Pre-bid for Wick Shop Storage BarnHVAC.pdf

PDF 67 KB Posted

Attached to
Wick Shop Storage Barn HVAC
Solicitation number
BPM026320
Issued by
Kent County, Maryland

About this file

This document is the minutes or notes from a pre-bid conference for a roof replacement and HVAC installation project for the Wick Shop Storage Barn located at 10701 Galena Road in Millington, Maryland. The project, referred to as EC22-09514-09, is being managed by the Maryland Department of Natural Resources (DNR). The pre-bid conference was held on November 2, 2021, and covered the scope of work, project schedule, site access, and other logistical details. The bid is due on November 16, 2021 at 2 PM and will be submitted online. The document also includes questions and answers from the pre-bid conference, such as the location of the propane tank and HVAC units.

The related state and local contract opportunity is for the HVAC installation at the Wick Shop Storage Barn, also known as the Wick Manor House, located in Millington, Maryland within Kent County. The contract will require the selected contractor to provide all necessary labor, equipment, materials, supplies, and insurance to properly install the HVAC system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roof Replacement Shop Storage

Cypress Branch NRMA

10701 Galena Road, Millington Maryland

EC22-09514-09

Minutes or Notes: Pre-Bid Conference

Date: 11/2/2021

Time: 10:00 AM

Location: 10701 Galena Road, Millington Maryland

Weather: Sunny

Attendees:

Please see attached copy of “Pre-Bid Conference Sign-In Sheet”:

Name, Organization, MBE, Phone #, Fax # and E-mail Address

New Business:

Note: All questions (after the Pre-Bid Meeting) should be referred to the Procurement Officer.

PBC – 1 Introduced the DNR Project Managers (Koren Lynch) Facility Representative

(Maynard Woodworth).

PBC-2 Reviewed the Scope of Work

Answer questions regarding Specifications.

PBC-3 Discuss: project schedule, working hours, access to the site, storage of materials and use of utilities / facilities.

PBC-4 Review Information to Bidders and Bid Form

Bid Due Date and Time: 11/16/2021, 2 PM

Type of Bid: Online

PBC-5 Discussion regarding facility concerns, Facility Regulations, etc.

PBC-6 Tour of job site

QUESTIONS

Q1. Location of Propane tank?

A1: Propane tank is in the back of the building right outside the back door.

Q2. Is the garage door staying and will you need a turn off switch when door is up?

A2. The garage door will be infilled with a new wall and a pedestrian door will be added.

There will not be a need for an automatic turn off switch.

Q3. Location of 2 AC unites will be where?

A3. There is a large closet area in the back of the conference room to house both units.