PNQS 25-3212 Renovate Interior Bldg 693 - AF 3052.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- PNQS 25-3212 Renovate Interior Building 693
- Solicitation number
- FA330025R0032
About this file
This file contains a blank construction cost estimate spreadsheet for a renovation project at Maxwell Air Force Base. The solicitation (FA330025R0032) is for renovating the interior of Building 693, and is structured as a competitive Total Small Business Set Aside firm-fixed-price contract. Key details include a mandatory site visit scheduled for 31 July 2025 at 9:00 AM CDT, with attendee names required to be submitted by 25 August 2025. All pertinent questions must be submitted by email by 5 August 2025, and the proposal submission deadline is 15 August 2025 at 12:00 PM CDT.
The project involves interior renovation work, specifically including tasks such as removing wallpaper, preparing walls, removing and replacing rubber cove base, priming and painting walls, and refinishing interior doors. The renovation is for the LeMay Center at Maxwell Air Force Base in Alabama. Although the cost estimate spreadsheet is currently blank with no dollar amounts filled in, it provides a structured breakdown of potential construction costs across multiple divisions, including material, labor, tax, insurance, overhead, and profit calculations. The contracting officer has determined there is a high probability of adequate price competition for this acquisition.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Renovate Interior, LeMay Center | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Building 693 | PNQS 24-2986 | Maxwell | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MD | $0.00 | $0.00 | $0.00 | ||||
| Remove wallpaper | Lot | $0.00 | ||||||
| DIVISION 2 (Site Work) | ||||||||
| DIVISION 3 (CONCRETE | ||||||||
| DIVISION 4 (MASONRY) | ||||||||
| DIVISION 5 (METAL) | ||||||||
| DIVISION 6 (WOOD AND PLASTICS) | ||||||||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | ||||||||
| DIVISION 8 (DOORS AND WINDOWS) | ||||||||
| DIVISION 9 (FINISHES) | $0.00 | $0.00 | ||||||
| Prepare Walls | SF | $0.00 | $0.00 | $0.00 | ||||
| Remove and Replace Rubber cove base | LF | $0.00 | $0.00 | $0.00 | ||||
| Prime and Paint Walls (2 Coats) | SF | $0.00 | $0.00 | $0.00 | ||||
| Refinish Interior Doors | EA | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 10 (SPECIALTIES) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 11 (EQUIPMENT) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 12 (FURNISHINGS) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 15 (MECHANICAL) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| Material Costs | $0.00 | $0.00 | ||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Labor Cost | $0.00 | $0.00 | ||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________
File details come from the government source that posted it. Updated .