This document is an Addendum to a Solicitation for the FY 25 Utility Cut Concrete Repair project in North Carolina for Buncombe County and Asheville City. The Addendum clarifies the bid item units and includes a revised bid schedule. The project involves the repair of concrete infrastructure damaged by utility installations, including items such as mobilization, traffic control, sidewalk and curb and gutter work, and material replacement. The quantities for these line items are provided. This Addendum is part of the overall contract opportunity, which has a project number of 298-Utility-FY25.
The revised bid schedule includes unit pricing for the various repair items. The contract will be awarded to the successful bidder, though the document does not specify the award date or contract term. No information is provided on any set-asides, incumbents, funding sources, or other salient pricing or contractual details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ad Request for bids.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1 Issue Date: 8/12/24
Project Name: FY 25 Utility Cut Concrete Repair Project Number: 298-Utility-FY25
TO: Prospective Bidders:
This addendum forms a part of the Advertisement for Bids and modifies the original Project Number 298-Utility-FY25 only to the extent specifically noted below. Failure to acknowledge this addendum in the submittal may subject the submitter to being deemed non-responsive.
This Addendum consists of 3 pages in total.
Clarifications:
1. The bid item units have been clarified and a revised bid schedule is attached to this addendum.
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.
Authorized Signature Company Date
- End -
Line Description Quantity Units Price Total
Mobilization Per Work
Order 75 EA.
Mobilization Per Work
Order (Night) 1 EA.
Traffic Control
Flagmen 25 Per Man Hour
Traffic Control Lane
Closure 75 EA.
5 Seeding and Mulching 1,400 S.F.
6 Monolithic Sidewalk 75 S.Y.
6” Concrete Drive
Apron 125 SY.
8 4” Concrete Sidewalk 125 S.Y.
9 ADA Ramp 2 EA.
Install 2’ x 2’ Detectable Warning -
Labor Only 5 EA.
Install Brick Pavers -
Reuse Brick 15 S.F.
Install Brick Pavers -
New Brick 15 S.F.
13 2’6” Curb and Gutter 50 L.F.
14 2’0” Curb and Gutter 50 L.F.
15 1’6” Curb and Gutter 10 L.F.
Stand Up Curb 12” x
8” 175 L.F.
Stand Up Curb 12” x
6” 50 L.F.
18 Concrete Valley Curb 20 L.F.
Line Description Quantity Units Price Total
19 Mountable Curb 5 L.F.
4” Scored Concrete
Sidewalk 5 S.Y.
Adjust/Install Granite
Curb - Labor Only 15 L.F.
Adjust Valve Box
(Major) - Labor Only 3 EA.
Adjust Valve Box
(Minor) - Labor Only 8 EA.
24 ABC 5 Tons
Asphalt Pavement
Repair 5 Tons
26 Incidental Stone Base 5 Tons
Total: