This is an Advertisement for Bids issued by the Board of Education for Hazel Park Schools in Michigan on March 29, 2019. The solicitation encompasses four general construction projects: toilet room remodeling at Hazel Park High School (Project 18033), electrical panel replacement at Hazel Park High School (Project 19027), time out room remodeling at Hazel Park Junior High School (Project 19028), and window flashing upgrades at United Oaks Elementary School (Project 19031). Sealed bid proposals will be received until 10:30 p.m. on April 29, 2019, at the Board of Education office located at 1620 E. Elza, Hazel Park, Michigan 48030, with attention to Jason Zirnis, Assistant Superintendent of Business and Operations. Bidding documents will be available for examination and distribution on or after April 8, 2019, at the Office of the Architect (TMP Architecture, Inc., 1191 West Square Lake Road, Bloomfield Hills, Michigan 48302) or the Construction Association of Michigan in Bloomfield Hills. Qualified bidders may obtain one set of drawings and specifications from the architect and must return bidding documents within ten days after bid opening in complete, clean, and reusable condition.
Each bid proposal must be submitted on forms furnished by the architect and accompanied by a satisfactory bid bond or certified check equal to five percent of the base bid sum. Bidders must include a sworn and notarized statement disclosing any familial relationships with school board members, superintendents, or chief executives, as well as an Iran Economic Sanctions Act Compliance Form; bids lacking either document will not be accepted. Bidders agree not to withdraw their proposals for sixty days following the bid receipt date. The successful bidder will be required to furnish satisfactory performance bonds and labor and material payment bonds in accordance with the Instructions to Bidders. The Owner reserves the right to reject any or all bid proposals in whole or in part, or to waive any informalities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 001113
ADVERTISEMENT
FOR BIDS
03/29/19 ISSUED FOR BIDS TMP18033, 19027, 19028, 19031
001113-1
ADVERTISEMENT FOR BIDS
The Board of Education will receive sealed bids for:
GENERAL CONSTRUCTION OF
HAZEL PARK H.S. TOILET ROOM REMODELING (18033)
HAZEL PARK H.S. ELECTRICAL PANEL REPLACEMENT (19027)
HAZEL PARK JUNIOR H.S. TIME OUT ROOM REMODELING (19028)
UNITED OAKS E.S. WINDOW FLASHING UPGRADES (19031)
Bid Proposals will be received until the time and the place, as follows, where and when the opening of bid proposals will be conducted by the Owner in public:
Date: April 29, 2019
Time: 10:30 p.m.
Place: Board of Education Hazel Park Schools 1620 E. Elza Hazel Park, MI 48030
Attn: Jason Zirnis, Assistant Superintendent of Business and Operations
Bidding Documents will be available for examination and distribution on or after April 8, 2019.
Examination may be made at the Office of the Architect, TMP ARCHITECTURE, INC., 1191 West Square Lake Road, Bloomfield Hills, Michigan 48302; or the CONSTRUCTION ASSOCIATION OF MICHIGAN, Bloomfield Hills, Michigan.
Qualified Bidders may obtain bidding documents from the Office of the Architect, consisting of one (1) set of Drawings and Specifications.
Return Bidding Documents to the Architect within ten (10) days after opening receipt of proposals.
Documents are to be complete, in clean and reusable condition and free of marks or other defacement.
A sworn and notarized statement disclosing any familial relationship existing between the bidder and any member of the school board, school superintendents, or chief executive must accompany each bid. The Iran Economic Sanctions Act Compliance Form must be included as well. A board shall not accept a bid that does not include both of these statements, which are included on the proposal execution form.
Bid Proposals shall be on forms furnished by the Architect, accompanied by a satisfactory Bid Bond or Certified Check for five percent (5%) of the Base Bid Sum maximum possible proposal amount.
Bidder shall agree not to withdraw Bid Proposal for a period of sixty (60) days after date for receipt of bids.
Accepted Bidder shall be required to furnish satisfactory Performance Bond and Labor and Material Payment Bond in accordance with the Instructions to Bidders.
The right to reject any or all Bid Proposals, either in whole or in part, or to waive any informalities therein is reserved by the Owner.
**END OF SECTION**