PRE-SOLICITATION Expedited California Road and Bridge Construction MATOC with Seed Project.pdf

PDF 2 MB Posted

Attached to
Expedited California Road & Bridge Construction
Solicitation number
6982AF25R000003
Issued by

About this file

This pre-solicitation document describes a Multiple Award Task Order Contract (MATOC) for Expedited Road & Bridge Construction in California, issued by the Central Federal Lands Highway Division of the Federal Highway Administration. The solicitation will be a small business set-aside, with a tentative advertisement date of August 2025, and anticipates awarding up to eight contracts with a total not-to-exceed value of $250 million over five years. The first task order (seed project) is the Blue Lake Road project in Modoc National Forest, involving roadway rehabilitation, rockfall hazard mitigation, and drainage improvements across approximately 8.1 miles of road.

The project scope includes roadway excavation, rock excavation, full depth reclamation, asphalt concrete paving, traffic control, and related infrastructure work. The estimated cost range for the seed project is $10-20 million, with an anticipated contract award in September 2025 and project completion by August 2026. The contract will use a Lowest Price Technically Acceptable (LPTA) procurement methodology, and each awarded contract will consist of one base year with options to extend for two additional two-year periods. Work will primarily focus on road and bridge construction, including value engineering, bridge demolition, foundation work, and various roadway improvements within the California region.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT

AVAILBLE

THE TENTATIVE ADVERTISEMENT DATE IS AUGUST 2025. THIS PROJECT WILL BE

ADVERTISED AS A SMALL BUSINESS SET-ASIDE.

Project Details: The Central Federal Lands Highway Division (CFL) of the Federal Highway Administration anticipates awarding a Multiple Award Task Order Contract (MATOC) for Expedited Road & Bridge Construction in and near the state of California. The government anticipates that the average construction task order under the MATOC will be below $25 million. The request for proposals or invitation for bids will include all contractual requirements for which the work is being requested. One

(1) Task Order Request for Proposal (RFP) will be issued simultaneously with the MATOC Request for Proposal. The one Task Order (seed project) will consist of: CA FLAP MOD 258(1), Blue Lake Road Task Order. Offerors will be required to submit a price proposal for the first task order (seed project) as well as qualifications for the base MATOC RFP. The proposal for the first task order will be used to evaluate price for the base MATOC lowest price technically acceptable (LPTA) awards. The scope of the task orders may include, but are not limited to bridge/roadway value engineering, fabrication and/or delivery of individual bridge elements or temporary works, bridge demolition, construction of temporary and permanent single and multi-span bridges and foundations, mobilization, contractor sampling and testing, earthwork, dewatering, walls, asphalt and concrete surfacing, drainage improvements, traffic control, installation of traffic signals and signs, roadway reconstruction, rehabilitation, MSE wall construction, asphalt concrete paving, trail construction, roadway excavation, rock embankment or embankment construction and other work incidental to road and bridge construction projects. This is a competitive LPTA procurement and evaluation factors for award will be fully stated in the RFP. The government may award up to a maximum of eight contracts resulting from this solicitation to the responsible offerors whose offers conform to the solicitation while using the LPTA methodology. Each contract awarded will consist of one base year and options to extend the contract for two additional two-year periods. The shared capacity of the MATOC will have a maximum not-to-exceed five year total of $250 million.

Details of the first task order/seed project are found below:

PROJECT NUMBER: CA FLAP MOD 258(1)

PROJECT NAME: BLUE LAKE ROAD

PROJECT DESCRIPTION:

Blue Lake Road (CR 258) provides access to Blue Lake and its associated recreational facilities within the Warner Mountain Ranger District of the Modoc National Forest (MNF). The purpose of the project is to address safety concerns and improve access to recreational opportunities at Blue Lake by rehabilitating two sections of rockfall hazards on CR 64, 6.6 miles of CR 258, and

1.5 miles of Campground Road. The two locations along CR 64 that pose rockfall and slope failure hazards are located 4.6 miles east of the town of Likely, California, and about 3.4 miles farther east. Rehabilitation of CR 258 is from the intersection of CR 64 near the Pit River bridge and extends 6.6 miles to Campground Road, and then another 1.5 miles southwest to the campground loop at Blue Lake. See attached site maps for information about the location of the project work sites.

The project includes roadway rehabilitation (pulverizing and asphalt surfacing), two short segments of reconstruction, rockfall hazard mitigation, and drainage improvements. Roadway improvements will maintain the current width of 20’ and 22’ feet on CR 258 and CR 64 in the rockfall areas and preserve the existing width on Campground Road. Work will stay within the current road prism and maintained roadside ditch, except where guardrail and culverts need replacement. The project also includes minor horizontal alignment and profile adjustments, mitigating rockfall hazards, installing guardrail, roadway subexcavation, replacing culverts, reconditioning ditches, installing erosion control, installing signs, and applying pavement markings.

MISCELLANEOUS:

The project ranges in elevation between 5,400 to 6,100 at the Blue Lake campground loop. A qualified biologist must conduct detailed technical surveys in rugged terrain, strictly following environmental protocols related to migratory and raptor bird nests. Work in rockfall mitigation zones must comply with blasting safety regulations, unplanned rock falls, environmental impacts, geotechnical challenges, and protecting the roadway. Contractors must follow exact engineering specifications and details for guardrail installation and carry out topsoil removal and restoration of all disturbed areas. Construction may not always be favorable during construction duration, generally limiting operations sensitive to snow and seasonal cold temperatures during autumn, winter, and spring months. Both CR 64 and CR 258 may be closed to public traffic with specified considerations.

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

20401-0000 Roadway Excavation: 3,350 CUYD 20421-0000 Rock Excavation: 530 CUYD 20701-0300 Separation-Stabilization Geotextile, Class 1, Type C: 1,500 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,300 TON 30502-0600 Full Depth Reclamation with Cement, 6-Inch Depth: 98,200 SQYD 30510-0000 Cementitious Material: 1,240 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix: 17,850 TON 41101-1000 Prime Coat, Method 1: 120 TON 63506-0500 Temporary Traffic Control, Flagger: 5,100 HOUR 63506-0600 Temporary Traffic Control, Pilot Car: 2,100 HOUR

ANTICIPATED SCHEDULE:

Advertisement – August 2025 Award – September 2025

NTP – October 2025 Seed Project Completion – August 2026

ESTIMATES COST RANGE:

The estimated price range is between $10,000,000 to 20,000,000.

P6

APPROX. 20FT HT

P7

P8

P13

IN

C

MP

P14

DI

R

ON

LY

18I N C

MP

P19

P21

BRRB

RB

RB

RB

RB

BO

TT

OM

O

F I B

EA

M

RB

RB

RB

RB

RB

RB

CPS

RF3997

M

ODOC NF

CPS

RF3998

P1

RPT 5

CPS

RF3999

CPS

RB

RB

RB

RB

RB

RB

RB

CPS SET

RF4101

RBRB

P2

RB

RB

RESC3

RESC2

.9

IN

C M

P

4004CPS

5040.5

18 IN CMP

CPS SET

RF4100

.5

RESC1

5042.3

DO NOT LITTER

5044.6

5044.8

5045.6

.9

5046.4

18 IN CMP

5046.5

.3

5046.918 IN CMP

RF4001

HOLE PUNCH

WOOD

WOOD

18IN CMP

5047.7

.718

IN

C M

P

WOOD

WOOD

GRAVEL

OVE

R 2

5FT

HT

5049.9

18 I N C

MP

GRAVEL

IN

CMP

.4

GRAVEL

P3

P4

5052.2

5053.4

IN

CMP

P5

5054.4

5055.8

5057.1

5057.124IN CMP

5057.518IN CMP

5057.8

IN

CMP

5059.018IN

CMP FILL

ED

5060.4

WIR

E 24

FT U

P

5060.7

5061.018IN CMP

IN

CMP

5061.6

5061.7

5061.818IN CMP

P9

5062.5

5063.4

5063.724 IN CMP

30IN CMP

5063.9

5065.8

CMP 18

IN

5066.7

5067.318 IN CMP

P10

5071.6

5075.2

18I N C

MP

5086.1

CMP 1

8 IN

5087.9

P11

5102.3

5106.6

18IN

CMP

5116.8

5118.4CMP 18 IN

DIR ONLY

DIR ONLY

DIR ONLY

BA

RB

ED

W

IR

E

BARBED W

IRE

5134.2CMP 18 IN

DIR ONLY

P12

5141.5

CMP 18

IN

DIR

ONLY

CMP 2

4 IN

5170.7

NEXT 3 MILES

5188.7

5191.9

36 I

N CMP

BW

BW

DI

R O

NLY

.3

IN

CMP

IN

D

IA

D I

.1

5239.9

18I N C

MP

IN

DIA

DI

5243.6

CAUTIO

N W

INTER M

AIN

ENDS H

ERE

DIR

ONLY

DI

R

ON

LY

.4

IN

D

IA

D I

.0

5279.9

18IN CMP

5291.4

18IN CMP FULL5323.3

5328.818IN CMP

48IN DIA DI5331.6

DIR ONLY

5363.5

18IN CMP

18IN CMP

5366.25367.1

18I N C

MP5376.8

DIR

ONLY

48I N D

IA D

I

5380.5

DIR

ONLY

5428.7

18I N C

MP

.4

.5

IN

CMP

P15

DI

R

ONLY

.5

IN

C

MP

.1

IN

CMP

DIR

ONLY

DI

R

ONL

Y

.6

IN

C

MP

.3

IN

C

MP

P16

DI

R

ONL

Y

.4

CMP

IN

.2

.4

IN

C

M P

IN

D

IA

D

I

.2

5670.1

5672.9

IN

CMP

DIR

ONLY

IN

DIA

DI

5676.0

P17

5695.4

18IN

CMP48IN

DIA

DI

5698.8

.6

.3

IN

CMP

IN

C M

P

.9

DI

R

ON

LY

.8

IN

D

IA

DIR ONLY

18 IN CM

P

5773.5

N0

.7

IN

C M

P

DI

R

ON

LY

P18

IN

C M

P

.3

DI

R

ON

LY

DI

R

ONLY

.1

IN

C

MP

IN

D

IA

D I

.2

5897.9

5907.0

48I N D

IA

DI

5910.0

DI

R O

NLY

.8

.0

IN

C

MP

.9

IN

D

IA

D I

TPOST FENCE ANCHOR

SS9001

SS9002

.8

BW

60D NAIL

6021.3

6022.3

18IN CMP

48IN DIA DI

6025.1

P20

STEEL

WOOD

BW

60D NAIL

STEEL

39N34

S CURVES NEXT 3 MI

LES

STEEL

S4402RESECT

CONCRETE

.7

NO DIVING

6070.9

6071.0

6IN CMP

60D NAIL SET

60D NAIL SET

BLUE LAKE TRAIL

TR LIMIT

TR LIMIT

.2

.5

CM

P

IN

BOATS 15 MPH

WARNER MOUNTAIN RANGER DISTRICT

BARRIER

WOODEN

(2x) 6IN CMP

6073.9

6074.0

BARRIE

R

W OODEN

WOODEN BARRIER

.5

IN

C

MP

NO S

HOOTIN

G

W OODEN BARRIER

CMP 36 IN

6076.0

NO PARKING

RES

TROOMS

6077.1

CMP 18 IN

6077.2

BLUE LAKE

SP

EE

D

LI

MI

T

6080.2

ONE W AY

BASIN&RANGE

WOOD LOOKOUT DECK

SET

NAIL

MAG

.4

ROCK MASONRY

MODOC NATIONAL FOREST

CMP 1

8 I

N

.8

DO NOT ENTER

STONE H

EADW ALLS

6089.0

18IN

CMP OUTLET FIL

LED

60D NAIL SET

IN

C

MP

.0

.6

6091.618IN CMP

6092.5

12IN CPP

6092.6

MAG NAIL

60D NAIL SET

60D NAIL SET

6094.9

S4401

NAIL

60D NAIL SET

WOOD

60D NAIL

60D NAIL SET

WOOD

60D NAIL SET WOOD

60D NAIL SET

60D NAIL SET

NO OVER NIGHT CAM

PING

6120.0

60D NAIL

6122.8

18 I N C

MP

6125.2

6125.4

IN C

MP

BL

UE

L

AK

E

RD

D

AY

U

SE

A

RE

A

6128.536

IN D

IA D

I

.7

.1

IN

C

MP

60D NAIL SET

DIR

ONLY

6147.5

18IN

CMP

P26

36IN

DIA

DI

6150.6

MODOC NATIONAL FOREST

60D NAIL SET

BARBED WIR

E

BARBED WI

RE

15 MPH

CMP 1

8 IN

6165.5

6166.8

6167.8

18I N C

MP

DIR

ONLY

.4

36I N D

IA D

I

6170.9

6179.8

.1

IN

C

MP

.5

6183.948IN CMP

CM

P

IN

.6

.2

6185.6

6187.0

IN

D

IA

D I

.9

6190.2

18IN CMP

IN

D

IA

D

I

.9

IN

C

M P

60D

P23

P22

NF 64

.9

60D

NE

XT

M

IL

ES

LO

G

TR

UC

KS

60D

STOP AHEAD

TR

EE

P

LA

NT

AT

IO

N

WELCOME BLUE LAKE

6211.3

60D

18IN CMP6212.4

60D

.5

IN

C M

P

.2

6228.3

ON

E

LA

NE

R

OA

D

CMP 18 IN

6230.2

38N60

TREE PLANTATION

P.24

P25

BW

60D

BW

STATE PROJECT

A

M N C

A m o d

R o a d w a y C

A D

D S h e e ts A G e n s h t\

C A s it e .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r S e b a s ti a n .g u z m a n

NUMBER

SHEET

CA

BLUE LAKE ROAD

CA FLAP MOD 258(1)

Schedule A

Rockfall Mitigation

CR 64 Site 2

Station 6+50 - 8+50

MODOC

COUNTY

MODOC

COUNTY

MODOC

COUNTY

MODOC

NATIONAL

FOREST

Tule Mountain

W e s t V a lle y R e s e rv o ir urneyFlo Kauffman

Likely

+00

0+00

0+00

Campground

Blue Lake

70 Miles

To Susanville

18 Miles

To Alturas

MODOC

COUNTY

SCHEDULE A

SITE MAP

NO SCALE

Schedule A

Blue Lake Road

Station 14+90.00

CA FLAP MOD 258(1)

Begin Project

Potential Staging Area

Sta. 17+00, Lt.

Potential Staging Area

Sta. 322+00, Rt.

Lake

Blue

Schedule A Blue Lake Road Station 358+59 End Project CA FLAP MOD 258(1)

A4

Potential Staging Area

Sta. 201+90, Lt.

Modoc County

Lassen County

Schedule A

Rockfall Mitigation

Reconstruction

CR 64 Site 1

Station 2+50 - 6+00

SS9001

SS9002

S4402

RESECT

CONCRETE

.7

NO DIVING

60D NAIL SET

BLUE LAKE TRAIL

TR LIMIT

TR LIMIT

.2

.5

C M

P

I

N

BOATS 15 MPH

BARRIER

W O

O D

EN

B A R R

IE

R

W O

O D

EN

WOODEN BARRIER

.5

IN

C

M P

N O S

H O

O

TI

N G

W O

O D E N B

A R R

IE

R

C M

P

IN

.0

NO PARKING

R E S T R O

O M S

.1

C M P

IN

.2

BLUE LAKE

S P E E

D L

IM

IT

.2

O N E W

A Y

BASIN&RANGE

WOOD LOOKOUT DECK

SET

NAIL

MAG

P. C.

.4

R O

C K M

A S

O N

R Y

M O

D O

C N

A T

IO

N A L F

O R E S T

DO NOT ENTER

S T O

N E H

E A D

W A

LL

S

.0

IN

CMP O

UTL

ET F

ILL

ED

60D NAIL SET

IN

C

M P

.0

.618

IN

CMP

.5

IN

C

P P

.6

MAG NAIL

60D NAIL SET

60D NAIL SET

P. C.

6094.9

S4401

NAIL

60D NAIL SET

WOOD

60D NAIL

60D NAIL SET

WOOD

60D NAIL SET WOOD

60D NAIL SET

60D NAIL SET

N O O

V E

R N

I G

H T C

A M

P I N

G

60D NAIL

.8

IN

C

MP

.2

B L

U E L

A K

E R

D D

A Y U

S E A

R E

A

.7

.1

I

N C

M P

P26

MODOC

NATI

ONAL F

ORES

T

BARBED W

IRE

BARBED

WI

RE

M

PH

CM

P I

N

.5

.8

.4

.8

.5

.9

48IN

CMP

C M

P

I

N

.6

.6

DI

.9

6.

.2

IN

C

M P

I N D

I A D

I

.9

I N C

M P

60D

P23

P22

N F

DI

.9

60D

N E

X T

M

I L E S

L O

G T

R U

C K

S

60D

S T

O P A

H E

A D

STOP

T R E E P

L A

N T

A T

IO

N

W

ELCOM

E BLUE LAKE

6211.3

60D

18IN CMP6212.4

60D

.5

I

N C

M P

.2

8.3

O N

E L

A N

E R

O A

D

CMP 18

IN

0.2

38N60

T R

E E P

L A

N T

A T

IO

N

P.24

P25

B W

60D

B W

STATE PROJECT

A

M N C

A m o d

R o a d w a y C

A D

D S h e e ts A G e n s h t\

C A s it e .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r S e b a s ti a n .g u z m a n

NUMBER

SHEET

CA

BLUE LAKE ROAD

CA FLAP MOD 258(1)

Option X

Campground Road

Station 20+00

Begin Project CA FLAP MOD 258(1)

Campground

Blue Lake

Blue Lake the lake (NO WORK) around the perimeter of

Existing Blue Lake Trail

OPTION X

SITE MAP

A5

Option X

Campground Road

Station 102+92

End Project CA FLAP MOD 258(1)

(No Work)

Boat Launch Road

(No Work)

Camground Recreational Trail

(No Work)

Campground Loop Road

NO SCALE

20+00

75+00

0+

MODOC

NATIONAL

FOREST

File details come from the government source that posted it. Updated .