Pool_Timing_System_Layout.pdf

PDF 2 MB Posted

Attached to
Swimming Pool Competition Equipment, Anchors, and Deck Improvements (Starting Block & Backstroke Flagpole Anchor Installation)
Solicitation number
2026-26
Issued by
Miami-Dade County, Florida

About this file

This file is a technical layout diagram for a pool timing system at the Doral Aquatic Center in Florida, created by John Williams. The diagram illustrates the placement of timing infrastructure components across multiple deck nodes, including a Start Deck (Node 2), Bulkhead Deck (Node 3), and Timing Deck (Node D). The layout specifies the installation of fourteen 4"x4"x6" PVC boxes at various locations, with three existing boxes shown in gray that can remain in place, and fifteen additional 4"x4"x6" PVC boxes with four existing locations available for reuse. The diagram also details 2" PVC conduit routing throughout the system to connect the timing components across the pool facility.

This technical specification supports the City of Doral's Swimming Pool Competition Equipment project, which involves the installation of twenty-one starting block anchors and two backstroke flagpole anchors at the Doral Aquatic Center. The timing system infrastructure depicted in this layout enables the operation of competitive swimming equipment and appears to be part of the broader deck improvements and equipment installation work outlined in the contract opportunity, with project completion expected within one hundred eighty calendar days from the Notice to Proceed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

john.williams PolyLine john.williams PolyLine john.williams Line john.williams Text Box john.williams Ellipse john.williams

START DECK NODE

john.williams

BULKHEAD DECK NODE

john.williams

BULKHEAD DECK NODE

john.williams

BULKHEAD DECK NODE

john.williams

START DECK NODE

john.williams

START DECK NODE

john.williams

START DECK NODE

john.williams

START DECK NODE

john.williams

START DECK NODE

john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams

TIMING DECK NODE

D john.williams Callout 4"x4"x6" PVC box (14) places. 3 existing locations can remain shown in gray john.williams Callout Existing locations john.williams Callout 4"x4"x6" PVC box (15) places. 4 existing locations can remain shown in gray john.williams Callout Existing locations john.williams Callout 2" PVC conduit john.williams Callout 2" PVC conduit

File details come from the government source that posted it. Updated .