a tentative advertisement date of August 2025, and anticipates awarding up to eight contracts with a total not-to-exceed value of $250 million over five years. The first task order (seed project) is the Blue Lake Road project in Modoc National Forest, involving roadway rehabilitation, rockfall hazard mitigation, and drainage improvements across approximately 8.1 miles of road.
The project scope includes roadway excavation, rock excavation, full depth reclamation, asphalt concrete paving, traffic control, and related infrastructure work. The estimated cost range for the seed project is $10-20 million, with an anticipated contract award in September 2025 and project completion by August 2026. The contract will use a Lowest Price Technically Acceptable (LPTA) procurement methodology, and each awarded contract will consist of one base year with options to extend for two additional two-year periods. Work will primarily focus on road and bridge construction, including value engineering, bridge demolition, foundation work, and various roadway improvements within the California region.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT
AVAILBLE
THE TENTATIVE ADVERTISEMENT DATE IS AUGUST 2025. THIS PROJECT WILL BE
ADVERTISED AS A SMALL BUSINESS SET-ASIDE.
Project Details: The Central Federal Lands Highway Division (CFL) of the Federal Highway Administration anticipates awarding a Multiple Award Task Order Contract (MATOC) for Expedited Road & Bridge Construction in and near the state of California. The government anticipates that the average construction task order under the MATOC will be below $25 million. The request for proposals or invitation for bids will include all contractual requirements for which the work is being requested. One
(1) Task Order Request for Proposal (RFP) will be issued simultaneously with the MATOC Request for Proposal. The one Task Order (seed project) will consist of: CA FLAP MOD 258(1), Blue Lake Road Task Order. Offerors will be required to submit a price proposal for the first task order (seed project) as well as qualifications for the base MATOC RFP. The proposal for the first task order will be used to evaluate price for the base MATOC lowest price technically acceptable (LPTA) awards. The scope of the task orders may include, but are not limited to bridge/roadway value engineering, fabrication and/or delivery of individual bridge elements or temporary works, bridge demolition, construction of temporary and permanent single and multi-span bridges and foundations, mobilization, contractor sampling and testing, earthwork, dewatering, walls, asphalt and concrete surfacing, drainage improvements, traffic control, installation of traffic signals and signs, roadway reconstruction, rehabilitation, MSE wall construction, asphalt concrete paving, trail construction, roadway excavation, rock embankment or embankment construction and other work incidental to road and bridge construction projects. This is a competitive LPTA procurement and evaluation factors for award will be fully stated in the RFP. The government may award up to a maximum of eight contracts resulting from this solicitation to the responsible offerors whose offers conform to the solicitation while using the LPTA methodology. Each contract awarded will consist of one base year and options to extend the contract for two additional two-year periods. The shared capacity of the MATOC will have a maximum not-to-exceed five year total of $250 million.
Details of the first task order/seed project are found below:
PROJECT NUMBER: CA FLAP MOD 258(1)
PROJECT NAME: BLUE LAKE ROAD
PROJECT DESCRIPTION:
Blue Lake Road (CR 258) provides access to Blue Lake and its associated recreational facilities within the Warner Mountain Ranger District of the Modoc National Forest (MNF). The purpose of the project is to address safety concerns and improve access to recreational opportunities at Blue Lake by rehabilitating two sections of rockfall hazards on CR 64, 6.6 miles of CR 258, and
1.5 miles of Campground Road. The two locations along CR 64 that pose rockfall and slope failure hazards are located 4.6 miles east of the town of Likely, California, and about 3.4 miles farther east. Rehabilitation of CR 258 is from the intersection of CR 64 near the Pit River bridge and extends 6.6 miles to Campground Road, and then another 1.5 miles southwest to the campground loop at Blue Lake. See attached site maps for information about the location of the project work sites.
The project includes roadway rehabilitation (pulverizing and asphalt surfacing), two short segments of reconstruction, rockfall hazard mitigation, and drainage improvements. Roadway improvements will maintain the current width of 20’ and 22’ feet on CR 258 and CR 64 in the rockfall areas and preserve the existing width on Campground Road. Work will stay within the current road prism and maintained roadside ditch, except where guardrail and culverts need replacement. The project also includes minor horizontal alignment and profile adjustments, mitigating rockfall hazards, installing guardrail, roadway subexcavation, replacing culverts, reconditioning ditches, installing erosion control, installing signs, and applying pavement markings.
MISCELLANEOUS:
The project ranges in elevation between 5,400 to 6,100 at the Blue Lake campground loop. A qualified biologist must conduct detailed technical surveys in rugged terrain, strictly following environmental protocols related to migratory and raptor bird nests. Work in rockfall mitigation zones must comply with blasting safety regulations, unplanned rock falls, environmental impacts, geotechnical challenges, and protecting the roadway. Contractors must follow exact engineering specifications and details for guardrail installation and carry out topsoil removal and restoration of all disturbed areas. Construction may not always be favorable during construction duration, generally limiting operations sensitive to snow and seasonal cold temperatures during autumn, winter, and spring months. Both CR 64 and CR 258 may be closed to public traffic with specified considerations.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
20401-0000 Roadway Excavation: 3,350 CUYD 20421-0000 Rock Excavation: 530 CUYD 20701-0300 Separation-Stabilization Geotextile, Class 1, Type C: 1,500 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,300 TON 30502-0600 Full Depth Reclamation with Cement, 6-Inch Depth: 98,200 SQYD 30510-0000 Cementitious Material: 1,240 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix: 17,850 TON 41101-1000 Prime Coat, Method 1: 120 TON 63506-0500 Temporary Traffic Control, Flagger: 5,100 HOUR 63506-0600 Temporary Traffic Control, Pilot Car: 2,100 HOUR
ANTICIPATED SCHEDULE:
Advertisement – August 2025 Award – September 2025
NTP – October 2025 Seed Project Completion – August 2026
ESTIMATES COST RANGE:
The estimated price range is between $10,000,000 to 20,000,000.
P6
APPROX. 20FT HT
P7
P8
P13
IN
C
MP
P14
DI
R
ON
LY
18I N C
MP
P19
P21
BRRB
RB
RB
RB
RB
BO
TT
OM
O
F I B
EA
M
RB
RB
RB
RB
RB
RB
CPS
RF3997
M
ODOC NF
CPS
RF3998
P1
RPT 5
CPS
RF3999
CPS
RB
RB
RB
RB
RB
RB
RB
CPS SET
RF4101
RBRB
P2
RB
RB
RESC3
RESC2
.9
IN
C M
P
4004CPS
5040.5
18 IN CMP
CPS SET
RF4100
.5
RESC1
5042.3
DO NOT LITTER
5044.6
5044.8
5045.6
.9
5046.4
18 IN CMP
5046.5
.3
5046.918 IN CMP
RF4001
HOLE PUNCH
WOOD
WOOD
18IN CMP
5047.7
.718
IN
C M
P
WOOD
WOOD
GRAVEL
OVE
R 2
5FT
HT
5049.9
18 I N C
MP
GRAVEL
IN
CMP
.4
GRAVEL
P3
P4
5052.2
5053.4
IN
CMP
P5
5054.4
5055.8
5057.1
5057.124IN CMP
5057.518IN CMP
5057.8
IN
CMP
5059.018IN
CMP FILL
ED
5060.4
WIR
E 24
FT U
P
5060.7
5061.018IN CMP
IN
CMP
5061.6
5061.7
5061.818IN CMP
P9
5062.5
5063.4
5063.724 IN CMP
30IN CMP
5063.9
5065.8
CMP 18
IN
5066.7
5067.318 IN CMP
P10
5071.6
5075.2
18I N C
MP
5086.1
CMP 1
8 IN
5087.9
P11
5102.3
5106.6
18IN
CMP
5116.8
5118.4CMP 18 IN
DIR ONLY
DIR ONLY
DIR ONLY
BA
RB
ED
W
IR
E
BARBED W
IRE
5134.2CMP 18 IN
DIR ONLY
P12
5141.5
CMP 18
IN
DIR
ONLY
CMP 2
4 IN
5170.7
NEXT 3 MILES
5188.7
5191.9
36 I
N CMP
BW
BW
DI
R O
NLY
.3
IN
CMP
IN
D
IA
D I
.1
5239.9
18I N C
MP
IN
DIA
DI
5243.6
CAUTIO
N W
INTER M
AIN
ENDS H
ERE
DIR
ONLY
DI
R
ON
LY
.4
IN
D
IA
D I
.0
5279.9
18IN CMP
5291.4
18IN CMP FULL5323.3
5328.818IN CMP
48IN DIA DI5331.6
DIR ONLY
5363.5
18IN CMP
18IN CMP
5366.25367.1
18I N C
MP5376.8
DIR
ONLY
48I N D
IA D
I
5380.5
DIR
ONLY
5428.7
18I N C
MP
.4
.5
IN
CMP
P15
DI
R
ONLY
.5
IN
C
MP
.1
IN
CMP
DIR
ONLY
DI
R
ONL
Y
.6
IN
C
MP
.3
IN
C
MP
P16
DI
R
ONL
Y
.4
CMP
IN
.2
.4
IN
C
M P
IN
D
IA
D
I
.2
5670.1
5672.9
IN
CMP
DIR
ONLY
IN
DIA
DI
5676.0
P17
5695.4
18IN
CMP48IN
DIA
DI
5698.8
.6
.3
IN
CMP
IN
C M
P
.9
DI
R
ON
LY
.8
IN
D
IA
DIR ONLY
18 IN CM
P
5773.5
N0
.7
IN
C M
P
DI
R
ON
LY
P18
IN
C M
P
.3
DI
R
ON
LY
DI
R
ONLY
.1
IN
C
MP
IN
D
IA
D I
.2
5897.9
5907.0
48I N D
IA
DI
5910.0
DI
R O
NLY
.8
.0
IN
C
MP
.9
IN
D
IA
D I
TPOST FENCE ANCHOR
SS9001
SS9002
.8
BW
60D NAIL
6021.3
6022.3
18IN CMP
48IN DIA DI
6025.1
P20
STEEL
WOOD
BW
60D NAIL
STEEL
39N34
S CURVES NEXT 3 MI
LES
STEEL
S4402RESECT
CONCRETE
.7
NO DIVING
6070.9
6071.0
6IN CMP
60D NAIL SET
60D NAIL SET
BLUE LAKE TRAIL
TR LIMIT
TR LIMIT
.2
.5
CM
P
IN
BOATS 15 MPH
WARNER MOUNTAIN RANGER DISTRICT
BARRIER
WOODEN
(2x) 6IN CMP
6073.9
6074.0
BARRIE
R
W OODEN
WOODEN BARRIER
.5
IN
C
MP
NO S
HOOTIN
G
W OODEN BARRIER
CMP 36 IN
6076.0
NO PARKING
RES
TROOMS
6077.1
CMP 18 IN
6077.2
BLUE LAKE
SP
EE
D
LI
MI
T
6080.2
ONE W AY
BASIN&RANGE
WOOD LOOKOUT DECK
SET
NAIL
MAG
.4
ROCK MASONRY
MODOC NATIONAL FOREST
CMP 1
8 I
N
.8
DO NOT ENTER
STONE H
EADW ALLS
6089.0
18IN
CMP OUTLET FIL
LED
60D NAIL SET
IN
C
MP
.0
.6
6091.618IN CMP
6092.5
12IN CPP
6092.6
MAG NAIL
60D NAIL SET
60D NAIL SET
6094.9
S4401
NAIL
60D NAIL SET
WOOD
60D NAIL
60D NAIL SET
WOOD
60D NAIL SET WOOD
60D NAIL SET
60D NAIL SET
NO OVER NIGHT CAM
PING
6120.0
60D NAIL
6122.8
18 I N C
MP
6125.2
6125.4
IN C
MP
BL
UE
L
AK
E
RD
D
AY
U
SE
A
RE
A
6128.536
IN D
IA D
I
.7
.1
IN
C
MP
60D NAIL SET
DIR
ONLY
6147.5
18IN
CMP
P26
36IN
DIA
DI
6150.6
MODOC NATIONAL FOREST
60D NAIL SET
BARBED WIR
E
BARBED WI
RE
15 MPH
CMP 1
8 IN
6165.5
6166.8
6167.8
18I N C
MP
DIR
ONLY
.4
36I N D
IA D
I
6170.9
6179.8
.1
IN
C
MP
.5
6183.948IN CMP
CM
P
IN
.6
.2
6185.6
6187.0
IN
D
IA
D I
.9
6190.2
18IN CMP
IN
D
IA
D
I
.9
IN
C
M P
60D
P23
P22
NF 64
.9
60D
NE
XT
M
IL
ES
LO
G
TR
UC
KS
60D
STOP AHEAD
TR
EE
P
LA
NT
AT
IO
N
WELCOME BLUE LAKE
6211.3
60D
18IN CMP6212.4
60D
.5
IN
C M
P
.2
6228.3
ON
E
LA
NE
R
OA
D
CMP 18 IN
6230.2
38N60
TREE PLANTATION
P.24
P25
BW
60D
BW
STATE PROJECT
A
M N C
A m o d
R o a d w a y C
A D
D S h e e ts A G e n s h t\
C A s it e .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S e b a s ti a n .g u z m a n
NUMBER
SHEET
CA
BLUE LAKE ROAD
CA FLAP MOD 258(1)
Schedule A
Rockfall Mitigation
CR 64 Site 2
Station 6+50 - 8+50
MODOC
COUNTY
MODOC
COUNTY
MODOC
COUNTY
MODOC
NATIONAL
FOREST
Tule Mountain
W e s t V a lle y R e s e rv o ir urneyFlo Kauffman
Likely
+00
0+00
0+00
Campground
Blue Lake
70 Miles
To Susanville
18 Miles
To Alturas
MODOC
COUNTY
SCHEDULE A
SITE MAP
NO SCALE
Schedule A
Blue Lake Road
Station 14+90.00
CA FLAP MOD 258(1)
Begin Project
Potential Staging Area
Sta. 17+00, Lt.
Potential Staging Area
Sta. 322+00, Rt.
Lake
Blue
Schedule A Blue Lake Road Station 358+59 End Project CA FLAP MOD 258(1)
A4
Potential Staging Area
Sta. 201+90, Lt.
Modoc County
Lassen County
Schedule A
Rockfall Mitigation
Reconstruction
CR 64 Site 1
Station 2+50 - 6+00
SS9001
SS9002
S4402
RESECT
CONCRETE
.7
NO DIVING
60D NAIL SET
BLUE LAKE TRAIL
TR LIMIT
TR LIMIT
.2
.5
C M
P
I
N
BOATS 15 MPH
BARRIER
W O
O D
EN
B A R R
IE
R
W O
O D
EN
WOODEN BARRIER
.5
IN
C
M P
N O S
H O
O
TI
N G
W O
O D E N B
A R R
IE
R
C M
P
IN
.0
NO PARKING
R E S T R O
O M S
.1
C M P
IN
.2
BLUE LAKE
S P E E
D L
IM
IT
.2
O N E W
A Y
BASIN&RANGE
WOOD LOOKOUT DECK
SET
NAIL
MAG
P. C.
.4
R O
C K M
A S
O N
R Y
M O
D O
C N
A T
IO
N A L F
O R E S T
DO NOT ENTER
S T O
N E H
E A D
W A
LL
S
.0
IN
CMP O
UTL
ET F
ILL
ED
60D NAIL SET
IN
C
M P
.0
.618
IN
CMP
.5
IN
C
P P
.6
MAG NAIL
60D NAIL SET
60D NAIL SET
P. C.
6094.9
S4401
NAIL
60D NAIL SET
WOOD
60D NAIL
60D NAIL SET
WOOD
60D NAIL SET WOOD
60D NAIL SET
60D NAIL SET
N O O
V E
R N
I G
H T C
A M
P I N
G
60D NAIL
.8
IN
C
MP
.2
B L
U E L
A K
E R
D D
A Y U
S E A
R E
A
.7
.1
I
N C
M P
P26
MODOC
NATI
ONAL F
ORES
T
BARBED W
IRE
BARBED
WI
RE
M
PH
CM
P I
N
.5
.8
.4
.8
.5
.9
48IN
CMP
C M
P
I
N
.6
.6
DI
.9
6.
.2
IN
C
M P
I N D
I A D
I
.9
I N C
M P
60D
P23
P22
N F
DI
.9
60D
N E
X T
M
I L E S
L O
G T
R U
C K
S
60D
S T
O P A
H E
A D
STOP
T R E E P
L A
N T
A T
IO
N
W
ELCOM
E BLUE LAKE
6211.3
60D
18IN CMP6212.4
60D
.5
I
N C
M P
.2
8.3
O N
E L
A N
E R
O A
D
CMP 18
IN
0.2
38N60
T R
E E P
L A
N T
A T
IO
N
P.24
P25
B W
60D
B W
STATE PROJECT
A
M N C
A m o d
R o a d w a y C
A D
D S h e e ts A G e n s h t\
C A s it e .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S e b a s ti a n .g u z m a n
NUMBER
SHEET
CA
BLUE LAKE ROAD
CA FLAP MOD 258(1)
Option X
Campground Road
Station 20+00
Begin Project CA FLAP MOD 258(1)
Campground
Blue Lake
Blue Lake the lake (NO WORK) around the perimeter of
Existing Blue Lake Trail
OPTION X
SITE MAP
A5
Option X
Campground Road
Station 102+92
End Project CA FLAP MOD 258(1)
(No Work)
Boat Launch Road
(No Work)
Camground Recreational Trail
(No Work)
Campground Loop Road
NO SCALE
20+00
75+00
0+
MODOC
NATIONAL
FOREST