This file contains a blank construction cost estimate spreadsheet for a renovation project at Maxwell Air Force Base. The solicitation (FA330025R0032) is for renovating the interior of Building 693, and is structured as a competitive Total Small Business Set Aside firm-fixed-price contract. Key details include a mandatory site visit scheduled for 31 July 2025 at 9:00 AM CDT, with attendee names required to be submitted by 25 August 2025. All pertinent questions must be submitted by email by 5 August 2025, and the proposal submission deadline is 15 August 2025 at 12:00 PM CDT.

The project involves interior renovation work, specifically including tasks such as removing wallpaper, preparing walls, removing and replacing rubber cove base, priming and painting walls, and refinishing interior doors. The renovation is for the LeMay Center at Maxwell Air Force Base in Alabama. Although the cost estimate spreadsheet is currently blank with no dollar amounts filled in, it provides a structured breakdown of potential construction costs across multiple divisions, including material, labor, tax, insurance, overhead, and profit calculations. The contracting officer has determined there is a high probability of adequate price competition for this acquisition.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Renovate Interior, LeMay Center$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Building 693PNQS 24-2986Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMD$0.00$0.00$0.00
Remove wallpaperLot$0.00
DIVISION 2 (Site Work)
DIVISION 3 (CONCRETE
DIVISION 4 (MASONRY)
DIVISION 5 (METAL)
DIVISION 6 (WOOD AND PLASTICS)
DIVISION 7 (THERMAL AND MOISTURE PROTECTION)
DIVISION 8 (DOORS AND WINDOWS)
DIVISION 9 (FINISHES)$0.00$0.00
Prepare WallsSF$0.00$0.00$0.00
Remove and Replace Rubber cove baseLF$0.00$0.00$0.00
Prime and Paint Walls (2 Coats)SF$0.00$0.00$0.00
Refinish Interior DoorsEA$0.00$0.00$0.00
DIVISION 10 (SPECIALTIES)$0.00$0.00$0.00
DIVISION 11 (EQUIPMENT)$0.00$0.00$0.00
DIVISION 12 (FURNISHINGS)$0.00$0.00$0.00
DIVISION 13 (SPECIAL CONSTRUCTION)$0.00$0.00$0.00
DIVISION 14 (CONVEYING SYSTEMS)$0.00$0.00$0.00
DIVISION 15 (MECHANICAL)$0.00$0.00$0.00
DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________