PNQS 20-0697 RENOVATE DORM BLDG 697 - Draft Specs.pdf
PDF 4 MB Posted
- Solicitation number
- PNQS200697
About this file
This document is a draft project manual for the renovation of Permanent Party Dorm Building 697 at Maxwell Air Force Base in Montgomery, Alabama. The project involves the following key tasks:
Removing all furniture and equipment from the building and delivering them to locations on Maxwell AFB and/or Gunter Annex as directed. Demolishing interior finishes, partitions, doors and frames, HVAC, plumbing, electrical, telecommunications, and fire protection systems. Constructing new interior partitions, doors and frames, and finishes for ceilings, walls, and flooring. Installing new building systems including HVAC, plumbing, electrical, telecommunications, and a fully automatic, monitored fire sprinkler system and fire alarm. The project also includes site work for a new fire sprinkler supply line, domestic water line, and sanitary line.
The project is assigned number PNQS 20-0697 and has a 360 calendar day period of performance starting on September 1, 2023 and ending on March 31, 2024. The project is being procured by the Department of the Air Force Air Education and Training Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PNQS 20-0697 RENOVATE DORM BLDG 697 Draft DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A PROJECT MANUAL FOR
A & E DESIGN
RENOVATE PERMANENT PARTY
DORM BUILDING 697
MAXWELL AIR FORCE BASE
MONTGOMERY, ALABAMA
AUGUST 10, 2023
PROJECT NUMBER PNQS 20-0697
PHJA/2305US
RTA SUBMITTAL
This Sheet Intentionally Left Blank
PHJA/2308SC
PH&J Architects, Inc. - All rights reserved Page ABB-1
LIST OF ABBREVIATIONS
REFERENCED STANDARDS AND AGENCIES
AA ALUMINUM ASSOCIATION
AASHTO AMERICAN ASSOCOCIATION STATE HIGHWAY &
TRANSPORTATION OFFICIALS
AABC ASSOCIATED AIR BALANCE COUNCIL
ABC ALABAMA BUILDING COMMISSION
ACI AMERICAN CONCRETE INSTITUTE
ACIL AMERICAN COUNCIL OF INDEPENDENT LABORATORIES
ACPA AMERICAN CONCRETE PIPE ASSOCIATION
ACRMA AIR CONDITIONING AND REFRIG.MACHINERY ASSOC.
ADC AIR DIFFUSION COUNCIL
ADEM ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
AGA AMERICAN GAS ASSSOCIATION
AGC ASSOC. GEN. CONTRACTORS OF AMER.; ALABAMA GAS
CORP.
AHA AMERICAN HARDBOARD ASSOCIATION
AHD ALABAMA HIGHWAY DEPARTMENT
AIA ALABAMA INSTITUTE OF ARCHITECTS
AIA AMERICAN INSURANCE ASSOCIATION
AIA ASBESTOS INFORMATION ASSOCIATION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
ALDOT ALABAMA DEPARTMENT OF TRANSPORTATION
AMMA AMERICAN METAL MANUFACTURERS ASSOCIATION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
APC ALABAMA POWER COMPANY
ARI AIR CONDITIONERS AND REFRIGERATION INSTITUTE
ASA AMERICAN STANDARDS ASSOCIATION
ASHRAE AMER. SOC. HEATING, REFRIG. & AC ENGINEERS
ASLA AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AT&T AMERICAN TELEPHONE & TELEGRAPH COMPANY
AWCI ASSOCIATION OF WALL AND CEILING INDUSTRIES
AWI ARCHITECTURAL WOODWORK INSTITUTE
AWMA ALUMINUM WINDOW MANUFACTURERS ASSOCIATION
AWPA AMERICAN WOOD PROTECTION ASSOCIATION
AWWA AMERICAN WATER WORKS ASSOCIATION
AWS AMERICAN WELDING SOCIETY
BIA BRICK INSTITUTE OF AMERICA
BHMA BUILDERS HARDWARE MANUFACTURERS ASSOCIATION
CABRA COPPER AND BRASS RESEARCH ASSOCIATION
CLFMI CHAIN LINK FENCE MANUFACTURING INSTITUTE
CPA CONSUMER PROTECTION AGENCY
CPSC CONSUMER PROTECTION SAFETY COMMISSION
CRA CALIFORNIA REDWOOD ASSOCIATION
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CS COMMERCIAL STANDARD
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
DFPA DOUGLAS FIR PLYWOOD ASSOCIATION
DHI DOOR & HARDWARE INSTITUTE
EPA ENVIRONMENTAL PROTECTION AGENCY
EIA ELECTRONICS INDUSTRIES ASSOCIATION
FHA FEDERAL HOUSING ADMINISTRATION
FM FACTORY MUTUAL LABORATORIES
FS FEDERAL SPECIFICATION
FGJA FLAT GLASS JOBBERS ASSOCIATION
FTI FACING TILE INSTITUTE
GRDF GYPSUM ROOF DECK FOUNDATION
GSA GENERAL SERVICES ASSOCIATION
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
IECC INTERNATIONAL ELECTRICAL CODE COUNCIL
IFC INTERNATIONAL FIRE CODE
IFGC INTERNATIONAL FUEL GAS CODE
IES ILLUMINATING ENGINEERING SOCIETY
ILA INDIANA LIMESTONE INSTITUTE
MBMA METAL BUILDING MANUFACTURERS ASSOC.
MBSA MODULAR BUILDING STANDARDS ASSOCIATION
MFMA MARBLE FLOORING MANUFACTURERS ACCOCIATION
MIA MARBLE INSTITUTE OF AMERICA
MLMA MARBLE LATHE MANUFACTURERS ASSOCIATION
MWI METAL WINDOW INSTITUTE
NAAMM NATIONAL ASSOC. ARCHITECTURAL METAL MANUF.
NBLP NATIONAL BUREAU OF LATHING AND PLASTERING
NACA NATIONAL ACOUSTICAL CONTRACTORS ASSOCIATION
NAEC NATIONAL ASSOCIATION OF ELEVATOR CONTRACTORS
NASFCA NATIONAL AUTOMATIC SPRINKLER AND FIRE CONTROL
NBS NATIONAL BUREAU OF STANDARDS
NCHA NATIONAL CONTRACT HARDWARE ASSOCIATION
NCMA NATIONAL CONCRETE MASONRY ASSOCIATION
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOC.
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIOHS NATIONAL INST.OF OCCUPATIONALHEALTH & SAFETY
NLI NATIONAL LIMESTONE INSTITUTE
NLMA NATIONAL LUMBER MANUFACTURERS ASSOCIATION
NOFMA NATIONAL OAK FLOOR MANUFACTURING ASSOCIATION
NPCA NATIONAL PRECAST CONCRETE ASSOCIATION
NSF NATIONAL SANITATION FOUNDATION
NTMA NATIONAL TERRAZZO AND MOSAIC ASSOCIATION
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMIN.
PATMI POWER ACTUATED TOOL MANUFACTURERS INSTITUTE
PCA PORTLAND CEMENT ASSOCIATION
PCI PRESTRESSED CONCRETE INSTITUTE
PDI PLUMBING AND DRAINAGE INSTITUTE
PEI PORCELAIN ENAMEL INSTITUTE
PI PERLITE INSTITUTE
PSC PUBLIC SERVICE COMMISSION
SAA SURETY ASSOCIATION OF AMERICA
SBI STEEL BOILER INSTITUTE
SBTMA SOUTHERN BRICK AND TILE MANUFACTURERS ASSOC.
SCB SOUTH CENTRAL BELL
SCPI STRUCTURAL CLAY PRODUCTS INSTITUTE
SDI STEEL DOOR INSTITUTE; STEEL DECK INSTITUTE
SIGMA SEALED INSULATING GLASS MANUFACTURERS ASSOC.
SJI STEEL JOIST INSTITUTE
SMACCA SHEET METAL & AIR COND.CONTRACTORS ASSOC.
SPA SOUTHERN PINE ASSOCIATION
SPIB SOUTHERN PINE INSPECTION BUREAU
SPR SIMPLIFIED PRACTICE RECOMMENDATIONS
SPC STRUCTURES PAINTING COUNCIL
SRI STEEL RECYCLING INSTITUTE
SSPC SOCIETY FOR PROCTIVE COATING
SWI STEEL WINDOW INSTITUTE
TAIA THE AMERICAN INSURANCE ASSOCIATION
TCNA TILE COUNCIL OF NORTH AMERICA
TMA TILE MANUFACTURERS ASSOCIATION
UL UNDERWRITERS LABORATORIES
USDA U.S. DEPARTMENT OF AGRICULTURE
VI VERMICULITE INSTITUTION
VWPI VACCUM WOOD PRESERVATIVE INSTITUTE
WCLIB WEST COAST LUMBER INSPECTION BUREAU
WRI WIRE REINFORCEMENT INSTITUTE
PH&J Architects, Inc. - All rights reserved Page ABB-2
MISCELLANEOUS REFERENCES
A AMPERES; AREA; ARCHITECTURAL
AB ANCHOR BOLT
ABD ACOUSTICAL BOARD
AC ALTERNATING CURRENT; AIR CONDITIONING
ACOU ACOUSTICAL
ACT ACTIVE
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
ALUM ALUMINUM
ASPH ASPHALT
AT ACOUSTICAL TILE
AUTO AUTOMATIC
AVE AVENUE
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
B BATH
BC BACK CHECK
BD BOARD
BEJ BUILDING EXPANSION JOINT
BET BETWEEN
B4E BEVELED 4 EDGES
BKBD BACKBOARD
BL BUILDING LINE
BLDG BUILDING
BM BENCH MARK; BEAM
BRDG BRIDGING
BS BOTH SIDES
B&S BROWN & SHARP
BT BULB TEE
BTB BACK-TO-BACK
BTU BRITISH THERMAL UNIT
BU BUILT UP
C CARPET; CONDUIT; COURSE; CENTIGRADE; CIVIL;
CORRIDOR
CAB CABINET
CAT CATALOG
CB CHALKBOARD; CONCRETE BLOCK
CC CUBIC CENTIMETER
CDC CLOSE DON’T COUNT
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CI CAST IRON
CJ CONSTRUCTION JOINT
CL CENTER LINE
C&G CURB & GUTTER
CLG CEILING
CM CONSTRUCTION MGR; CORRUGATED METAL
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT; CHANGE ORDER
COND CONDENSATE
COL COLUMN
CONC CONCRETE
CONN CONNECT
CONT CONTINUOUS
COR CORRIDOR
CR COLD ROLLED; CORROSION RESISTANT
CRS CORROSION RESIS STEEL
CRT CATHODE RAY TUBE
CSK COUNTERSUNK
CST CENTRAL STAN TIME
CSV CRAWL SPACE VENT
CT CERAMIC TILE; EAST THRESHOLD
CTC CENTER TO CENTER
CTR COUNTER
CW COLD WATER
CWR COLD WATER RETURN
CWS COLD WATER SUPPLY
CYL CYLINDER
D PENNY (NAILS, ETC)
DA DOUBLE ACTING
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIM DIMENSION
DO DITTO
DOZ DOZEN
DN DOWN
DP DAMPPROOF
DR DRAWER; DRAIN; DOOR; DINING ROOM
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST; ELECTRICAL; ENTRY
EA EACH
EB EXPANSION BOLT
EDF ELEC DRINKING FOUNTAIN
EJF EXPANSION JOINT FILLER
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR; ELEVATION
ELD ELECTRIC LOCKING DEVICE
ENT ENTRANCE
EOS END OF SECTION
EQ EQUAL; EQUIPMENT
EQUIP EQUIPMENT
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXB EXPANSION BOLT
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXP.JT EXPANSION JOINT
EXT EXTERIOR
EXTN EXTENSION
F FAHRENHEIT; FACE
FBP FIRE BARRIER PARTITION
FC FOOT CANDLE
FD FLOOR DRAIN; FIRE DAMPER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUSHER CABINET
FED FEDERAL
FF FINISH FLOOR
FH FIRE HYDRANT; FLAT HEAD
FHC FIRE HOSE; CABINET
FL FLOW LINE; FLOOR LINE; FLOOR; FUSIBLE LINK
FOW FACE OF WALL
FPM FEET PER MINUTE
FR FIRE RATED
FS FULL SIZE; FEDERAL SPEC
FT FOOT
FTF FACE TO FACE
FVC FOOTING
FVC FIRE VALVE CABINET
FYC FOR YOUR CONSIDERATION
FYI FOR YOUR INFORMATION
G GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR; GYPSUM BOARD
GBR GUINESS BOOK OF RECORDS
GC GENERAL CONTRACTOR; GENERAL CONDTIONS
GG GRAVEL GUARD
GI GALVANIZED IRON
GL GLASS
GLM GOOD LUCK MEN
GND GROUND
GOVT GOVERNMENT
GPF GALLONS PER SQAURE FOOT
GPM GALLONS PER MINUTE
GPY GALLONS PER SQUARE YARD
GR GRADE
GT GLAZED CERAMIC TILE
GV GATE VALVE
GYP GYPSUM
H HEATING (HVAC); HALL
HAC HEATING/AIR CONDITIONING
HB HOUSE BIBB
HC HOLLOW CORE; HANDICAPPED
H/C HANDICAPPED
HD HEAVY DUTY
HDF HANDICAP DRINKING FOUNTAIN
HFS HALF FULL SIZE
HG HEAVY GAUGE
HL HIGH LIMIT
HM HOLLOW METAL
HMR HORIZONTAL MASONRY REINFORCE
HO HOLD OPEN
HORIZ HORIZONTAL
HP HORSEPOWER; HIGH PRESSURE
HPL HIGH PRESSURE LIMIT
HR HANDRAIL; HOUR
PH&J Architects, Inc. - All rights reserved Page ABB-3
HT HEIGHT
HW HOT WATER; HARDWARE (SET)
HWD HARDWARE
HVAC HEATING; VENTILATING, & AC
HZ HERTZ
ID INSIDE DIAMETER
INCL INCLUDE
INSUL INSULATING MATERIAL
INT INTERIOR
INV INVERT
IPS IRON PIPE SIZE
ISF INSIDE FACE
ITC IN THIS CONTRACT
J JANITOR
JAN JANITOR
JB JUNCTION BOX
JR JUNIOR
JS JANITOR SINK
JSV JOINT SPACE VENT
JT JOINT
K KIP (1000 LB); KITCHEN
KA KEY ALIKE
KD KNOCK DOWN; KEY DIFFERENT
KG KILOGRAM
KM KILOMETER
KV KILOVOLT
KVA KILOVOLT AMPS
KW KILOWATT
L ANGLE (METAL SHAPE)
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LDW LESS DOOR WIDTH
LED LIGHT EMITTING DIODE
LG LIGHT GAUGE
LH LEFT HAND
LIN LINEAR
LL LOW LIMIT
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW PRESSURE; LIQUID; PETROLEUM; LIGHT PROOF
LPL LAMINATED PLASTIC
LPT LOCAL PREVAILING TIME
LSG LAMINATED SAFETY GLASS
LT LIGHT
LVR LOUVER
M MEN
MAX MAXIMUM
MBT MARBLE THRESHOLD
MC MEDICINE CABINET
MDO MEDIUM DENSITY OVERLAY
MDS METAL DIVIDER STRIP
MECH MECHANICAL
MED MEDIUM; MEDICAL
MEMB MEMBER
MET METAL
MFG MANUFACTURER
MH MANHOLE
MI MALLEABLE IRON
MM MINIMUM; MINUTE
MISC MISCELLANEOUS
MK MASTER KEY; MARK
MO MASONRY OPENING
MP MEDIUM PRESSURE
MPH MILES PER HOUR
MT METAL THRESHOLD
MTD MOUNTED
MTP METAL TOILET PARTITION
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NL NIGHT LATCH
NO NUMBER; NITROUS OXIDE
NRP NON-REMOVABLE PIN
NTR NO TEMPERATURE RATING
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OCEW ON CENTER EACH WAY
OLF OUNCE PER LINEAR FOOT
OD OUTSIDE DIAMETER
OH OVERHEAD; OVAL HEAD
OPG OPENING
OPH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
OSF OUTSIDE FACE
OTO OUT TO OUT
OXY OXYGEN
OZ OUNCE
P PLUMBING
PA PARALLEL ARM; PUBLIC ADDRESS
PAR PARAGRAPH
PAS POWDER ACTUATED STUD
PB PROJECT BOOK
P/C PRESTRESSED CONCRETE; PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCY POUNDS PER CUBIC YARD
PDF POWER DRIVEN FASTENER
PGL PLATE GLASS
PH PHILLIPS HEAD
PL PROPERTY LINE; PLATE
PLB PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYW PLYWOOD
POL POLISH
PP POWER POLE
PPS POUNDS PER SQUARE
PRV PRESSURE REDUCING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAGE
PSY POUNDS PER SQUARE YARD
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTP PLASTIC(FACED)TP
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RADIUS; RUBBER
RA RETURN AIR
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN; ROAD; ROUND
RE REFERENCE
REF REFRIGERATOR
REG REGISTER
REV REVISED
REQD REQUIRED
RH RELATIVE HUMIDITY; RIGHTHAND; ROUND HEAD;
ROBE HOOK
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
R/W RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS&S ROD STOCK & SEALANT
RT RESILIENT TILE
S SOUTH; STAIR; STRUCTURAL
SA SUPPLY AIR SINGLE ACTING
SAN SANITARY
SBP SMOKE BARRIER PARTITION
SC SOLID CORE; SCALE
SCH SCHEDULE
SCHED SCHEDULED
SD SOAP DISPENSER OR DISH; SMOKE DAMPER
SEC SECTION
SF SQUARE FEET
SG SOAP GRAB
SGT STRUCTURAL GLAZED TILE
SH SHEET
SHF SHELF
SHVS SHELVES
SI SQUARE INCH
SIM SIMILAR
SLA SINGLE LEVER ARM
SNB SEX NUTS & BOLTS
SND SANITARY NAPKIN DISPENSER
SOT SEE OTHER TRADES
SP SINGLE PHASE; SINGLE POLE
SPEC SPECIFICATION
SP SPLASH PAN
SQ SQUARE
SR SHOWER ROD
SS STAINLESS STEEL; SANITARY SEWER
SSD SUB-SURFACE DRAIN
SSMH SANITARY SEWER MANHOLE
STL STEEL
STR STRUCTURAL
SW SWITCH
SY SQUARE YARD
SYP SOUTHERN YELLOW PINE
S4S SURFACE 4 SIDES
PH&J Architects, Inc. - All rights reserved Page ABB-4
T TOILET
TAB TEST & AIR BALANCE
TB TACKBOARD
T&B TOP &BOTTOM
TC TERRA COTTA
TEL TELEPHONE
TGL TEMPERED GLASS
TLC TENDER LOVING CARE
TOC TOP OF CURB
TOW TOP OF WALL
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TR TOWEL ROD
TRANS TRANSFORMER
TS TERRAZZO STRIP
TS TUBE (STRUCTURAL SHAPE) TERRAZZO (EXPANSION) STRIP
TSTAT THERMOSTAT
TV TELEVISON
TYP TYPICAL
U URINAL
UC UNERCUT; UNDERCOUNTER
UOS UNLESS OTHERWISE SHOWN
USG UNITED STATE GAGE
V VOLTAGE; VESTIBULE
VAC VACUUM
VB VAPOR BARRIER
VC VITROUS CLAY
VCT VINYL COMPOSITION TILE
VIB VIBRATOR
VDT VIDEO DISPLAY TERMINAL
VP VAPORPROOF
VAT VINYL ASBESTOS TILE
W WOMEN; WATT; WEST
W/ WITH
WC WATER CLOSET
WD WINDOW DIMENSION; WOOD
WDW WINDOW
WF WIDE FLANGE(BEAM)
WG WIRE GLASS
WH WEEP HOLE; WATER HEATER, WALL HYDRANT
WM WASHING MACHINE
WOT WORK OF OTHER TRADES
WP WATER/WEATEHER PROOF
WR WATER RESISTANT
WS WOOD SCREWS
W&V WASTE AND VENT
WWF WOVEN WIRE FABRIC
WWM WOVEN WIRE MESH
YH YARD HYDRANT
*WHERE AN ABBREVIATION HAS MORE THAN ONE MEANING, ASSUME
THE USE APPROPRIATE TO THE TRADE OR ITEM REFERRED TO.
Renovate Permanent Party Dorm Building 697 MAFB-PNQS-20-0697 Maxwell AFB, Alabama PHJA/2305US
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 50 00 SUPPLEMENTARY FORMS AND DOCUMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 33 ENVIRONMENTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 73 00 ALTERATION WORK
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 SELECTIVE REMOVAL AND DEMOLITION
02 82 00 ASBESTOS REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 00 MINERAL FIBER BUILDING INSULATION
07 31 13 ASPHALT SHINGLES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
PROJECT TABLE OF CONTENTS Page 1
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO (DEFS System)
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 35 00 CASEWORK
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 13.34 40 CONTROL VALVES, SELF-CONTAINED
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 30 00 HVAC AIR DISTRIBUTION
23 31 13.00 40 METAL DUCTS
23 36 00.00 40 AIR TERMINAL UNITS
PROJECT TABLE OF CONTENTS Page 2
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 16.00 40 AIR COILS
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 51 00 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 46 13 FOUNDATION DRAINAGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION 00 50 00
SUPPLEMENTARY FORMS AND DOCUMENTS
PART 1 GENERAL
1.1 AVAILABLE INFORMATION
1.1.1 Geotechnical Report
The Geotechnical Report prepared by Carmichael Engineering entitled Maxwell AFB Dorm Building 697 Elevator Addition, Report #G23-7036, dated July 12, 2023 is attached for the information of the Contractor.
This report identifies properties of below grade conditions and offers recommendations for the design of foundations.
This report, by its nature, cannot reveal all conditions that exist on the site. Should subsurface conditions be found to vary substantially from this report, changes in the design and construction of foundations will be made, with resulting credits or expenditures to the Contract Price .
1.2 SUPPLEMENTARY FORMS
The following forms are attached for use by the Contractor in the administration of the project:
A. 01 00 00.10 B - AF Form 3000 Material Submittal Approval
B. 01 00 01.10 C - Contractor's Haz Mat Questionaire v2
C. 01 00 01.10 D - Contractor's Environmental Entry Form v2
D. 01 00 01.10 E - Recycling and Landfill Report Form v2 (Word version available)
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
GeoTechnical Report #G23-7036
01 00 00.10 B - AF Form 3000 Material Submittal Approval
01 00 01.10 C - Contractor's Haz Mat Questionaire v2
01 00 01.10 D - Contractor's Environmental Entry Form v2
01 00 01.10 E - Recycling and Landfill Report Form v2 -- End of Section --
DOCUMENT 00 50 00 Page 1 August 25, 2023
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the following and incidental related work:
A. Remove all furniture and equipment in the building and deliver to locations on Maxwell AFB and/or on Gunter Annex, as directed by the Construction Agent.
B. Demolishing interior finishes, partitions, interior doors and door frames, HVAC, plumbing and plumbing fixtures, electrical power and lighting, telecommunications, fire protection and fire alarm.
C. Construct new interior partitions, exterior and interior doors and door frames, and finishes - ceilings, walls, and flooring.
D. Install new building systems including HVAC to include chiller, plumbing, electrical power and lighting, telecommunications, fully automatic, monitored fire sprinkler system and fire alarm.
E. Slab cutting and infilling for new under slab utilities.
F. Site work includes a new fire sprinkler supply line, new domestic water line and new sanitary line.
1.1.2 Bid Options
Bid Options quoted on Bid Forms will be reviewed and accepted or rejected at Government's option. Accepted Bid Options will be identified in the Owner-Contractor Agreement.
Coordinate related work and modify surrounding work to integrate the Work of each accepted Bid Option
1.1.2.1 Schedule of Bid Options
Bid Option 01: Alterations to Closets, Building 697.
a. Demolish existing closets in the "Jack & Jill" dorm rooms as indicated in the contract documents.
b. Construct new closets as in the "Jack & Jill" dorm rooms as indicated in the contract documents.
Bid Option 02: Construct New Elevator, Building 697.
a. Sitework: excavate and modify the site as required in the contract documents for a new elevator shaft and elevator. Tie into/modify existing utilities as required for new work as indicated in the contract documents.
SECTION 01 11 00 Page 1 August 25, 2023
b. Foundation: Provide new foundation to support the new elevator shaft and elevator as indicated in the contract documents.
c. Elevator shaft: Construct new elevator shaft of materials indicated in the contract documents.
d. Install a new hydraulic 5,000 lb. capacity passenger elevator as indicated in the contract documents.
e. Remove portion of existing roof system on the existing roof for tying into the new elevator shaft.
1.1.3 Location
The work is located at Building 697, Maxwell Air Force Base, AL, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 OCCUPANCY OF PREMISES
Building will not be occupied during performance of work under this Contract.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.4 COORDINATION
The contractor shall coordinate work with the Technical Manager (TM)/Contract Administrator to avoid interference with necessary activities within and adjacent to the construction site. The Contractor shall coordinate the work of all trades to prevent any conflicts. The Contractor, before proceeding with the construction, shall resolve any conflicts of components.
1.5 SITE VISIT
Contractor is responsible for site investigation in accordance with contract clause entitled "Site Investigation and Conditions Affecting the Work" (FAR 52.236-3).
1.6 CONTRACT DRAWINGS AND SPECIFICATIONS
The Contractor must comply with the contract clause entitled "Specifications and Drawings for Construction" (FAR 52.236-21).
SECTION 01 11 00 Page 2 August 25, 2023
All drawings are diagrammatic and are intended to qualify the materials specified and indicate their intended relationship to each other. The drawings are not to be scaled, rather field conditions should dictate placement. The various scales used on the drawings may not allow the indications of all fittings, offsets, and accessories that may be required. The Contractor is to carefully investigate the conditions that would affect the work to be performed and shall arrange such work accordingly.
1.7 LOCATION OF UNDERGROUND UTILITIES
Prior to excavating for any purpose, the Contractor shall obtain an approved Construction Permit, AF Form 103 (dated July 1982), from the MSD/CE, 400 Cannon Street, Maxwell Air Force Base. The Government will determine what facilities are beneath the surfaces and discuss their locations with the Contractor prior to issuing the AF Form 103. Verify existing utility locations indicated on contract drawings, within area of work.
The purpose of this form is to give the Contractor clearance to excavate a given area, to protect the underground facilities, and to protect personnel from injury.
The Contractor is required to determine the exact location to be excavated in relation to the underground facilities prior to excavating.
The AF Form 103 may note cable, pipe, etc., in the area; if this occurs, Contractor will be responsible for digging in such a manner so as not to damage the hidden facility. Contractor will place particular emphasis on the site inspection prior to proposing to determine which facilities are obviously in the area.
]1.7.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.After receipt of the approved AF Form 103, the Contractor will not perform any excavation work without specific approval by the Contracting Officer.
1.8 SALVAGE MATERIAL AND EQUIPMENT
No removed items will be reused in this contract unless specifically listed in these specifications and/or on the drawings. All removed furnishings and equipment remain Government property. Other removed materials become the Contractor's property unless noted otherwise.
The Contractor will be required to furnish lifting equipment as necessary to remove the equipment and shall provide all equipment to transport the removed Government items to a designated location. All other unused material or debris will be removed from Government-controlled property. Use of Government-contracted dumpsters is prohibited. Unused materials, debris and rubbish shall be disposed of off base in a permitted landfill. The Contractor shall comply with Alabama Department of Environmental Management (ADEM) Code, Division 13, Solid Waste Program, and Chapter 335-13-1, through 335-13-8; Adopted November 18, 1981; Amended July 26, 1996.
SECTION 01 11 00 Page 3 August 25, 2023
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 11 00 Page 4 August 25, 2023
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
A. Schedule Of Work: The Contractor shall be responsible for establishing a schedule to meet construction time. Contractor shall prepare a work schedule on forms provided by Contracting Officer (CO)/Contract Administrator for schedule of work. Contractor shall have 360 calendar days to complete the work.
B. Phasing Of Work: The Contractor shall have procure all equipment and material to complete this project prior to the start of work onsite.
The Contractor will have access to the site for construction activities beginning on 01 September 2023, and work shall be completed no later than 31 MARCH 2024.
C. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
The Contractor shall be responsible for the orderly handling of traffic through the work at all times during the life of the construction contract. This shall be accomplished in conformity with Sub article (d).
"HANDLING OF TRAFFIC," of Article 104.04, "Sequence of Construction for Handling Traffic Through the Work and Construction and Maintenance of Detours," of Section 104, "SCOPE OF WORK," of the Alabama Highway Department "Standard Specifications for Highway Construction," 1992 Edition. In this specification, the word "Engineer" Shall be replaced with the words CO.
SECTION 01 14 00 Page 1 August 25, 2023
1.3.1.1 Subcontractors and Personnel Contacts
The Contractor shall notify 42 SFS/SPAI, Maxwell AFB AL, no later than 10 days after contract award a list of contact personnel. The notification shall include:
a. Name, address, and telephone number of each company representative.
b. The contract number and contracting agency (e.g., 42 CONS/PKC).
c. The description of the work to be performed/construction project number.
d. The location(s) of the construction work (i.e., street address or other description of the construction site).
e. The date contract performance begins.
f. Any updates to information previously provided under this paragraph.
The Contractor shall maintain a current listing of employees. The list shall include employee's name, social security number, and level of security clearance (if contract work involves unescorted entry to Air Force restricted or other sensitive areas designated by the installation commander). The list shall be validated and signed by the company Facility Security Officer (FSO) and provided to the TM/Contract Administrator, Maxwell AFB, AL, prior to the contract start date. Updated listing shall be provided when an employee's status or information changes.
1.3.1.2 No Smoking Policy
Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, and its AETC supplement 1, outline the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.
1.3.2 HEALTH STANDARDS
The following specified guidance is essential to maintaining compliance with the health standards on this base. This contract must adhere to all of the following.
1.3.2.1 Drinking Water:
A. If a facility is to be constructed in which sources of drinking water are provided (sinks, water fountains, showers, etc.), the water lines must be flushed thoroughly prior to occupancy. BEE approval is required before the water is declared potable. If the contractor is required to test the interior water lines, provide BEE the documentation at two weeks prior to occupancy of the facility .If the contractor is not required to do bacteriological testing of the interior water lines, the BEE office should be contacted at least two weeks prior to occupancy so that we may schedule our testing of the system.
B. If water mains are constructed or repaired, disinfection of the lines must be conducted as stated in ANSI/AWWA C651-92, American Water Works Association for Disinfecting Water Mains prior to putting into service. Provide our office with a copy of the documentation that demonstrates compliance with the above requirements. We recommend coordination of the plan to disinfect water mains prior to
SECTION 01 14 00 Page 2 August 25, 2023 construction to ensure that we agree with the disinfection and testing method.
1.3.2.2 Hazardous Materials
All hazardous chemicals (including paint, cleaning solutions, solvents and so on) used by the contractor must be registered with the Maxwell AFB Hazardous Material Manager, which can be contacted at 953-5260.
1.3.2.3 Radioactive Materials (RAM)
Air Force requirements for the management are listed in AFI 40-201, Management Radioactive Materials in the USAF. All contractors who intend to bring RAM (such as the materials in the soil density gauges, X-ray fluorescence meters, etc.) onto Maxwell AFB must first obtain written approval from the Base Radiation Safety Officer (RSO), in the Bioenvironmental Engineering (BEE) Flight 334-953-5848. To provide this approval, the RSO needs a written request no later than 30 days prior to initiating any work requiring radioactive material. The request must include the following information:
A. A copy of your NRC license (or State license with a current NRC FonD
241) that authorizes your use of radioactive material on this installation.
B. Training certificate(s) for individual(s) who will use the instrument on base.
C. The most recent leak/wipe test for the instrument(s) that will be used on base.
D. A signed document on company letterhead paper that includes:
1. A brief description of your proposed activities including:
instruments to be used and their purpose, the contract number and title under which you will work, location of the work (closest building number, annotated map, or similar identification), and anticipated start and end dates (with the understanding that actual days of use are difficult to specify in advance).
2. The name, local address, and telephone number of both the responsible local representative and the RSO.
3. Name and phone number of the Maxwell AFB inspector overseeing the project.
4. An acknowledgement that the Maxwell AFB RSO can make periodic Checks to ensure contractor personnel follow radiation safety practices to prevent exposure to Air Force personnel and avoid contamination of government property as well as an understanding that the Maxwell AFB RSO has the authority to suspend any contractor operation believed to be unsafe.
1.3.2.4 Asbestos
No friable asbestos containing materials will be installed as a part of this contract. Spray application of asbestos or asbestos-containing materials to exposed walls, ceilings, ducts, columns, etc. is prohibited.
In the event friable asbestos containing materials are encountered during
SECTION 01 14 00 Page 3 August 25, 2023
"rip out" and demolition operations, the Contractor shall stop work in that area so that so not to disrupt the asbestos containing materials and notify the TM/Contract Administrator who will take appropriate action.
1.3.2.5 Asbestos/Lead-Based Paint Abatement
Contractors who will perform asbestos and or lead-based paint abatement work must comply with all OSHA regulations and be certified by Safe State of Alabama. In particular, after all visible debris has been removed and the abatement area has been appropriately decontaminated, the contractor must perform clearance sampling verifying the area is clean before re-occupancy can be allowed. BEE must review all clearance sample results prior to government acceptance of abatement areas as clean. Contractors can expedite this process by submitting copies of clearance results directly to the BEE for review.
1.3.3 Working Hours
The Contractor will perform all work during work hours between 6:00 A. M.
and 5:00 P.M (normal working hours). The Contractor will not normally be permitted to work on weekends or on the following legal holidays (or the day the federal government observes these holidays) unless the work has coordinated such work with the TM/Contract Administrator at least 72 hours in advance:
a. New Year's Day
b. Martin Luther King, Jr.'s Birthday
c. Washington's Birthday
d. Memorial Day
e. Juneteenth
f. Independence Day
g. Labor Day
h. Columbus Day
i. Veteran's Day
j. Thanksgiving Day
k. Christmas Day
1.3.4 Occupied Building[s]
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
SECTION 01 14 00 Page 4 August 25, 2023
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and gas are considered utility cutovers .
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.4 FIRE REGULATIONS
The Contractor shall comply with all aspects of the National Fire Protection Association (NFPA) publication 241, "Safeguarding Building Construction, Alteration and Demolition Operations; EM 385-1-1, Safety and Health Requirements Manual; and Maxwell AFB Instruction 32-2005, Fire Prevention and Protection During Construction, Alteration, Demolition, and Repair Operations.
1.5 PROTECTION OF GOVERNMENT PROPERTY AND PERSONNEL
1.5.1 Work Areas Included
A. Construction site: Area or areas in which the work of the contract is accomplished or performed.
B. Storage areas: Area or areas used for the storage of materials, devices, appliances, and equipment to be used in the work.
C. Office and shed areas: Area or areas for placing or setting of temporary field office, tool sheds, or storage sheds.
D. Transportation areas: Area or areas that are defined as streets, roads, driveways, parking areas, etc., paved, treated, and unpaved;
area or areas not paved, such as grass plots or grass areas used for transportation purposes.
1.6 SECURITY REQUIREMENTS
1.6.1 PASS AND IDENTIFICATION
The Contractor shall obtain the following pass and identification items:
A. DD Form 1172, "Application for Uniformed Services Identification Card" (AFI 36-3001 and AETCR 30-1). Forms shall be supplied by the Contracting Office Customer Service Station. The Contractor shall fill out the forms and take them to Pass and Identification, Building 502, 10 North Pine Street, Maxwell AFB.
B. AETC Form 58, "Civilian Identification Card" (AETCR 30-1). Pass and Identification will issue this to each Contractor employee.
C. AF Form 2219 (series), "Registered Vehicle Expiration Tab", (AFI
SECTION 01 14 00 Page 5 August 25, 2023
31-204), "Motor Vehicle Traffic Supervision" and DD Form 2220, "DOD Registered Vehicle and Installation Tab" (AFI 31-204). The Security Forces, Pass and Registration Section, Building 502, 10 North Pine Street (at the Bell Street entrance) will issue vehicle registration decals, upon proof of employment, insurance, ownership of vehicle, and a valid driver's license. A temporary decal will be issued if employment is for six months or less.
D. AF Form 1199, USAF Restricted Area Badge, or a locally developed badge (if applicable).
E. AF Form 75, Visitor/Vehicle Pass (AFI 31-204)
F The Contractor shall retrieve all identification media, including vehicle decals from employees who depart for any reason before the contract expires (e.g., terminated for cause, retirement, etc.)
1.6.2 PHYSICAL SECURITY; KEY CONTROL; LOCK COMBINATIONS &
CONTROLLED/RESTRICTED AREAS
1.6.2.1 Physical security
The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for the Contractor's use. At the end of each work period, all Government facilities, equipment, and materials shall be secured. The Contractor shall also be responsible for the security of his own facilities, equipment, and material.
1.6.2.2 Key control.
The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The following shall apply:
A. The Contractor shall not duplicate any keys issued by the Government
B. The Contractor shall immediately report any occurrences of lost or duplicated keys to the Government.
C. In the event of lost or duplicated keys, the Contractor may be required, upon written direction of the Government, to re-key or replace the affected lock or locks without cost to the Government.
The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from payment due the Contractor. In the event a master key is lost or duplicated, the Government shall replace all locks and keys for that system and the total cost deducted from payment due the Contractor.
D. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor's employees and the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in performance of contract work requirements in those areas.
1.6.2.3 Controlled/Restricted Areas.
The Contractor shall implement local Base procedures for entry to Air Force control/restricted areas where Contractor personnel will work.
SECTION 01 14 00 Page 6 August 25, 2023
1.6.2.4 Lock combinations.
The Contractor shall control access to all Government-provided lock combinations to preclude unauthorized entry.
1.6.3 OPERATING INSTRUCTION (OI)
If applicable, the Contractor shall develop an OI for internal circulation control, protection of resources, and regulated entry into Air Force controlled areas during normal, simulated, and actual emergency operations. The OI shall be coordinated through 42 SFS/SPAIR located at 130 W. Selfridge Street, Maxwell AFB, and shall be written in accordance with AFI 31-209 ("Air Force Resource Protection Program"), the local Base Operations Plan, and AFI 31-210 ("Anti-Terrorism Program").
1.6.4 REPORTING THREATS TO SECURITY
The Contractor shall comply with the requirements of AFI 71-101V1, "Counterintelligence Awareness and Briefing Program." Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware that may pose a threat to the security of DOD or Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
1.6.5 WEAPONS, FIREARMS, AND AMMUNITION
Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within Contractor-owned or privately owned vehicles while on Maxwell AFB or Gunter Annex.
PART 2 PRODUCTS
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 7 August 25, 2023
SECTION 01 32 16.00 20
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Baseline Construction Schedule;
SD-07 Certificates
Monthly Updates
1.2 PRE-CONSTRUCTION SCHEDULE REQUIREMENT
Within 30 calendar days after contract award and Prior to the start of work, prepare and submit to the Contracting Officer a Baseline Construction Schedule in the form of AF 3064 Progress Schedule attached to the end of this section. . The approval of a Baseline Construction Schedule is a condition precedent to:
a. The Contractor starting demolition work or construction stage(s) of the contract.
b. Processing Contractor's invoice(s) for construction activities/items of work.
c. Review of any schedule updates.
Submittal of the Baseline Construction Schedule, and subsequent schedule updates, is understood to be the Contractor's certification that the submitted schedule meets the requirements of the Contract Documents, represents the Contractor's plan on how the work will be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).
1.3 SCHEDULE FORMAT
1.3.1 Bar Chart Schedule
The Bar Chart must, as a minimum, show work activities, submittals, Government review periods, material/equipment delivery, utility outages, on-site construction, inspection, testing, and closeout activities. The Bar Chart must be time scaled and generated using an electronic spreadsheet program.
An Excel format of the schedule can be provided by the Contracting Officer upon request.
SECTION 01 32 16.00 20 Page 1 August 25, 2023
1.3.2 Schedule Submittals and Procedures
Submit Schedules and updates in hard copy and on electronic media that is acceptable to the Contracting Officer. Submit an electronic back-up of the project schedule in an import format compatible with the Government's scheduling program.
1.4 SCHEDULE MONTHLY UPDATES
Update the Construction Schedule at monthly intervals or when the schedule has been revised. Keep the updated schedule current, reflecting actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed by the Contracting Officer.
a. Narrative Report: Identify and justify the following:
(1) Progress made in each area of the project;
(2) Longest Path: Include printed copy on 11 by 17 inch paper, landscape setting;
(3) Date/time constraint(s), other than those required by the contract;
(4) Listing of changes made between the previous schedule and current updated schedule including: added or removed activities, original and remaining durations for activities that have not started, logic (sequence, constraint, lag/lead), milestones, planned sequence of operations, longest path, calendars or calendar assignments, and cost loading.
(5) Any decrease in previously reported activity Earned Amount;
(6) Pending items and status thereof, including permits, changes orders, and time extensions;
(7) Status of Contract Completion Date and interim milestones;
(8) Current and anticipated delays (describe cause of delay and corrective actions(s) and mitigation measures to minimize);
(9) Description of current and future schedule problem areas.
For each entry in the narrative report, cite the respective Activity ID and Activity Name, the date and reason for the change, and description of the change.
1.5 CORRESPONDENCE AND TEST REPORTS:
Correspondence (e.g., letters, Requests for Information (RFIs), e-mails, meeting minute items, Production and QC Daily Reports, material delivery tickets, photographs) must reference Schedule Activities that are being addressed. Test reports (e.g., concrete, soil compaction, weld, pressure) must reference Schedule Activities that are being addressed.
1.6 ADDITIONAL SCHEDULING REQUIREMENTS
Any references to additional scheduling requirements, including systems to be inspected, tested and commissioned, that are located throughout the
SECTION 01 32 16.00 20 Page 2 August 25, 2023 remainder of the Contract Documents, are subject to all requirements of this section.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
01 32 01 AF Form 3064 Progress Schedule -- End of Section --
SECTION 01 32 16.00 20 Page 3 August 25, 2023
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-01 Preconstruction Submittals
For Government approved division 01 preconstruction submittals that are required prior to or commencing with the start of work must be submitted within 30 calendar days of contract award unless specified elsewhere in the specifications. For contractor approved division 01 submittals that are required prior to or commencing with the start of work must be submitted within 45 calendar days of contract award unless specified elsewhere in the specifications.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates Of Insurance
Surety Bonds
List Of Proposed Subcontractors
List Of Proposed Products
Baseline Network Analysis Schedule (NAS)
Submittal Register
Schedule Of Prices Or Earned Value Report
Work Plan
Quality Control (QC) plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
SECTION 01 33 00 Page 1 August 25, 2023
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards ensuring work can be judged. Includes assemblies or portions of assemblies that are to be incorporated into the project and those that will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by
SECTION 01 33 00 Page 2 August 25, 2023 responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
D…
This is the start of the file's text. The full file is on GovTribe.