PR 23-31009 PWS 20230130 Draft Status.docx

DOCX document 76 KB Posted

Attached to
AC-130J IRSS Engine Study Federal contract opportunity
Solicitation number
FA8509-23-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to AC-130J IRSS Engine Study, newest first.
File Type Posted
RFI IRSS Engine Study Final.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for

AC-130J Infrared Suppression System (IRSS) Impact on Engine Life

Purchase Request: FD2060-23-31009

30 January 2023

DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 17-08-18). Other requests for this document shall be referred to AFLCMC/WIUAI, Robins AFB, GA 31098-1670

CHANGE PAGE

REV
DATE
AUTHOR
CHANGE
-
30 January 2023
Michelle Thompson
Original

1.0 Description of Services

1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to provide Specialized Engineering Studies on the AC-130J aircraft modified with the W.R. Davis Infrared Suppression System (IRSS). These engineering services include analyzing the effects of the IRSS system, as designed and installed, on the AC-130J engines. Contractor must work collaboratively with the AFLCMC/WIU engineers and equipment specialists (as needed) as well as other contractors, including but not limited to Rolls Royce, the engine manufacturer, and Lockheed Martin (LM), to analyze the impacts the IRSS system created on the engines and determine how much of the life of the engines has been affected, all of which could affect the service contract on the engines. Analysis of the IRSS integration shall include, but not be limited to:

· Exhaust system airflow

· Impact on engine power – Ground, flight, degraded engine, degraded modification

· Impact on exhaust gas temperature margin.

· Engine transient operation

· Ground operations

· Engine compartment ventilation

· Fire detection and suppression

· General impact on engine life

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by providing the engineering analyses required to determine if and when the Government could expect to see any potential issues on the engines for aircraft modified and operating with the IRSS system installed. These potential issues could affect future costs for repair by voiding the warranty of the engines, increasing the time between maintenance required on the engines, and possibly the potential for early replacement of the AC-130J engines.

1.3 Background: The requirements for the W.R. Davis IRSS system installed on the AC-130J aircraft were identified prior to the beginning of the program and required that the addition of the IRSS system have minimal to no effect on the wings and have minimal to no performance degradation on the engines of the aircraft. Initially, there were many analyses accomplished (including but not limited to: airframe structural analysis, flutter, wing fatigue and durability and damage tolerance analysis (DaDTA), vibration, gun blast and vibro-acoustics, which were completed by LM and eventually the computational fluid dynamic (CFD), also known as the drag analysis, that was completed by MERC to satisfy these requirements including the performance analysis to show that the addition of the IRSS system would not degrade the performance of the engines. However, the one analysis that was not accomplished was how the installation of the IRSS system would affect the actual mechanical operations of the engine. The Government has a contract in place to sustain the C-130 engines, and any modifications to the aircraft that could affect that normal operation has to be evaluated to determine the effects the modification would have on the engines. Engine installation affects have a large impact on engine performance such as increasing drag (which requires more thrust and higher throttle settings) and increased backpressure (which requires the engine to work harder to maintain power). These result in hotter running temperatures that may impact the life of critical engine parts. Previous studies have been completed on AC-130W aircraft modified with an IRSS system designed by Liberty Works and determined there was no impact on the engines when those suppressors were installed on the AC-130W. Data must now be analyzed for the W.R. Davis IRSS system to show what impacts potentially exist on the AC-130J engines.

2.0 Services Summary

Performance Objective
PWS Reference
Performance Threshold
Quality of Contract Data Requirements List (CDRL) deliverable
4.2.1
There shall be no more than one rejection of any deliverable. There shall be no more than two total rejections of deliverables per quarter. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within five business days of notification of Government rejection.
Receipt of CDRL deliverable
4.2.2
There shall be no more than one late submission of deliverables per quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

3.0 Government Property: Government property will not be provided.

4.0 Technical Requirements

4.1 Period and Place of Performance

4.1.1 Order Period of Performance: The period of performance for the order will extend 12 months.

4.1.2 Place of Performance: These services will be performed at Contractor’s facility in Warner Robins, GA.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier Base Year

DID
Title
PWS Reference(s)
A001
DI-MISC-80508B
Technical Report-Study/Services
4.3.1
A002
DI-MGMT-80368A
Status Report
4.3.2, 4.3.5
A003
DI-FNCL-80912A
Cost Report
4.3.3, 4.3.5
A004
DI-ADMN-81505
Report, Record of Meeting/Minutes
4.3.4
A005
DI-SAFT-81563
Accident/Incident Report
5.5.2

4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than two total rejections of deliverables per quarter. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within five business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area Workflow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than one late submission(s) of deliverables per quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Engineering Services

4.3.1 Structural Engineering Support and Reliability Engineering: The Contractor shall provide a Structural Engineering Support and Reliability Engineering Specialized Services report on the AC-130J IRSS. These services include analyzing the effects of the IRSS system, as designed and installed, on the AC-130J engines. The Contractor shall support any engine Test and Evaluation to complete study. Results shall be documented in final report. [CDRL A001, DI-MISC-80508B, Technical Report-Study/Services]

4.3.2 Status Reports: These reports shall include the engineering support provided by the Contractor. The Contractor shall document task status by milestone and schedule, contract issues and actions. In addition, all problem areas shall be covered, with recommended solutions and the outcome after solutions are implemented. Report to include any travel summaries. [CDRL A002, DI-MGMT-80368A, Status Report]

4.3.3 Cost Reports: These reports shall document manhours by labor category and task to include travel, any material costs by task, and the total contractual expenditures and funds remaining as of the reporting date for each contract line item. [CDRL A003, DI-FNCL-80912A, Cost Report]

4.3.4 Meeting Minutes: For any scheduled meeting or conference, the Contractor shall provide minutes unless directed otherwise in writing by the Government. [CDRL A004, DI-ADMN-81505, Report, Record of Meeting/Minutes]

4.3.5 Travel: The Contractor, in performing required engineering services, may be required to travel to other Government installations or to Contractor facilities to observe and conduct tests to furnish engineering guidance as required. Travel requests for Contractor/subcontractor personnel shall be submitted for approval to the Contracting Officer prior to costs being incurred and a minimum of five business days in advance of departure. The travel request shall include, as a minimum, the dates of travel, purpose, number of personnel traveling and estimated cost. All travel should adhere to the requirements of Federal Acquisition Regulation (FAR) 31.205-46, Travel Costs. Receipts must be presented with the invoice for reimbursement of actual travel costs. Trips, numbers, and types of personnel shall be limited to the minimum required to accomplish work requirements. The Contractor shall be responsible for arranging all Contractor personnel travel during the program effort. Summaries of trips and costs shall be included within monthly reports [CDRL A002, DI-MGMT-80368A, Status Report] [CDRL A003, DI-FNCL-80912A, Cost Report]

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Service Manager has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure Contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with the following security regulations: Department of Defense (DoD) 5200.2-R, Personnel Security Program; 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM); DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program, DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual, and Robins Air Force Base Integrated Defense Plan (RAFB IDP) 31-101.

5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and Department of Defense (DoD) Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, sub contracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.

5.2.3 Security Clearance: It is not expected that contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.4 Access to Government System(s): Access to Government system(s) will not be required to perform tasks under the order.

5.2.5 Access to Government Facility or Military Installation: The Contractor shall ensure contractor/subcontractor personnel who require access to a Government facility or military installation comply with the security requirements of the facility or installation.

5.3 Environmental Management System (EMS): Contractor/subcontractor personnel who perform work on any Government facility shall comply with the EMS requirements established by the facility. Contractor/subcontractor personnel may be required to complete EMS training prior to beginning work.

5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.

5.5 Safety Requirements

5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.1E, Environmental, Safety, and Occupational Health (ESOH).

5.5.2 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. In the event of a mishap, the Contractor shall ensure the USAF is notified of the mishap. The Contractor shall contact the organizations listed below within four business hours. The Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s Safety Office (AFLCMC/SE). Such release shall be accomplished through the Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 24 hours of the mishap. [CDRL A005, DI-SAFT-81563, Accident/Incident Report]

5.5.2.1. Procuring Contract Officer,

5.5.2.2. Multi-Functional Team (MFT) (Contracting Officer Representative, if available, or another MFT member),

5.5.2.3. The closest USAF base command post (to relay notification to AFLCMC/SE).

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.7 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria or reporting dollar threshold; therefore, SCR does not apply.

5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

5.10 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

6.0 Appendices

6.1 Appendix A, Reference(s)

Publication
Title of Publication
Date of Publication
Sections(s) that Apply
FAR 31.205
Contract Cost Principles and Procedures; Selected Costs
December 30, 2022
46 - Travel Costs
DoD 5200.2-R
Personnel Security Program
January 2, 1987
All
32 CFR Part 117
National Industrial Security Program Operating Manual (NISPOM).
February 24, 2021
All
DoDD 5205.02E
DoD Operations Security (OPSEC) Program
June 20, 2012
All
DoD Manual 5205.02-M
DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual
November 3, 2008
All
RAFB IDP 31-101
Robins Air Force Base Integrated Defense Plan
June 18, 2018
All
DoDD 4715.1E
Environment, Safety, and Occupational Health (ESOH)
March 19, 2005; Change 2, December 30, 2019
All
Public Law 91-596 as amended by Public Law 101-552
Occupational Safety and Health Act of 1970
December 29, 1970

as amended through January 1, 2004

All

PR: FD2060-23-31009 PWS REVISION: - 14

Distribution Statement: C

File details come from the government source that posted it. Updated .