Powerhouse Water Treatment- SOW.pdf

PDF 219 KB Posted

Attached to
WATER CHEMICAL TESTING AND CONSULTATION SERVICES - FCC BUTNER
Solicitation number
15B10626PR000399
Issued by

About this file

This is a Statement of Work for the Powerhouse Water Treatment Program at Federal Correctional Complex Butner, North Carolina. The Federal Bureau of Prisons intends to make a single award to provide all necessary materials, reagents, training, and support for conducting a comprehensive water treatment program in compliance with ADM/FAC 4200.12, CN-1 "Facilities Operations Manual" (September 21, 2023).

The contractor must develop and implement chemical treatment programs for multiple water systems including steam boilers, hot water boilers, cooling towers, and chilled/hot water systems. Boiler water treatment requires specific parameters: total hardness less than 0.5 PPM for water tube boilers and 1.0 PPM for fire tube boilers; residual phosphate between 30-60 PPM; pH maintained between 7.0-10.5; sodium sulfite residual between 30-50 PPM; and conductance blow-down limits between 2,500-4,000 microhms. Treatment chemicals for food service equipment must meet NSF-USDA classification G7. Cooling tower systems require biocide treatment and corrosion control excluding chromium, zinc, or heavy metals. Chilled and hot water systems require nitrate inhibitors with chromate use prohibited. The contractor must provide bi-weekly on-site visits, monthly reports to the Facility Manager by the 16th of each month, supply all testing materials quarterly, deliver 8 hours of annual training per staff member, maintain representative attendance at annual boiler inspections, and furnish all equipment including pumps, tanks, monitoring equipment, and spare parts. Work hours are 7:00 AM–3:00 PM Monday–Friday excluding weekends and federal holidays, with 48-hour advance written notice required for system disruptions. Security clearance documentation must be submitted 14 days before work commencement, and all contractor and subcontractor employees require institution-issued badges and must comply with facility security protocols, dress codes, and federal smoking policies.

View the file

Other files

File Type Posted
MRQ - Water Testing Services.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK/SPECIFICATIONS

FCC BUTNER

Powerhouse Water Treatment

I. SPECIFICATIONS:

A. INTRODUCTION

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution located at

FEDERAL CORRECTIONAL COMPLEX 1000

OLD NC HIGHWAY 75

BUTNER NC, 27509

Intends to make a single award to a responsible entity that will provide all necessary materials, reagents, training, and incidentals for Bureau staff and workers to conduct the Powerhouse Water Treatment Program in accordance with ADM/FAC 4200.12, CN-1 "Facilities Operations Manual" (September 21, 2023). All applicable Regulations, Codes, Policies, and Manufacturers' Recommendations will be required to be implemented.

B. SSCCOOPPE OF WWOORRKK

Treatment and Testing Boiler Water Treatment Steam and closed loop hot water boilers require a chemical treatment program to minimize scaling, corrosion, and carryover. The boiler water chemical treatment program must be developed by a certified testing agency as applicable to the specific system. Below are the Bureau of Prisons guidelines for steam boilers only. Any variances from these guidelines will be part of the comprehensive water treatment program that must be submitted post contract award, as outlined in this statement of work. Hot water boilers must have a separate treatment program. All treatment programs must be submitted for approval before implementation.

1. Total hardness of makeup water for water tube boilers must be less than 0.5 PPM and fire tube boilers less than

1.0 PPM.

2. Residual phosphate concentration of boiler water must be between 30 and 60 PPM.

3. Alkalinity must maintain a PH level between 7.0 and 10.5 for boiler water.

4. Sodium sulfite is to be used as an oxygen scavenger. The residual concentration of sodium sulfite is to be between 30 and 50 PPM. When the boiler is placed in wet lay-up, the sodium sulfite can be increased up to 100 PPM.

5. Chemical dispersant and synthetic polymers are to be added for sludge conditioning and precipitation.

6. Blow-down is to be performed to reduce the concentration of solids and prevent carryover. The limits of conductance must be between 2,500 and 4,000 microhms. In no case may the blow-down be carried to make concentration of solids less than 2,000 microhms. Automatic blow-down systems are recommended. If automatic blow-down systems are used, they must be calibrated annually and documented in Cl\1MS.

7. Neutralizing or filming agents are to be used to prevent corrosion of condensate return lines. A PH between 7.5 and 9 is to be maintained in all condensates return lines.

8. Treatment chemicals on systems feeding food service equipment must meet the requirements of National Sanitation Foundation (NSF-USDA) classification code G7.

Cooling Tower Water Treatment

The cooling tower water chemical treatment program must be developed by a certified testing agency and/or incorporate the following, as applicable to the specific system:

1. A biocide water treatment is to be used to prevent growth of algae and scaling

2. Blow-down is to be performed periodically to reduce the concentration of solids. Automatic blow-down systems are recommended.

3. Corrosion control methods must be implemented; however, chromium, zinc, or other heavy metals may not be used.

Chilled and Hot Water Systems Water Treatment

1. Nitrate water treatment is to be used as an inhibitor to control both corrosion and scale deposits. Use of chromates is prohibited.

2. Closed-loop systems will be tested at least monthly and more frequently based upon a weekly review of makeup water to that system.

Consulting Services

Upon award, vendor must provide, in writing, a comprehensive water treatment program that addresses all systems; boilers, chillers, cooling towers, closed loops, and any other system utilizing water as a heat transfer medium. These services are to include:

1. Instructions for operation of all treatment equipment,

2. Fully outlined testing procedures including frequencies and basic corrective actions when outside of perimeters,

3. Supply and delivery of all materials needed to conduct testing for the duration of the contract, delivered on a quarterly basis,

4. Bi-weekly visits to observe and complete an on-site analysis,

5. A monthly report outlining any discrepancies and recommended corrective action.

6. Provide a minimum of 8 hours of training for each staff member working on systems requiring water treatment per calendar year.

7. Have representative on site for the annual boiler inspections to view boiler internals and make recommendations on any adverse conditions.

All monthly reports will be provided to the Facility Manager no later than the 16th of each month. Any deficiencies and/or corrective actions must be clearly outlined in the monthly report. It shall be clearly defined in the monthly report if the corrective action was taken by the consultant or if action is needed from the BOP staff.

Equipment

The contractor will provide all necessary equipment for chemical feeds. This will include pumps, tanks, overflow pallets, and monitoring equipment. The use of monitoring equipment that can report directly to our Building Automation System. The equipment for reporting to the BAS will have to be reviewed by FBOP Information Technology Department to connect to our network. The contractor must keep spare pumps on site. This includes chemicals for treatment. The contractor will supply all necessary testing supplies and FBOP will provide storage and work area.

System Inventory

1. Boilers

a. FMC Powerhouse

i. (3) Cleaver Brooks High Pressure Steam Model

CB200700150

ii. Feedwater and Condensate tanks

b. FCI 2 Powerhouse

i. (1) Cleavor Brooks Heating Water Model

FLX-200-1100-160-HW

ii. (2) heat exchangers feed from FMC boilers

c. LSCI Powerhouse

i. (3) Hurst Heating Water Model

d. FCI 2 Food Service

i. (1) Bryan High Pressure Steam Model AB90-5-150-F06

e. FPC Food Service

i. (1) Columbia Steam Model

2. Chillers

a. FMC Powerhouse

i. (4) Trane Centrifugal Model CVHF910

b. FCI 2 Powerhouse

i. (2) Trane Centrifugal Model CVHF485

c. LSCI Powerhouse

i. (2) Trane Model CVHF570

ii. (1) York Model YDTL131 (Not in use)

3. Cooling Tower

a. FMC Powerhouse

i. (4) Marley

b. FCI 2 Powerhouse

i. (2) Baltimore Aircoil Company

c. LSCI Powerhouse

i. (3) Marley Common Sump

C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS

All installers/technicians shall be qualified and certified by the manufacturer to install test. Such certification must be verified in writing by the manufacturer and submitted to the COR.

All seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-ABA, and Federal, State and Local codes and regulations will be considered.

Services and materials provided by the contractor will adhere to and shall be consistent with the most current industry standards, the Underwriters Laboratories (UL) and the General and the National Electric Code (NEC).

It is the contractor's responsibility to obtain permitting, should it be required. Copies of all permits must be submitted to the COR upon receipt from local agency.

These parts shall be currently manufactured and available through authorized dealers. Such certification must be verified in writing thru submittals by the manufacturer and submitted to the COR on a timely basis.

D. UTILITIES

The FBOP will provide water, use of restrooms and minimal electricity service (120V) for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed.

E. TESTING AND ACCEPTANCE

The Contractor shall put together a water treatment program as referenced in consulting services section.

F. HOUSEKEEPING AND MATERIAL DISPOSAL

The contractor awarded the contract will be responsible for ensuring the premises are kept clean and free from accumulations of waste materials and rubbish at all times. The contractor will remove all debris, scrap, and rubbish from the work area daily. Surplus materials and all equipment shall be promptly removed from the site upon completion of the work. The Contractor shall be responsible to remove all debris and waste materials from the job site at FCC Butner upon conclusion and acceptance of the project.

These items must be disposed of in accordance with all Federal, State, and local laws. The Contractor is also responsible to conduct all structural repairs, patch walls, paint, repair ceiling etc., associated with the upgrade.

G. SUBMITTALS & TRAINING

Submittals:

1. The contractor shall provide written submittals to the COR describing recommended equipment within (15) days from receiving the Notice to proceed for approval.

2. All security clearance paperwork/documentation shall be submitted to the COR a minimum of {14) working day prior to the start of work (see below).

3. The Contractor shall provide to the COR three (3) copies of the Safety Data Sheets (SDS) on all materials and substances that may be used during the course of the project. In the event the material is not approved by the Safety Manager, it shall be the responsibility of the Contractor to locate and procure an alternative product.

4. For security and safety purposes, forty-eight (48) hour advance notice in writing, prior to disruption to the system must be given to the Contracting Officer and COR.

5. Provide complete narrative descriptions of all system operations.

6. Contractor will provide 8 hours of training for staff and will schedule with the COR to ensure all staff receive training.

7. Any deviations from this Statement of Work will be considered a Change Order Request and must be authorized through the institution's Contracting Officer prior to the implementation of the requested change.

8. It is the Contractor's responsibility to repair and/or replace any Government property damaged by contractors/subcontractors’ employees. Damage will be corrected and restored to previous conditions at no cost to the Government.

9. It shall be the Contractor's responsibility for obtaining all measurements and data requirements to comply with manufacturer's installation recommendations. All installations must be in accordance with product manufacture's recommendations.

II. CONTRACTOR SECURITY/WORKING REGULATIONS

A. Work Hours:

Work Hours for the contractor are 7:00 AM - 3:00 PM, Monday - Friday, excluding weekends and federal holidays.

Any work required to be completed at any other time than noted above must be requested in writing to the COR five

(5) working days prior to the start of the work. In the event of any equipment being replaced that would result in downtime of the normal orderly running of the institution, alternate work hours may be authorized in accordance with the time frame stated above.

Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight-hour workday. The Government assumes no responsibility to the Contractor nor to any of his subcontractors for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines.

Contractors should plan for a minimal amount of time accrued for security considerations, i.e., check-in screening, delay due to inmate movements, institution lock-down, institution emergencies, etc. In the event of an institutional emergency, the Contractor will be instructed to secure all work, secure and stow all tools, equipment and materials, and the Contractor will be escorted out of the institution. Work will resume once the institution emergency passes.

B. Delivery of Materials:

All materials/equipment required for work on this project are required to be processed by the Contractor and coordinated with the institution COR for storage. Any related deliveries which are directly shipped to the contractor can be received between the hours of 7:00 a.m. to 12:00 p.m., Monday through Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor or his representative is not present to verify and accept the delivery.

Under no circumstances will FBOP Butner or its staff be responsible for the acceptance of any Contractor or company deliveries.

The contractor shall be responsible for providing their own means of loading and unloading contractor material or equipment.

The contractor shall not use the institution entry/driveway for the loading, unloading, or storage of any materials and equipment. The contractor will not impede/block the driveway at any time during or after the work shift.

C. Storage of Materials and Equipment:

All materials/tools shall be stored in a designated area mutually agreed upon between the COR and the contractor. The storage area will be a secure lockable gang box or similar size to be determined by the contractor and the COR. If required, the contractor shall provide a securable, single point access storage container, such as a Job or Gang Box that will be left in the agreed upon storage area for the duration of the project. Size of the storage container will be determined by the contractor and the COR. The container will be secured using a padlock protocol with two locks to secure it. One shall be a contractor lock and the other lock provided by the institution. If necessary, a heavy-duty chain provided by the contractor may be used to facilitate the locking requirement. All materials and equipment stored within the container will be maintained in a safe and orderly fashion

Materials cannot be stored at a height that would create a fall hazard.

All tools will be inventoried prior to entering the Institution at the start of each workday on a daily tool inventory sheet.

At the end of the workday, all tools will be inventoried again to ensure all tools are accounted for.

All contractor-owned extension cords that will be used during the project, regardless of length, shall be in good condition with no broken outer Insulation. Extension cords are considered a ''high risk" tool having a Federal Bureau of Prisons' tool classification of Double A. All contractors-owned extension cords used for this project will be required to exit the institution at the end of every workday for the duration of the project.

All contractor-owned ladders approved for use within the institution, regardless of the size, shall be stored in a pre-determined area and secured to a stationary fixture with a heavy link chain and lock which would prevent removal.

D. Security Clearance/Contractor Badges:

The contractor shall provide the COR with all the necessary security clearance documents for all contractors and subcontractor employees accessing the institution and be security cleared for badging within 14 days of receiving the Notice to Proceed, as stated above. Security clearance documents will only be accepted from the prime contractor. If submitted by a sub-contractor, they will be rejected. It is the prime contractor's responsibility to review security clearance submissions to ensure they are complete.

In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor's responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the nature of why a contractor or subcontractor employee was not able to pass the security clearance process.

All contractors/subcontractors working at FCC Butner will be issued and required to wear a picture ID/contractor badge provided by the institution. For security reasons, the badge will be worn in a visible manner as directed by the COR.

E. Safety and Personal Protective Equipment:

1. All contractors and employees shall have and wear the required personal protective equipment (PPE) prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide all PPE equipment. Contractors are required to wear Safety Toe footwear (composite, aluminum or steel toe are acceptable.) while performing on site contract work. Safety footwear must comply with current ASTM standards, which outlines the performance requirements for protective footwear. If the Contractor determines that on site hazards warrant the use of Internal or External Metatarsal guards, they may require the equipment be worn by their employees. The Contractor alone is responsible for ensuring the employee is wearing the proper PPE before beginning the workday.

All ladders regardless of the size shall be stored and secured to a stationary fixture with a chain and lock in a predetermined area, in a way that they cannot be removed. If ladders are required, immediately consult with the COR to ensure that he or she can make timely notifications to appropriate institution staff. All extension cords regardless of length shall be in good condition with no broken outer insulation and will be secured in a locked construction gang box. Should a system require Lock-out/Tag-out, the system will be required to have both Contractor and FCC Butner locks on the isolation point to prevent shock. All Lock-out/Tag-out procedures will be compliant with the institution Lock-out program.

F. Additional Considerations:

1. Contractors will NOT be allowed to bring cell phones, cameras or two-way pagers into FCC Butner. The Facilities Department maintains a digital camera that will be utilized by BOP staff to document the project work. The Contractor may request copies of these documentation photos for record keeping.

2. Contractors will be permitted to wear jeans in the institution, however, shorts, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services that are being provided.

3. Lunches will be consumed at the worksite. Contractors shall ensure they have everything they need for their lunch when they check-in first thing in the morning.

4. Federal smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced.

STATEMENT OF WORK/SPECIFICATIONS FCC BUTNER
I. SPECIFICATIONS:
Treatment and Testing Boiler Water Treatment
Cooling Tower Water Treatment
Chilled and Hot Water Systems Water Treatment
Consulting Services
Equipment
System Inventory
C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS
D. UTILITIES
E. TESTING AND ACCEPTANCE
II. CONTRACTOR SECURITY/WORKING REGULATIONS
A. Work Hours:
C. Storage of Materials and Equipment:
D. Security Clearance/Contractor Badges:
F. Additional Considerations:

File details come from the government source that posted it. Updated .