Pre_Sol_Notice_L0625B0005_Little_Robber_DDR_2.pdf
PDF 161 KB Posted
- Attached to
- LITTLE ROBBER DETENTION DAM RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L0625B0005
About this file
This pre-solicitation notice describes a Bureau of Land Management (BLM) construction project for the Little Robber Detention Dam Reconstruction located in Carbon County, Wyoming. The project involves comprehensive dam repair and reconstruction, including dewatering the reservoir, excavating existing dam embankments, removing and reconstructing outlet works, installing a new toe drain system, and reclaiming disturbed areas. The contract will be a total small business set-aside competitive solicitation with a Firm Fixed Price (FFP) award, anticipated for May 2025, with a 395-calendar-day performance period.
Key technical requirements include excavating and reconstructing dam embankments, constructing new outlet works and drainage systems, salvaging and replacing riprap, and restoring the site. The project falls under NAICS code 237990 for "Other Heavy and Civil Engineering Construction" and will require compliance with the Davis Bacon Act and Buy American Act. Potential offerors must be registered on Sam.gov, and a site visit will be included in the full solicitation to help contractors understand the project requirements and site conditions.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center Denver Federal Center, Building 85
P.O. Box 25047 Denver, Colorado 80225-0047 www.blm.gov
LITTLE ROBBER DETENTION DAM RECONSTRUCTION
140L0625B0005 | Pre-Solicitation Notice
The Bureau of Land Management (BLM) has a construction requirement for repairing the Little Robber Dam, located in Carbon County, approximately 11 miles north of Baggs, WY. Major items include:
A. Unwater the reservoir and dewater the construction area. B. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works structures and construct the new outlet works. C. Excavate the downstream slope of the dam embankment to remove vegetation, and the existing toe drain system. D. Excavate the upstream slope of the dam embankment to remove vegetation and salvage the existing riprap. E. Reconstruct the dam embankment. F. Construct a toe drain system consisting of drainpipes, precast concrete manholes, flow measurement flumes, and imported sand and gravel. G. Construct new outlet works. H. Excavation, grading, and salvaging existing riprap in the spillway; placement of salvaged and imported riprap in the spillway channel. I.
Place imported road gravel surfacing along the crest of the dam. J. Reclaim (preparation of soil and seeding) all disturbed areas, including construction staging areas and temporary roads.
The work covered by this contract includes furnishing all labor, material, equipment, and incidentals necessary to complete this requirement per the accompanying specifications and drawings.
The period of performance for this requirement is 395 calendar days after notice to proceed.
The BLM expects to issue a Total Small Business Set-Aside competitive solicitation in May 2025; and anticipates issuing a single Firm Fixed Price (FFP) award from this solicitation. Davis Bacon Act (DBA) is applicable, and the appropriate DBA Wage Determination(s) will be included in the solicitation. The NAICS code for this acquisition is 237990, “Other Heavy and Civil Engineering Construction.” All materials must be in accordance with the Buy American Act.
A Request for Proposal (RFP) solicitation package will be available electronically via the government official website Sam.gov. Potential offerors are responsible for monitoring the website for all communication regarding this requirement, including downloading the complete solicitation package and all solicitation amendments. The government will not provide paper copies or email the solicitation. To be eligible for contract award, offerors must be registered and complete the online Representations and Certifications at Sam.gov.
A site visit date, time and meeting location will be provided in the solicitation. Offerors are highly encouraged to attend the scheduled site visit to inspect the site and to ensure they fully understand the requirement and conditions that may affect the cost, specifications, and performance of the project.
Award will be based on best value to the government in accordance with the Federal Acquisition Regulations (FAR). This notice does not obligate the government to award a contract, nor does it obligate the government to pay for any proposal preparation costs.