PNQS 23-5080 Replace CRAC Unit B1405 - AF3052.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Building 1405 Repair CRAC - Amendment 1
- Solicitation number
- FA330024R0058
About this file
This document is a cost estimate breakdown for a federal contract opportunity to replace a CRAC (Computer Room Air Conditioning) unit in Building 1405 at Maxwell Air Force Base in Alabama. The total proposed contract price is $0. The work is to be a firm-fixed-priced contract set aside for small businesses. A site visit is scheduled for September 5, 2024, and proposals are due by September 12, 2024. The contract will be awarded by the Department of the Air Force Air Education and Training Command. The cost estimate details the materials, labor, and other direct costs for the project, including HVAC components, electrical work, and controls updates. The document does not include a Performance Work Statement or Statement of Objectives, but rather a detailed cost breakdown for the replacement of the CRAC unit.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFHRA CRAC UNIT
CONSTRUCTION COST ESTIMATE BREAKDOWN
| WO 12967637 | ADDRESS | 400 Cannon Street | ||||||||
| Maxwell Air Force Base Alabama | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Replace CRAC Unit AFHRA MAFB BLDG 1405 | $0.00 | |||||||||
| PROJECT NUMBER/WORK ORDER | WORK LOCATION | |||||||||
| PNQS 23-5080 | AFHRA Bldg 1405 MAFB | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | UNIT | TOTAL | Manhours | RATE | TOTAL | COSTS | TOTAL |
| Division 1 (General Requirements) | $0.00 | ||||
| 1.0 | |||||
| 2.0 | PROJECT MANAGER | WK | $0 | ||
| 3.0 | SUPERINTENDENT | WK | $0 | ||
| 4.0 | $0 | ||||
| 5.0 | Field labor, daily cleanup | wk | $0 | ||
| 6.0 | $0 | ||||
| 7.0 | Project sign | ea | $0 | ||
| 8.0 | $0 | ||||
| 9.0 | PORT-A-LET (1) | MO | $0 | ||
| 10.0 | Dumpster | dumps | $0 | ||
| 11.0 | $0 | ||||
| 12.0 | $0 | ||||
| 13.0 | $0 | ||||
| 14.0 | $0 | ||||
| DIVISION 1 TOTAL, MATERIAL & LABOR | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| Division 2 thru 06 NOT USED | $0.00 | $0.00 | $0.00 |
DIvision 07 FIRESTOPPING
| 1.0 | Fire caulk pipe openings in walls. | Lot | 1.0 | $0.00 | $0.00 | ||
| 2.0 | Touchup painting | Lot | 1.0 | $0.00 | $0 | ||
| $0 | OH&P added to total | 0.0 |
| $0 | ||||
| $0.00 | $0.00 | $0.00 | $0 | |
| Division 08 thu 22 NOT USED | $0.00 | $0.00 | $0 |
| Division 23 (HVAC) | $0.00 | $0.00 | $0.00 | $0 | ||||||||||
| 1.0 | REFRIGERANT PIPING (Incl Insulation) | Lot | $0 | |||||||||||
| 2.0 | 3/4" COPPER (INCL FIBERGLASS PIPE INSUL.) | LF | $0.00 | $0 | ||||||||||
| 3.0 | TEE | EA | $0.00 | $0 | ||||||||||
| 4.0 | ELL | EA | $0.00 | $0 | ||||||||||
| 5.0 | BALL VALVE | EA | $0.00 | $0 | ||||||||||
| 6.0 | $0 | |||||||||||||
| 7.0 | RENTAL PKGD COOLING FOR RM 144 | MO | $0 | |||||||||||
| 8.0 | $0 | |||||||||||||
| 9.0 | 15 TON AIR COOLED CRAC UNIT | EA | 1 | $0.00 | $0 | |||||||||
| 10.0 | MODIFY RAISED FLOOR | LOT | 1 | $0.00 | $0 | |||||||||
| 11.0 | ||||||||||||||
| 12.0 | $0 | |||||||||||||
| 13.0 | $0 | |||||||||||||
| 14.0 | $0 | |||||||||||||
| 15.0 | $0 | |||||||||||||
| 16.0 | ||||||||||||||
| 17.0 | ||||||||||||||
| 18.0 | TEST & BALANCE SUBCONTRACTOR (INCLUDES OH&P) | |||||||||||||
| 19.0 | $0 | |||||||||||||
| 20.0 | TAB CRAC UNIT | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | |||||||
| 21.0 | $0 | |||||||||||||
| 22.0 | $0 | |||||||||||||
| 23.0 | $0 | |||||||||||||
| 24.0 | $0 | 0.0 | ||||||||||||
| 25.0 | SUBTOTAL TAB | $0.00 | ||||||||||||
| 26.0 | ||||||||||||||
| 27.0 | CONTROLS SUBCONTRACTOR (INCLUDES OH&P) | $0.00 | $0.00 | $0 | ||||||||||
| 28.0 | UPDATE GRAPHICS, REPLACE JACE, REPLACE CABLE | LS | 3 | $0.00 | $0.00 | $0 | ||||||||
| 29.0 | INTERFACE WITH CRAC CONTROLLER | LS | 1 | $0.00 | $0.00 | $0 | ||||||||
| 30.0 | ||||||||||||||
| 31.0 | $0 | |||||||||||||
| 32.0 | $0 | |||||||||||||
| 33.0 | $0 | 0.0 | ||||||||||||
| 34.0 | SUBTOTAL CONTROLS | $0.00 | ||||||||||||
| 35.0 | ||||||||||||||
| 36.0 | SUBTOTAL, MECHANICAL | $0.00 | OH | 0.0 | base + oh | 0.0 | ||||||||
| 37.0 | OH&P, SUB | LS | 1 | 0.00 | $0 | Profit | 0.0 | 0.0 | ||||||
| 38.0 | TOTAL, MECHANICAL WITH OH&P | $0.00 | ||||||||||||
| 39.0 | ||||||||||||||
| 40.0 | ||||||||||||||
| 41.0 | $0.00 | $0.00 | $0.00 | $0 | ||||||||||
| 42.0 | Division 26 (Electrical) | $0.00 | $0.00 | $0.00 | $0 | |||||||||
| 43.0 | $0 | |||||||||||||
| 44.0 | Electrical Subcontractor with OH&P | LS | 1.0 | $0.00 | $0.00 | $0 | ||||||||
| 45.0 | Fire Alarm Panel Programming with OH&P | LS | 1.0 | $0.00 | $0.00 | $0 | ||||||||
| 46.0 | Electrical Design | LS | 1.0 | $0 | ||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0 | ||||||||||
| $0.00 | $0 | |||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||
| 1.0 | Material Costs | $0.00 | $0 | |||||||||||
| 2.0 | Tax on Materials | 10% | $0.00 | $0 | ||||||||||
| 3.0 | TOTAL MATERIAL COST | $0.00 | $0 | |||||||||||
| 4.0 | $0.00 | $0.00 | $0 | |||||||||||
| 5.0 | Labor Cost | $0.00 | $0 | |||||||||||
| 6.0 | Insurance & Tax on Labor | $0.00 | $0 | |||||||||||
| 7.0 | TOTAL LABOR COST | $0.00 | $0 | |||||||||||
| 8.0 | $0.00 | $0.00 | $0 | |||||||||||
| 9.0 | Total Other Direct Costs | $0.00 | $0.00 | $0 | ||||||||||
| 10.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0 | |||||||||||
| 11.0 | ||||||||||||||
| 12.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0 | ||||||||||
| 13.0 | $0.00 | $0.00 | $0 | |||||||||||
| 14.0 | Overhead | $0.00 | $0.00 | $0 | ||||||||||
| 15.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0 | |||||||||
| 16.0 | Profit | $0.00 | $0.00 | $0 | ||||||||||
| 17.0 | Sub Total | $0.00 | $0 | |||||||||||
| 18.0 | TOTAL | $0.00 | $0.00 | $0 | ||||||||||
| 19.0 | Bonds | $0 | ||||||||||||
| 20.0 | TOTAL | $0.00 | $0.00 | $0 | ||||||||||
| $0.00 | $0.00 |
| John Worthington | 12/7/23 |
| Signature: |