Text version
Statement of Work Install Perimeter Security Fence at
Metaline, WA Border Patrol Station
Procurement Request No: 20093077
1. Identification of agency, contracting activity and location:
U.S. Customs and Border Protection
U.S. Border Patrol
105 Hwy 31
Metaline, WA 99152-0022
2. SCOPE:
1.0 Provide approximately 875 linear feet of 8ft high chain link security fencing with one 16ft wide vehicle gate and one 48” wide walk thru gate. This fencing is to secure the area where there will be a vehicle, trailer, equipment and material parking and storage space at the U.S. Border Patrol station located at 105 Hwy 31, Metaline, WA 99152. The TOTAL height of the fence must be a minimum height of 8ft from the ground to include the top strand of barbed wire. See Appendix A for requirements.
3. APPLICABLE DOCUMENTS:
Specific Tasks 4.1 Task 1: Completion of essential site elements:
4.1.1 All fencing elements will be GREEN to meet municipality compliance. These elements include:
· Approximately 875 lineal feet of green fence
· 16’ manual rolling gate
· Barbed wire to meet CBP IA Design Specifications. Barbed wire will NOT be Green color.
4.1.2 Fencing design, materials, components, installation, and cleaning shall meet the Chain Link Fence Specification in Appendix A.
5.0 Deliverables and Delivery Schedule
5.1 Submittals: Permits, Cut sheets and submittal drawings for the fence materials shall be provided.
6.0 Government-Furnished Equipment and Information (GFM)
None
7.0 Place of Performance
| Metaline Falls BPS |
| 105 WA-31, Metaline, |
| Washington |
| 99152 |
8.0 Period of Performance This contract will start within twenty (20) calendar days of award. All work associated with this contract shall be completed in 90 calendar days or less.
9.0 Recognized Holidays The Government offices will not be open on these days and the contractor is not expected to perform work during these Holidays.
New Year’s Day
Labor Day
Martin Luther King Jr.’s Birthday
Columbus Day
President’s Day
Veteran’s Day
Memorial Day
Thanksgiving Day
Independence Day
Christmas Day
10.0
DAYS AND HOURS OF OPERATION:
To be coordinated with station Patrol Agent in Charge – PAIC Rick Petrey 10.1 Project Management
The Contracting Officer is the only individual with the authority to modify this contract.
10.1.1 David A Moss Contracting Officer (CO) 509-468-3969
David.A.Moss@cbp.dhs.gov
10.1.2 Rick Mandigo– Facility Maintenance Specialist (COR)
Ph: 509-468-3832
Rick.Mandigo@cbp.dhs.gov
10.2 Meetings, reviews, and or audits
The Contractor may request meetings, reviews, and or audits if needed with the COR after 72 hrs notice at the contract site. The COR can request meetings, reviews, and or audits as needed with the vendor’s Project Manager after 24 hours notice at the contract site.
10.3 Post Award Conference
A post award conference will be held before any work is done. The Contractor’s project manager, his alternate and the COR will attend this meeting. This meeting will usually be conducted over the telephone via a teleconference between all parties. Other personnel may be invited to attend.
11.0 General Information
11.1 All routine scheduled work shall be performed from 8: 00 am to 5:00 pm, Monday thru Friday, with federal holidays excluded. Emergency work may be scheduled as needed but after hours and weekend access to the Border Patrol stations shall be coordinated through the station PAIC so that station personnel can be notified. All work shall meet or exceed municipal, local, state, and national building codes. These include the NEC, FCA, IEEE, NEMA, and ANSI, http://en.wikipedia.org/wiki/National_Electrical_Code and any other codes and standards that may apply. All items shall be installed according to the manufacture’s recommendations and be consistent with work done at the journeyman or craftsman’s level.
11.2 Security
The Contractor shall comply with the Department of Homeland Security Customs and Border Protection (CBP) administrative, physical, and technical security controls to ensure that the Government's security requirements are met.
11.3 Identification Badges
All Contractor employees shall be required to sign or check in at the work site. Identification showing the Contractor’s and the individual’s names shall be worn at all times when working inside Government facilities.
11.4 Security Background Data
The following security screening requirements apply to both U. S. citizens and lawful permanent residents who are hired as Contractor’s employees. All personnel employed by the Contractor or responsible to the Contractor for the performance of work hereunder shall be able to favorably pass a Security Background Check. No exceptions to this requirement will be permitted except in an emergency and as approved on a case-by-case basis by the COR.
Failure of any Contractor’s employees to pass a favorable Security Background Check means that the Contractor has failed to satisfy the contract's requirement to provide cleared personnel. The Contractor’s failure to meet the requirement to provide cleared personnel may be grounds for termination of the contract, unless cleared personnel are timely provided as replacements. The Contractor must provide a qualified replacement capable of passing a favorable Security Background Check. This policy also applies to any personnel hired as replacements during the term of the contract. The Contracting Officer must approve all personnel replacements.
11.5 Notification of Personnel Changes
The Contractor shall notify the Contracting Officer via phone, FAX, or electronic transmission, no later than one work day after any personnel changes occur. Written confirmation is required for phone notification. This includes, but is not limited to, name changes, resignations, terminations, and reassignments (i.e., to another contract.)
11.6 Wages
The Contractor must pay at least the current required minimum wage for Federal contracts of $10.15 per hour, plus benefits. The required wage may be higher if workers are under the Service Contract or Davis-Bacon Acts.
Appendix A
CHAIN LINK FENCING SPECIFICATION
Refer to Project Manual Editing & Submitting Requirements and the Construction Documents Directive for the general editing procedure to be followed.
Have those who work on the Drawings read the Construction Documents Directive section on document coordination. Chain link fencing is the only fencing authorized by PFAC except where other types are shown on the standard plans. If local code authorities absolutely require other types of fencing at the property perimeter or other locations, submit request to Area Office for confirmation.
PART 1 GENERAL
1.1
SUMMARY
Edit as necessary to give an accurate, but brief description of the work of this Section, especially if the scope of the work is not shown graphically on the Drawings.
A.
Includes but is not limited to:
1.
Furnish and install gates and fencing as described in the Contract Documents.
B.
Related Sections
Section 02776 -
2.
Division 05 Welding and priming requirements.
1.2
REFERENCES
Delete or add references based on editing of other parts of this Section.
American Society for Testing and Materials
ASTM A 123-89a, 'Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products'
ASTM A 392-96, 'Standard Specification for Zinc-Coated Steel Chain-Link Fence Fabric'
1.3
SUBMITTALS
A.
Submit samples for approval before purchasing additional materials.
PART 2 PRODUCTS
2.1
MATERIALS
A.
Post Foundation Concrete 4,000 psi nominal strength.
Delete if no fencing atop retaining walls. B.
Post Setting Grout at Sleeves
Approved Manufacturers -a.
Super Por-Rok by Hallemite, Div of Minwax, Montvale, NJ (800) 526-0495 b.
Equal as approved by Architect before bidding. See Section 01600.
2.2
COMPONENTS
A.
Fabric
1.
Chain link fabric of 9 gauge wire galvanized after weaving with 1.2 ounce zinc coating conforming to requirements of ASTM A 392-96 2 inch mesh. Fabric shall be 7’ feet tall topped with 3 strand barbed wire mounted on 45 degree stand offs. TOTAL height must be a minimum of 8ft from ground to top strand of barbed wire. Fabric must be GREEN in color. With approval of the COR vinyl coated fabric may be used in place of the zinc coating.
2.
Twisted top and bottom selvages.
B.
Line posts, rails, and frameworks
Posts and rails shall be roll‑formed, self-draining shapes meeting strength requirements of ASTM F 761-82, Table 3, and with two ounce zinc coating/square foot of surface area.
Edit to conform with the height of the fences to be provided. 2.
Line Posts – 9-10 lengths. Provide terminus caps for all posts to pass tension wire.
For Fabric Height 8 Feet & Under -
1)
1.875 schedule 40.
C.
End, Corner, and Pull Terminal Posts -
Standards‑
2.875 (2-7/8” inch) schedule 40 posts with minimum theoretical bending strength of 486 pounds under 6 foot cantilever load. 9-10 foot lengths. Provide galvanized caps for all posts.
Delete if not applicable. b.
Gate posts for gates over 6 feet wide -
3” to 6- 5/8” Schedule 40 posts. Follow guidelines recommended by gate manufacturer if larger.
D.
Brace Rail -
1.625 schedule 40 with minimum theoretical bending strength of 247 pounds on 10 foot midpoint load.
E.
Fittings -
Pressed steel or malleable iron, hot-dip galvanized conforming to ASTM A 153. Tie wires shall be 12 gauge minimum galvanized steel.
F.
Tension Wire - 7 gauge minimum galvanized spring steel TOP and BOTTOM. NO TOP or BOTTOM RAIL.
PART 3 EXECUTION
3.1
INSTALLATION
A.
General
Fence shall be installed by mechanics skilled and experienced in erecting fences of this type and in accordance with the Contract Documents.
Paragraphs 1 and 2 may not apply on small fencing runs.
When general ground contour is to be followed, make changes of grade gradually.
Evenly space posts in line of fence a maximum of 10 feet center to center
3. NO top or bottom rail. Tension wire as specified.
Edit to fit Project Requirements. Except atop retaining walls as specified, full specified foundation should be provided. Bolt-on fencing is not acceptable. If it is necessary to install fencing in an existing slab, core drill the existing slab to the full diameter of the specified post foundation and excavate to the specified depth. Fill excavation up to the level of existing slab and finish. B.
Post Foundations
Except atop retaining walls, set posts with concrete post foundations as specified on chart below.
Line Posts concrete foundations shall be 8 inches diameter and 30 inches deep.
Gate, End, & Corner Posts foundations shall be 12 inches in diameter and 40 inches deep.
Hand form the tops of each poured concrete post foundation into domes so that they shed water.
Where fences are incorporated into slabs, measure post foundation depth from top of slab. Extend bottom of slab footing sufficient to allow specified amount of concrete around posts.
c.
At existing slabs, install fence around perimeter of slab.
Fences on retaining walls should have 12 inch long sleeves. Set pipe in sleeves.
C.
Fence
After posts have been permanently positioned and concrete sufficiently cured, install framework, braces, and tension wires.
Stretch fabric by attaching one end to terminal post and supplying sufficient tension to the other end of stretch so that all slack in the fence fabric is removed.
Fasten fabric to line posts with galvanized steel tie wires. Pass ties over one strand of fabric and hook under line post flange.
Place bottom tie to fabric even with the bottom tension wire. Space additional ties equally along the bottom and top tension wire on approximately equal spacing not to exceed 14 inches on center.
c.
Attach fabric to roll formed terminals by weaving fabric into integral lock loops formed in post. Attach fabric to tubular terminals with tension bars and bands.
d.
Hold fabric approximately 1-2 inches above finish grade line.
f.
Securely attach fittings and firmly tighten all nuts.
Delete if gates not required. D.
Manual Gates
Manual Gates shall be square welded swing gate frames with vertical stiffeners that provide for free and easy operation. Swing gate panels over 8’ in length shall have a support wheel mounted to the outside lower corner to support the weight of the gate when it swings. All hinges, latches, wheels, and accessories shall be bolted to the gate panels and posts.
Provide gate latching devices with padlock capabilities. Provide cane bolt to engage sleeve set in concrete at all double gate latching positions.
3.
Align top bar of gates with the fence top.
4.
Gates shall be plumb and on same plane as fence, both vertically and horizontally.
5.
Set gate stops and other catches in concrete.
3.2
CLEANING
Spread dirt from foundation excavations evenly around the surrounding area unless otherwise directed. Leave area free of excess dribbles of concrete, pieces of wire, and other scrap materials. Use a magnet to insure that all loose wire cuttings and hardware has been collected.
END OF SECTION