PR15399522 Solicitation.pdf

PDF 703 KB Posted

Attached to
CMR Refurbishment and Accessibility Improvements Construction Services
Solicitation number
PR15399522
Issued by

About this file

This document is a Request for Quotations (RFQ) from the U.S. Embassy in Dar es Salaam for refurbishment and accessibility improvement works at house #9 located on Toure Road in Oyster Bay. The project involves comprehensive renovation services including walk-in closet renovation, plumbing works, electrical system upgrades, generator room restoration, outdoor bathroom reconfiguration, representational ground area restoration, guard booth expansion, window and door repairs, roof tile repair, and extensive interior and exterior painting. The total project is estimated to range between $100,000-$150,000, with a planned site visit on August 7, 2025, and quotations due by September 8, 2025 at 12:00 p.m. East African time.

Contractors must be technically qualified, with requirements including an established business in Tanzania, SAM registration, prior construction experience, necessary personnel and resources, local licenses and insurance, and the ability to obtain performance security. Quotations must be submitted electronically to DarProcurementbid@state.gov, with a maximum email size of 30MB, using MS Word, Excel, or PDF formats. The U.S. Government intends to award the contract to the lowest-priced, technically acceptable offeror, with the option to conduct discussions if necessary. Offerors must comply with specific submission guidelines, including providing a detailed technical proposal, performance schedule, and proof of qualifications.

View the file

Other files

File Type Posted
SF-1442 PR15399522.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Embassy Dar Es Salaam

Date: July 30, 2025

Dear Prospective Offeror:

Subject: Request for Quotes PR15399522

Enclosed is a Request for Quotations (RFQ) for refurbishment and accessibility improvement works for house # 9 located at Toure Road, Oyster Bay Dar es Salaam. If you would like to submit a quotation, follow the instructions in Section D of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form

1442 included with this solicitation.

The U.S. Government intends to award a contract/purchase order to the responsible offeror submitting the lowest-priced, technically acceptable offer. Award may be made based on initial proposals without discussions; however, the Government reserves the right to conduct discussions if determined necessary.

A site visit will be held on August 6, 2025 at 10:00 a.m. at house 9 Toure road. Interested contractors should submit no more than two names of attendees to the address

DarProcurementbid@state.gov with subject line Request for site visit PR15399522 – CMR

Upgrade and Accessibility Project not later than August 5, 2025. at 10:00 a.m. East Africa Time.

Quotations are due by September 08, 2025 at 12:00. p.m. East African time. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be considered.

Your quotation must be submitted electronically to DarProcurementbid@state.gov.

Please ensure that the entire email, including all attachments, does not exceed 30MB.

Files should be submitted in one of the following formats: MS Word 2007/2010, MS Excel

2007/2010, or Adobe Acrobat (PDF). If the total email size exceeds 30MB, please split your submission into multiple emails, each with attachments totaling less than 30MB.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1442

2. Section A, Pricing

3. Additional information as required in Section D

4. Proof of SAM Registration

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under https://www.sam.gov/

FAR 52.204-7. Failure to be registered at time of proposal submission will deem the offeror’s proposal to be considered non-responsible and no further consideration will be given.

Sincerely, Contracting Officer

TABLE OF CONTENTS

SF-1442 COVER SHEET

A. PRICING

B. STATEMENT OF WORK

C. CLAUSES

D. INSTRUCTIONS ON HOW TO SUBMIT A QUOTATION

SECTION A - PRICING

A. PRICE

The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this purchase order for the following firm fixed price and within the time specified.

A.1 VALUE ADDED TAX

VALUE ADDED TAX (VAT). The Contractor shall include VAT as a separate charge on the

Invoice and as a separate line item in Section B.

A.2 DBA INSURANCE

Reference Section J for details. Please provide a quote in US Dollars.

A.2 BILLS OF QUANTITIES (BOQ)

Completely fill in the table below. Please quote in Tanzanian Shillings.

S/N

ITEM OF WORK QUANTITY UNITS

MATERIAL COST

LABOR AND EQUIPMENT

COST TOTAL

(TZS)

PER UNIT SUBTOTAL PER UNIT SUBTOTAL

Walk-in closet renovation at master bedroom to eliminate moldy (humid) condition.

1 Lot

Plumbing works (Master bathroom sanitary wares and all other plumbing fixture/pipes replacement)

Electrical works (electrical wires dressing/securing and eliminating unused wires plus light fixtures replacement in living, dining room and representational outdoor ground)

Generator room restoration (replacing rusted metal door and all metal wall panels)

Outdoor bathroom reconfiguration to ABA standards

Representational events ground area restoration to ABA standards.

7 Expansion of Guard Booth 2 for more airflow. 1 Lot

UPVCs Windows and doors service (locks, rails door handles and hinges replacement.)

57 item

Terracotta Roof tiles leak repair (400sqm) of replacement affected ceiling portion (150sqm)

400sqm (Roof) 150sqm (Ceiling)

Sqm

Thorough exterior/interior painting of the main house, perimeter walls, staff house and utility building (Local Materials & Labor)

3500 Sqm

11 Woodwork refinishing (wooden floor and doors) 500 Sqm

12 Natural Stone (Tanga stone) Sealing/vanish 200 Sqm

Subtotal - Labor and Materials

Value Added Tax (18%)

TOTAL PROJECT COST

SECTION B - STATEMENT OF WORK

B.1 INTRODUCTION

The US Embassy, Dar es Salaam wishes to solicit your technical proposal and pro-form cost estimate for restoration works for house # 9 located at Toure Road Oyster Bay Dar es Salaam. The work shall involve refurbishment of the entire outdoor representational ground to Architectural

Barriers Act (ABA) accessibility standards. All the required work shall be done as per scope of work, specifications, and general contract conditions. This project requires an experienced class 6 and above contractor registered by Contractor’s Registration Board Tanzania (CRB) in civil and building works to design and execute the job.

The Contractor shall provide all labor, materials, tools, equipment, supervision and other related items and activities required to complete the project.

The Contractor is responsible for the protection of existing structures and utilities. Workers shall stay within the site area. Any damage caused by the Contractor shall be repaired at the

Contractor’s expense.

Contractors are advised to visit the site and verify the existing site conditions prior developing their proposals.

NOTE: All materials and items/fixture to be installed shall be approved by the Contracting Officer

Representative (COR)/Facility Manager before use. Any changes/substitutes on materials shall be approved by COR/Facility Manger prior proceeding. Failure to do so will result in rejection of the work and the contractor will have to redo it at his/her own cost.

B.2 DESCRIPTION OF WORKS

The contractor shall be responsible for the following:

B.2.1 Master bedroom walk-in closet renovation to eliminate mold (humid) condition.

B.2.2 Plumbing works (Master bathroom shower- stall and all other plumbing fixture/pipes replacement).

B.2.3 Electrical works (electrical wires dressing/securing and eliminating unused wires plus light fixtures replacement in living room, dining room and representational outdoor ground area/Garden

B.2.4 Generator room restoration (replacing rusted metal door and all metal wall panels).

B.2.5 Outdoor bathrooms are reconfigured to ABA standards.

B.2.6 Representational events ground area restoration to ABA standards.

2 | P a g e

B.2.7 Expansion of guard booth 2 located at exit gate for smooth airflow.

B.2.8 UPVCs Windows and doors service (locks, rails door handles and hinges replacement.)

B.2.9 Terracotta roof tile repair and affected ceiling replacement.

B.2.10 Thoroughly interior and exterior painting for the main house, perimeter walls, staff house and utility building (Local Materials & Labor).

B.2.11 Woodwork refinishing (wooden floor and doors)

B.2.12 Natural Stone (Tanga stone) Sealing/vanish.

B.2.1 Walk-In Closet Renovation

There has been significant mold/humid condition over the past three years in master bedroom closet that caused much damage/disturbance to properties and building structure. The contractor is therefore required to assess and analyses the situation and come up/ suggest the best solution to overcome the problem in future.

The contractor shall as well do the following along with the proposed corrective measures suggested:

2.1.1. Asses and repair for any damage ventilation duct located at the roof attic, by making sure the system and associated sub-system are functioning properly, it allows smooth air movement/exchange inside and out the main building.

2.1.2. Replace any damaged wood, locks, handles or hinges for the closets/cabinets that may be caused by mold effects. All materials used for replacement shall be of similar quality or higher and shall be inspected/approved by COR before installation.

2.1.3. The contractor shall introduce two courses vented/louvered blocks of standards size at topmost level of existing block wall facing the hallway to the family living room. This will also increase air circulation in/out of the closet.

2.1.4. The contractor shall measure and record the humidity of the area after all solutions are in place to ensure it is within allowable room humidity/temperature.

B.2.2 Plumbing Works

The following plumbing works shall be performed at Master Bathroom by the contractor:

2.2.1 Carefully remove all old sanitary wares for disposal. (Toilet sink, wash basin, bathtub, shower stall and the mirror)

2.2.2 Observe and repair any leakage that may be found after removal of all bathroom fixtures.

3 | P a g e

2.2.3 Supply and install new sanitary wares and fittings (toilet sinks/European style, washing basins on existing vanity, mixers tapes, complete set shower stall, bathtub and all necessary bathroom accessories). in the same position as old ones.

2.2.4 The contractor shall supply and install a new tempered glass shower stall of the same size as existing.

2.2.5 The contractor shall also supply and install a new free stand bathtub (Complete set) to replace the current tub in the master bathroom.

2.2.6 All new sanitary wares and plumbing accessories supplied shall be of Spanish, Italian or

American type, no Chinese products will be accepted (samples must be given to COR for approval before installation).

2.2.7 Floor tiles ceramic/porcelain to match existing wall tiles shall be installed before sanitary wares are reinstalled.

2.2.8 All sanitary wares shall be reinstalled by following manufacturer installation procedures and the contractor shall check/test for any leakage after installation is complete.

2.2.9 Finally, the contractor shall assess the entire plumbing system and correct any defect found most likely water leakage/blockage.

2.2.10 Pressure water test shall be performed before project handover by the contractor in presence of embassy COR to verify proper functioning of the system.

B.2.3 Electrical Works

The work will consist of mainly complete rough-in and finish work for the electrical reinstallation works for the whole building internally and externally. The contractor shall furnish and install all the wiring, conduits, etc. to the existing electrical layout of the building.

The contractor should carefully remove all old unused electrical wires in the main staff house, conceal all surface wiring and replace any broken electrical fixtures (i.e. outlets, switches conduits, trunks and bulbs/light fixture). All used electrical wires found at the roof attic and elsewhere shall be neatly dressed/secured in conduits to prevent them from electrical danger/electrocution.

The following specific tasks shall also be done by the contractor in addition to the above;

i. Installation/introduction of Plastic emergency lights with adjustable lamp heads (Lamp

Wattage 0.54W and Emergency Wattage 1.08W) “FULHAM” brand or equivalent, in the main building to save as buffer time before the generator kicks up when city power is off.

ii. Improving lighting/illumination at representational living area this shall involve replacing the chandelier currently installed at the living area with larger/longer and brighter one. All ceiling and wall lights shall also be replaced with much brighter fixtures. The design of the wall lights should much with the chandelier.

iii. All openings/unused individual breakers in main circuit breakers shall be covered by blank plates to prevent leakage.

iv. Introduce/install a new twin receptacle where Piano is currently located.

v. Replace 2 exhaust fans at roof attic which save as air circulator within and outside main building. The new fans will be bigger in size and the exact size to be decided during site visit.

4 | P a g e

B.2.3.1 Measurement

Measurements may be performed by on-site surveying or using record drawings. The contractor is responsible for ensuring that the measurements used are accurate.

B.2.3.2 Codes, Standards and Specifications

The standards and codes of practice listed here shall be considered as a guideline only and shall not relieve the Contractor from his contractual obligations to provide all equipment, components, Works, and services in accordance with the laws, by laws and rules:

16th edition of I. E. E wiring Regulations in Building – BS7671:1992;

IEC Standards.

British Standards and Code of Practice.

Tanzania Standards as published by the Tanzania Bureau of Standard.

Any other Code and Standard and Approved by the Consulting Engineer.

Where the equipment or part of it complies with other internationally recognized standards, which are less stringent than the above-mentioned standards, the differences are to be stated in writing and must accompany the tender submission.

NB;

Voltage between NEUTRAL and EARTH should not exceed 3ACV I.E.C standard

Earth grounding and bonding is required to be less than 25Ω US NEC and IEC

B.2.3.3 Specification of Equipment and Workmanship

2.3.3.1 Switches and Fuse Switches

These shall be in strict accordance with BS 5419. All fuse switches shall comply with BS 5419 and shall have a fault rating at least equal to the fault rating of the switchboard in which they are installed. Cartridge fuse links to BS 88, category AC 46, Class Q1 and fusing factor not exceeding 1.5 shall be supplied with each fused switch.

Mounting arrangements shall be such that individual complete fuse switches may be disconnected and withdrawn, when necessary, without extensive dismantling work. When switches are arranged in formation all necessary horizontal and vertical barriers shall be provided to ensure segregation from adjacent units. Means of locking the switches in the ‘OFF” and “ON” positions shall be provided together with suitable brass padlocks.

2.3.3.2 Distribution Boards

The Distribution Boards shall be fitted with high quality fuse carriers and bases, removable insulated shields to provide adequate protection against accidental contact with live metal, and circuit indicating labels fixed inside the cover.

The Distribution Boards shall be complete with HRC fuses to BS 88:1982, Category 440 Volts.

Where the requirement for miniature circuit breakers the Distribution Boards shall be fitted with molded thermoplastic units of the combined thermal overload and magnetic short circuit tripping type to BS 3871: Part 1 1984 having clearly marked “ON” and “OFF” positions. MCB’s of all ratings shall have a minimum short circuit current breaking capacity of 3000A for single breakers and 4000A for triple pole breakers.

Insulation resistance for the entire house from the main distribution board to entire distribution is to be 0.5mΩ at the voltage of 500VDC IEC.

5 | P a g e

2.3.3.3 Conduit and Associated Fittings

Conceal all surface wiring in conduit run in chases in walls. All conduits shall be fixed by means of mild steel pipe hooks or non-metallic saddles spaced not more than 1000mm. Where conduit is concealed behind the plaster it shall be chased to a depth of either 15mm below finished plaster level or installed flush with the structural wall level before application of plaster, whichever is the lesser depth.

2.3.3.4 PVC Conduit

The conduit shall be bent and formed strictly in accordance with the Manufacturer’s instructions. Small sized conduit ranging from 16 to 25mm diameters shall be bent cold by inserting the correct size bending spring. It is essential for right angle bends that the conduit is bent past 90° to allow for ‘spring back’.

Large sized conduit should be pre-heated before inserting rubber cord to prevent kinking.

Conduit badly formed or bent, or damage in any way, shall not be used.

B.2.3.4 Installation

2.3.4.1 Examination and Preparation

The Contractor shall inspect all existing conditions, which may impact successful completion of the project. Successful completion of the project is defined as the project being successfully completed on time and within budget while not adversely affecting the occupants of the residence. The Contractor shall report to the COR and Post’s General Services Officer any defective existing conditions found which would impair successful completion of the project and include recommended procedure for overcoming the defects. Await response from COR before proceeding with aspects of the renovation project that are in question.

The Contractor shall ensure that cables in any conduit/trucking follow the space capacity ratio.

The Contractor shall plan the conduit/trunking runs to confirm the building structure and collaborate with the Main Contractor ensuring that all works required are done at a proper time and in proper place. Any mistake or omission shall be rectified at the expense of the Contractor.

Generally, all the installations shall either be flushed or concealed above ceilings or in purpose boxing unless stated otherwise. Cables for power for general use, air conditioning units, lighting, cookers, and any other equipment shall be installed in concealed heavy-duty PVC conduits.

2.3.4.2 Products

All materials will be supplied and installed by the contractor. The contractor shall be responsible for furnishing any other materials to finish the required work stated herein.

i. Receptacles and switches.

ii. Wires and cables.

iii. Conduits and boxes.

iv. Distribution Board (Insulation resistance for the entire house from the main distribution board to entire distribution is to be 0.5mΩ at the voltage of 500VDC IEC.)

6 | P a g e

2.3.4.3 Execution

All the conduits shall be embedded in the walls. Minimum damage shall be allowed to the walls’ plaster and paint. For all new wiring, the wiring and conduits shall be connected from the electrical panel from the utility room through the gypsum ceiling. The contractor should repair the gypsum ceilings prior delivering the project.

The work will be performed according to approved shop drawings. Any changes due to field conditions are to be discussed with the COR.

Conduit joints shall be made by brushing plastic solvent cement on insides of plastic coupling fittings and on outsides of duct ends. Each duct and fitting shall be slipped together with a quick

1/4ً turn twist to set the joint tightly.

A 1/4 nylon or polypropylene pulling rope shall be pulled in each unused or spare conduit.

All embedded conduits shall be rigid PVC conduit.

Field-made bends and offsets shall be made with an approved conduit air heaters or a special fitting can be used. Crushed or deformed raceways shall not be installed.

Conduits shall be securely and rigidly fastened in place at intervals of not more than 2 meters and within 300 mm of boxes, cabinets, and fittings with approved wall brackets, conduit clamps, conduit hangers or ceiling trapeze.

Conduits shall be fastened to boxes and cabinets with connectors, locknuts and bushings.

Exposed raceways shall be installed parallel or perpendicular to walls or structural members.

Power raceways shall not contain more than four 90-degree bends or the equivalent in any one run. Communication raceways shall not contain more than two 90-degree bends or the equivalent in any one run.

A conduit-coupling fitting, threaded on the inside, shall be installed flush with the finish floor.

The bottom of boxes installed in ceramic tiles for concealed wiring shall be mounted flush with the tiles and at edges of the tiles to minimize cutting of tiles.

Color-coding shall be provided for service, feeder, branch and ground conductors. The color should be green for grounding conductors and white for neutrals. The grounding conductor shall be bare copper, except were installed in conduit with associated phase conductors. Insulated conductors shall be of the same material as phase conductors and green color coded.

When the installation is complete, the conduits shall be sealed with approved sealing compound.

Conductor phase and voltage identification shall be made by color-coded insulation. Conductors with black insulation may be furnished and identified by the use of half-lapped bands of colored electrical tape wrapped around the insulation for all entire length inside power panels and boxes.

Phase identification shall be maintained continuously for the length of a circuit, including junctions.

The color coding for 3-phase low voltage system shall be as follows: Red (A), Yellow (B), and

Blue(C).

The feeders shall be tagged to indicate the electrical characteristics (voltage, HZ, cable size, circuit number and panel designation).

Control circuit conductors shall be identified by color-coded insulation (black color-coded) and marked by numbers.

Wiring shall be carried out in an approved type of PVC insulated copper cables.

The color of the sheaths shall comply with the color code requirements of the 16th Edition of the IEE Wiring Regulation – 514-06-01 applicable to the entire lengths of the cables.

7 | P a g e

All wires and C.B.'s (circuit breaker) inside power panels shall be marked by numbers.

All wires inside light fixtures, receptacles, disconnect switches and boxes shall be marked with circuit numbers and panel configuration.

All power panels shall be provided with circuit directory cards to clearly indicate circuit no., CB size, wire size and load.

All power panels, disconnect switches... etc, shall be tagged with labels.

2.3.4.4 Test

5.4.1 Megger test for cables and wires.

5.4.2 Performance test for light fixtures, receptacles…etc

5.4.2 Grounding/Earthing test to ensure it is below 25Ω

B.2.4/5/6/7 Outdoor Representational Ground Maintenance/Repair

2.4 Generator room grill metal door and fixed metal frame which are heavily rusted/corroded shall be replaced with hot dip galvanized steel grills of same design and thickness.

2.5 Contractor shall reconfigure existing outdoor bathrooms used during representational events to comply with ABA standards as following:

2.5.1 One of the rooms (toilet stall) in Male and female bathrooms shall be reconfigure such the minimum size be (155x145) cm to allow wheelchair users to maneuver more comfortably and have an outward-swinging door.

2.5.2 Toilet in ABA washroom shall follow the following requirements:

i. Toilet Seat Height: The height of an accessible toilet seat should be between 17 inches (43.18 cm) and 19 inches (48.26 cm) above the floor.

ii. Flush Controls: Flush controls should be mounted on the open side of the toilet and should not require tight grasping, pinching, or twisting to operate. Lever-style flush controls are recommended.

2.5.3 Grab Bars

i. Height: Grab bars must be mounted between 33 inches (83.82 cm) and

36 inches (91.44 cm) above the floor.

ii. Diameter: Grab bars should have a diameter between 1.25 inches (3.18

cm) and 1.5 inches (3.81 cm) to provide a comfortable grip.

iii. Clearance: Grab bars must have a clearance of 1.5 inches (3.81 cm) from the wall to allow for a firm grasp.

iv. A horizontal grab bar must be installed on the side wall nearest the toilet and have a minimum length of 42 inches (106.68 cm) and extend at least

12 inches (30.48 cm) from the rear wall.

2.5.4 Sinks

i. Height: The rim or counter of an accessible sink should be no higher than

34 inches (86.36 cm) above the floor to accommodate wheelchair users.

ii. Clearance: In terms of clearance, there needs to be a minimum of 29 inches (73.66 cm) of clearance underneath the sink to accommodate a wheelchair user’s knees and provide space for maneuvering.

iii. Depth: The depth of an accessible sink should be no more than 6.5 inches

8 | P a g e

(16.51 cm) to ensure that people with limited reach can easily access the faucet and controls.

iv. Faucet Controls: Faucet controls should be lever-operated or sensor-activated to eliminate the need for grasping and twisting.

2.6 Representational Ground Restoration

2.6.1 Contractor shall modify the walkway from the main house to the outdoor bathroom by introducing smooth running ramp that will eliminate the existing steps for wheelchair accessibility.

2.6.2 The final surface finish of the ramp should match existing floor surface (Natural Tanga stone finishing).

2.6.3 Contractor shall also introduce guardrails on the existing ramp to main entrance door to prevent slipping/falling hazard.

2.6.4 The UPVc double door leading to outdoor representational ground (backyard) shall be modified to eliminate the step that hinders wheelchair to pass through by introducing rubber ramp or concealing door railing inside the floor.

2.7 Expansion of Guard Booth 2

B.2.8 UPVc Windows and Doors Repairs

All UPVc windows and doors present at the main house shall be thoroughly repaired/serviced as outlined below but not limited to:

2.7.1. Removing all locks, sliding rails, handles, and hinges which are critically rusted out and replace them with new ones.

2.7.2. Contractors shall replace the same with Zinc coated electrolyte/PVC locks, rails, hinges, and handles, they must be resistant to marine weather condition to avoid rusting.

2.7.3. Hinges, rails, and locks shall be properly installed for the smooth opening and closing of all windows and doors.

2.7.4. All windows and doors shall be tested for proper operation and approved by COR before project decommissioning.

B.2.9/10/11 Exterior/Interior Painting

(Main House, Staff House, Guard Booth, and Boundary Walls)

Painting shall include all block works, woodworks, and metals found in any part of the residence and shall be done as described below:

A- Preparation

a) All external surfaces to be painted shall be cleaned with a high-pressure spray wash prior to painting. Any lose or peeling paint shall be scraped and sanded as needed prior to painting.

b) Wash all surfaces to be painted with an anti-fungal wash applied by manufacturer instructions.

9 | P a g e

c) Any cracks and/or holes in plaster or concrete walls shall be cleaned and filled with appropriate sand - cement mixture prior to painting. Any exposed metal reinforcing bars shall be cleaned with a wire brush and primed with a zinc-based primer. The area repaired shall be spot primed.

d) Any metal work shall be sanded/metal brushed prior to painting. Where there is rust evident or the surface has peeled or blistered, the area shall be cleaned to bare metal and a coat of zinc-based primer applied to the area prior to painting.

e) Any woodwork that shows signs of peeling or blistering after the initial power wash will be sanded down to bare wood and spot primed prior to painting.

B- Technical Specification for Painting Work

Paint surfaces as directed by the task order. Match paint to similar adjacent materials or surfaces.

(1) "Paint" includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats.

(2) Product Data: Contractor shall submit manufacturer's technical information, label analysis, and application instructions for each paint material proposed for use to the COR, prior to starting work. As an attachment, list each material and cross-reference specific coating and finish system and application. Identify each material by the manufacturer's catalog number and general classification.

(3) Single Source Responsibility: Provide primers and undercoat paint produced by the same manufacturer as the finish coats.

(4) Material Quality: Provide the manufacturer's best quality trade sale type paint material. Paint material containers not displaying manufacturer's product identification will not be acceptable. “Jotun” paints or equivalent/more required.

(5) Deliver materials to the job site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label with trade name and manufacturer's instructions.

(6) Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 degrees F (7 degrees C).

Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily.

(7) Project Conditions: Do not apply paint when the relative humidity exceeds 85 percent, at temperatures less than 5 degrees F (3 degrees C)

10 | P a g e above the dew point, or to damp or wet surfaces. Apply paint only in temperatures in accordance with manufacturer's specifications.

(8) Examine substrates and conditions under which painting will be performed for compliance with requirements. Do not begin application until unsatisfactory conditions have been corrected.

(9) Preparation:

• Remove hardware and hardware accessories, plates, light fixtures, and items in place that are not to be painted or provide protection such as taping prior to surface preparation and painting. (Taping includes windows, door jams, etc.)

• Clean and prepare surfaces to be painted in accordance with manufacturer's instructions before applying paint or surface treatments. Remove oil, dust, dirty, and loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, Contractor may be required to remove all existing coats of paint and sealers if prior paint application shows signs of improper adhesion, i.e., such as peeling, chipping. All surfaces must be clean and dry. Schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted surfaces.

• Notify the owner in writing of problems anticipated for any minor preparatory work required, such as but not limited to, filling nail holes, cleaning surfaces to be painted, and priming any requisite areas. Plan preparatory work as some areas will have nail holes or areas that will need to be primed or sealed. Replace all covers and equipment after painting.

(10) Materials Preparation: Mix and prepare paint in accordance with manufacturer's directions. Do not water down or thin paint.

(11) Application: Apply minimum of three coats of paint in accordance with manufacturer's directions and as recommended in section a-e below. Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

(a) Contractor shall paint color samples of the color to be used on a section of the intended area to be painted before the actual paint date is scheduled to ensure that the color selected is the most appropriate color available.

(b) On exterior masonry surfaces and soffits, apply a high-quality exterior grade latex base paint that matches as closely as possible the existing color on the exterior of the property, or a color as otherwise specified by the owner. Prior to painting, the surface is to be scraped, sanded, filled, and primed with a latex base primer. The contractor should plan on extensive preparatory work prior to painting. Do not apply exterior paint in rain, fog or mist; or when the relatively humidity

11 | P a g e exceeds 85 percent; or to damp or wet surfaces. Apply a 30-inch high from ground level a black oil-based paint “skirting” around the perimeter of all building and/or wall surfaces which are to be painted. In exterior staircases the skirting shall be reduced to a height of 6 inches from the top edge of each step. Paint all fascia board with oil-based paint.

(c) Provide finish coats that are compatible with the primers used.

(d) The number of coats and film thickness required is the same regardless of application method. Do not apply succeeding coats until the previous coat has cured. Sand between applications were required to produce a smooth, even surface.

(e) Apply additional coats when undercoats or other conditions show through final coat, until paint film is of uniform finish, color, and appearance.

(12) Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable, and before subsequent surface deterioration. Allow sufficient time between successive coats to permit proper drying. Do not recoat until the paint has dried.

(13) Minimum Coating Thickness: Apply materials at the manufacturer's recommended spreading rate. Provide total dry film thickness of the system as recommended by the manufacturer.

(14) Prime Coats: Before application of finish coat, apply a prime coat as recommended by the manufacturer to material required to be painted or finished, and has not been prime coated.

(15) Brush Application: Brush-out and work brush coats into surfaces in an even film. Eliminate cloudiness, spotting, laps, brush marks, runs, sags, ropiness, or other surface imperfections. Draw neat glass lines and color breaks.

Apply primers and first coats by brush unless manufacturer's instructions permit use of mechanical applicators.

(16) Mechanical Applications: Use mechanical methods for painting applications permitted by manufacturer's recommendations, governing ordinances, and trade union regulations.

Wherever spray application is used, apply each coat to provide the equivalent hiding of brush-applied coats. Do not double-back with spray

12 | P a g e equipment building-up film thickness of two coats in one pass, unless recommended by the manufacturer.

(17) Upon completion of painting, clean glass and paint-spattered surfaces.

Remove spattered paint by washing, scraping or other proper methods, and using care not to scratch or damage adjacent finished surfaces.

(18) Remove temporary protective wrappings after completion of painting operations.

2.4 Natural Stones (Tanga Stones) Sealing

2.4.1 The contractor shall pressure wash (deep cleaning) and existing surface and remove any loose/old vanish using special chemical vanish remover.

2.4.2 The contractor shall then repair any damage observed on stones surfaces and all cracks and open joints shall be filled with appropriate cement motor ratio.

2.4.3 He shall then allow a minimum of 24 hours drying time (curing) before applying new finish coats.

2.4.4 Apply 3 coats of Sandstone Sealer or Stone Shield from Nabaki for final finish coats.

2.4.5 The final finish coats should be matt finish (leaving the stone with natural color), water repellant and prevent bleaching/discoloration of the stone.

2.6 Wooden/Parquet Floor Refinishing

2.6.1 Sanding the floor

Sand the floor to bear wood to remove existing stain and finish, starting with course to medium grit and finishing with fine grit sandpaper.

2.6.1.1 Begin with 40 grit sandpaper, or use the grit recommended for your sander.

Sand the floor for a second time, using 60grit sandpaper, and following the same techniques as you just used for 40 grits.

2.6.1.2 Wait for the dust to settle, then vacuum the dust. Fill any small dents or nail holes with a Stainable Wood Filler.

2.6.1.3 Sand the floor for a third time, this final sanding should be done using no higher than

100 grit.

2.6.1.4 Wipe or vacuum up all dust on baseboards, windows, sills, doors, door frames and other surfaces. Clean from the highest surface to the lowest, in that order.

2.6.1.5 Thoroughly wipe the floor with a clean cloth dampened with mineral spirits and allow drying.

2.6.2 Staining the Floor

2.6.2.1 Stir stain thoroughly before and occasionally during use.

13 | P a g e

2.6.2.2 Start in a back corner and apply the stain with a natural bristle brush or clean cloth.

Follow the label directions. Be careful to plan your exit so you don’t stain yourself into a corner.

2.6.2.3 Apply the stain in the direction of the grain. Let the stain penetrate until you achieve the desired color. Remove excess stain with a clean cloth. If a darker color is desired, wait

4-6 hours, and then apply a second coat, repeating the same steps you used for the first.

2.6.2.4 Once the floor is stained, let it dry for at least eight hours before applying Super-Fast-

Drying Polyurethane for Floors finish.

2.6.2.5 Apply Sanding sealer to seal bare wood floor, then sand it before applying finish clear coat.

2.6.3 Topcoat Application

2.6.3.1 Start along a wall and apply the clear finish. Apply a thin coat using a lambswool or synthetic pad applicator or a natural bristle brush. Maintain a wet edge to avoid lap marks, preferably overlapping into the finish you previously applied by several inches. Be sure to feather in your start and stop places with your applicator.

2.6.3.2 Let dry at least 3-4 hours until film is no longer tacky, and can be walked on in soft, flat shoes without damaging the surface

2.6.3.3 No Sanding is required.

2.6.3.4 Apply a second clear coat surface floor finishes following the same steps as you used for the first coat.

B.3.0 SUBMITTALS (EVALUATION CRITERIA)

The Contractor shall submit the following as part of their bid:

3.1 Technical proposal with clearly stated work method statement.

3.2 A tentative schedule for the project which shall not exceed the government estimate of

90 working days.

3.3 Company organization Chart portfolio, including previous similar works, references, and CVs of key Personnel for this project.

3.4 Project Supervisor/Manager holding a degree in civil engineering and at least three years’ experience in construction projects managements works.

3.5 Financial Capability proof to undertake this project as per the required specifications and time.

B.4 CONDITIONS OF CONTRACT

B.4.1 General

This is a firm fixed price turnkey project, and the amount quoted shall include all work described in the scope of work and the general condition of contract. The lump sum price quoted shall be fixed and nothing extra will be entertained on any account.

The Contractor shall restore all surfaces disturbed by the work to match with existing surfaces.

Any deviation from the original contract/scope of work shall be reported to the Contracting Officer

14 | P a g e

Representative (COR) before work begins and approved by the Contracting Officer (CO). No additional work or changes will be carried out without contract modification and prior approval.

B.4.2 Responsibilities of the Contractor

• The Contractor shall be responsible for procuring, supplying, transporting, and providing all labor, materials, tools and equipment etc., required for completion of the work in all aspects and as per the scope of work.

• All expenses towards mobilization at site and demobilization including bringing in equipment, workforce and materials, dismantling the equipment, clearing the site etc. shall be deemed to be included in the rates quoted by the Contractor against various items of schedule of rates and no separate payment of such expenses shall be considered or granted.

• The Contractor shall employ and provide one full time civil engineer to supervise the project. The assigned engineer should have proven prior experience of carrying out this type of work.

• The Contractor shall not proceed with the next scheduled activity until the previous activity has been checked and approved by the COR. The Contractor shall note all inspection dates in the schedule chart.

• The Contractor shall always keep the site clean and accessible to Embassy employee.

• All required permits to execute the project shall be the sole responsibility of the Contractor.

B.4.3 Specifications

Work under this contract shall be carried out strictly in accordance with the specifications attached and will meet U.S. and Local codes.

B.4.4 Execution of Work

The Contractor is advised to review the material specifications and the scope of work. The

Contractor should visit and walk through the site to familiarize themselves with the site conditions and to understand the exact quantity and quality of work

Within 3 working days of Contract Award, the Contractor shall submit the following items via email:

a. Bar chart for review and approval by the COR. All dates and time schedules agreed upon shall be strictly adhered to. The Contractor shall notify the COR in advance regarding anticipated problems or delays throughout the project, or any deviation of the schedule.

b. Weekly schedule/activity plan for the coming week for the duration of the project prior to the start date.

3. For dismantling/blocking or making connection to any existing services or any shut-down, Contractor shall inform the COR at least 3 (three) working days in advance and proceed with the work only after approval from the COR.

15 | P a g e

B.4.5 Project Duration:

The duration of the project shall not exceed 90 working days.

B.4.6 Materials

i. All materials used in this work shall be new and conform to the contract specifications as per US and local codes.

ii. Materials shall conform to the latest US Standards specifications as amended to date and carry certification marks. The contractor shall submit material samples and catalogues for pre-approval.

iii. All materials used on the project shall be approved by the Contracting Officer Representative

(COR) before use. Any changes/substitutes for material shall be approved by COR before proceeding.

iv. All materials shall be stored in a proper manner and protected from natural elements so as to avoid contamination, damage, or deterioration.

B.4.7 Site Clearance and Cleanup

i. The Contractor shall clear away all debris and excess materials accumulated at the site and dispose of it away from the premises daily, maintaining a neat site condition.

ii. Upon project completion, the Contractor shall remove all surplus materials and leave the site in a broom clean condition.

B.4.8 Workmanship

Workers working on the site shall be skilled in their job and have relevant job experience.

B.4.9 Working Hours

1. Working hours should be from 08:00 A.M. to 18:00 P.M. from Monday to Sunday.

B.4.10 Safety procedures

4.10.1 Scope and Application

Contractors must meet with POSHO or representative before each phase of work begins to discuss safety concerns and agree upon appropriate PPE, methodology, and risk mitigation plans.

Within 3 days of contract awarding the contract the contractor shall submit a comprehensive safety plan. The plan will identify all hazards associated with each portion of the project schedule. It shall include mitigation strategies, procedures, and PPE requirements to be followed by contracting staff. This plan must be approved by the CO/COR prior to commencement of any work.

Contractors shall acknowledge POSHO authority to specify methods and safety equipment, and monitor the work until complete, approved, and shut down.

Within 3 days of contract award the contractor shall submit a comprehensive emergency response plan. This plan will always include procedures and materials available onsite for

16 | P a g e first aid. The plan shall also include ambulance and local emergency room/hospital contact information. The plan shall identify where and how the contractor will transport injured personnel for care. It will also include a statement of how the contractor plans to pay for care received at local facilities. This plan must be approved by the CO/COR prior to commencement of any work.

These documents apply to all Contractors and sub-Contractors working at or on American

Embassy property owned or leased as specified in the scope of work. While working on U.S.

Government projects the Contractor or sub-Contractor are responsible for maintaining an agreed upon and approved level of safety for the workers and the public.

4.10.2 This basic requirement is as follows:

The contractor shall provide and maintain work environments and procedures which will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities; avoid interruptions of Government operations and delays in project completion dates; and control costs in the performance of this contract. For these purposes, the contractor shall:

4.10.2.1. Provide appropriate safety barricades, signs, and signal lights.

4.10.2.2. As applicable, comply with the OBO/CFSM Division 1, Section 013525

Construction Safety and Occupational Health standards as referenced in:

i. The latest edition, U.S. Army Corps of Engineers (USACE) Safety and

Health Requirements Manual, EM 385-1-1 dated 30 November 2014. This document is available at the U.S. Government Printing Office, Washington, D.C.

ii. NFPA Code 241, Standard for Safeguarding Construction, Alteration, and

Demolition Operations.

iii. ANSI A10 Series Standards for Safety Requirements for Construction and

Demolition.

iv. NFPA Code 51B, Standard for Fire Prevention during Welding, Cutting, and Other Hot Work.

v. NFPA 10, Standard for Portable Fire Extinguishers.

vi. NFPA 70, National Electrical Code

vii. Department of State, Office of the Procurement Executive, PIB # 2015-05, Combating Trafficking in Persons.

4.10.2.3. Ensure that any additional measures the contracting officer determines to be reasonably necessary for this purpose are taken.

4.10.2.4. Proper Protective Equipment will be worn by workers while in any work area or while performing tasks that create hazards for workers. The requirements listed below are minimum requirements and may be supplemented or added to by the

POSHO.

4.10.2.5. Safety glasses will be worn while performing the following

i. Drilling

ii. Chiseling, chipping

17 | P a g e

iii. Wood working, metal working

4.10.2.6. Hearing protection will be provided for all those who operate loud power tools and equipment. Hard hats will be worn in areas where falling objects are a hazard.

4.10.2.7. Gloves will be worn for cleanup and removal of work area waste and materials. i. Proper footwear will be worn by all workers, including safety shoes.

4.10.2.8. Electrical issues.

i. All power cords and power taps will be wired appropriately, leaving no exposed wires that are alive or could come in contact with staff or other personnel.

ii. While working on electrical systems proper lockout/tag-out procedures will be followed, and the circuit being worked on will be de-energized (turned off at the main breaker).

iii. Power cords and temporary power will be GFCI protected and shall not be placed in areas that are prone to flooding or are wet, (i.e., running through puddles on the floor).

iv. Equipment will be plugged into a standard GFCI-protected receptacle and not wired directly into power taps.

4.10.2.9. Waste cleanup and removal. All excess or waste materials will be removed from the site at the close of each workday. Debris will be removed to include food bags and containers. Staging of materials shall be in an agreed upon location.

4.10.2.10. Safety meetings shall occur at least once a week with at least one Embassy staff member present, unless otherwise approved.

4.10.2.11. Records. The contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the contracting officer.

4.10.2.12. Subcontracts. The contractor shall be responsible for its subcontractors' compliance with this clause.

4.10.2.13. Notification. The contracting officer shall notify the contractor of any non-compliance with these requirements and the corrective actions required. This notice, when delivered to the contractor or the contractor's representative on-site, shall be deemed sufficient notice of the non-compliance and corrective action required. After receiving the notice, the contractor shall immediately take corrective action. If the contractor fails or refuses to take corrective action promptly, the contracting officer may issue an order suspending all or part of the work until satisfactory corrective action has been taken. The contractor shall not

18 | P a g e be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any suspension of a work order issued under this clause.

B.5 QUALITY CONTROL AND QUALITY ASSURANCE

Note: See Appendix 1 below for a detail QASP

B.6.1 Introduction. A principal factor of performance on this project is the Contractor’s control of the quality of workmanship. The Contractor shall establish and maintain a project-specific

Quality Management Program (QMP) which defines and implements a quality system. The quality system is a documented organizational process which describes responsibilities, procedures, and resources for providing quality control and quality assurance on a project. Effectiveness of the

QMP is achieved through adequate planning, forceful direction, and checking in the sense of measurement and evaluation. The QMP applies to the control of quality throughout all areas of contract performance.

B.5.2 Quality Management Program:

The Contractor’s QMP shall be COR-approved to provide employees, consultants, and/or joint-venture partners with established, uniform procedures for production of project data and documents throughout the construction process. Principal functions of the QMP are the following:

5.2.1 Quality Control (QC):

Operational techniques and activities that are used to fulfill requirements for construction quality.

5.2.2 Quality Assurance (QA): Documentation of planned and systematic actions required to provide confidence that construction services provided are based on project requirements and satisfy stated requirements for quality.

B.5.3 Audits After award of the Contract:

The Government may perform audits of the Contractor’s QMP to periodically assess conformance with the QMP. Disapproval of the program, or major portions, may be cause for a delay in progress of the project’s development or, in some cases, withholding acceptance of the Contractor’s performed services. The Government may examine the Contractor’s existing quality system prior to award of this contract as part of a pre-contract assessment, in order to determine the ability of the Contractor to satisfy the “quality” requirements of this contract.

B.5.4 Agreement on Quality Assurance:

The Contractor shall develop a clear understanding with all his consultants on quality assurance matters for which the contractors are responsible, and the quality assurance program of the contractor shall be integrated with that of the Contractor of record.

B.5.5 Organizational Structure:

The Contractor shall define and submit a QMP organizational structure within 15 days of contract award, including charts and a description of responsibilities of key persons who will perform the services.

This is the start of the file's text. The full file is on GovTribe.