Professional Engineering Services for Buckman Direct Diversion Facility
Solicitation number
FY26-TRFQP - A&E-094
Issued by
Santa Fe County, New Mexico

About this file

This file is a pre-proposal meeting recording for professional engineering services requested by the City of Santa Fe on behalf of the Buckman Direct Diversion Board in New Mexico. The project involves redesign and reconstruction of the Buckman Direct Diversion Facility's intake and raw water pumping infrastructure located approximately 15 miles northwest of Santa Fe on the Rio Grande River. The selected engineering firm will advance three existing concept-level intake configurations to 15% design level, conduct alternatives evaluation, and develop the selected alternative to 30% design level. Key deliverables include hydraulic and sediment loading evaluation, intake structure layout refinement, permit identification and assessment, turbidity and sediment removal performance targets, aquatic species exclusion evaluation, operation and maintenance assessment, construction phasing approach, multi-criteria decision analysis, 30% design drawings with basis of design documentation, opinion of probable construction costs, and a project management plan. The mandatory pre-proposal meeting was held on May 18, 2026, at 10:00 AM via Microsoft Teams, with a mandatory site visit on May 19, 2026, at 10:00 AM at 341 Caja Del Rio Road. Written questions were due by May 22, 2026, with proposal submissions due June 12, 2026, at 3:00 PM. The contract is a single-award with an anticipated nine-month duration for the 30% design phase, with evaluation commencing June 15, 2026, oral presentations on June 23, 2026, finalist selection by June 30, 2026, contract finalization by July 9, 2026, and final award anticipated by July 31, 2026.

The RFQ evaluation will be conducted on a point-based system with Phase 1 criteria including Organizational Experience (600 points), Organizational References (150 points), Mandatory Specifications (100 points), Interview Presentations (100 points), and Financial Stability (50 points), totaling 1,000 points. Phase 2 includes local preference considerations up to a maximum of 6% of total points, with eligible resident businesses and those with all resident business subcontractors receiving up to 30 preference points each; local preference designations apply only to purchases funded by the City of Santa Fe and are not applicable to contracts utilizing state, federal, or grant funds. Offerors must demonstrate relevant experience with river water intake design, provide minimum three references from similar projects completed within the past three years, confirm organizational capacity to perform work within the specified timeframe, and submit independently audited financial statements or alternative financial documentation to demonstrate financial stability. All offerors must comply with the City's Living Wage Ordinance, submit a Campaign Contribution Disclosure Form, provide a Conflict of Interest Statement, and execute a Non-Collusion Affidavit. No specific funding source or budget is identified in the RFQ, and the Board reserves the right to negotiate contract terms, select components or features from multiple proposals to create a composite award, and reject any or all proposals.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .