These are architectural and structural construction documents for the U.S. Department of Veterans Affairs Sioux Falls VA Health Care System Campus, specifically for improving campus building exteriors. The project involves renovation work for multiple buildings (Buildings 1, 5, 7, 8, 9, 11, 16, 17, 38, and 52) located in Sioux Falls, South Dakota. The documents include detailed roof plans, demolition plans, reflected ceiling plans, and structural drawings, with comprehensive technical specifications covering structural design criteria, concrete and steel specifications, wind and snow load calculations, and specific construction requirements. The drawings are dated September 15, 2023, and prepared by multiple consulting firms including Stone Group Architects, Dunham Associates, Ehrhart Griffin & Associates, and Ericksen Roed Associates, with the Office of Construction and Facilities Management overseeing the project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
S G
A R ev it
Lo ca l\2
6_
V A
S F
_I C
B E
_O V
E R
A
LL
_M ic ha el
A lb
.r vt
9/
/2
8:
:4
A
M
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
S G
A R ev it
Lo ca l\2
6_
V A
S F
_I C
B E
_O V
E R
A
LL
_M ic ha el
A lb
.r vt
9/
/2
8:
:5
A
M
L(x) = LOW SLOPE ROOF M(x) = METAL ROOF S(x) = SLATE ROOF
• ADHERED 60 MIL ROOFING MEMBRANE
• ADHERED 5/8" HEAVY DUTY COATED WATER RESISTANT GYPSUM BOARD WITH PRIMED GLASS MAT FACER -R-0.7
• ADHERED LAYER OF TAPERED RIGID ISO ROOF INSULATION (SLOPE 1/4 : 12)
• (REF. PLAN FOR OVERALL INSULATION & COVER BOARD THICKNESS)
• EXISTING CONCRETE DECK
• ADHERED 60 MIL ROOFING MEMBRANE
• ADHERED 5/8" HEAVY DUTY COATED WATER RESISTANT GYPSUM BOARD WITH PRIMED GLASS MAT FACER -R-0.7
• ADHERED 2 1/2" TOP LAYER RIGID ISO ROOF INSULATION -R-14.4
• ADHERED 2 1/2" BASE LAYER RIGID ISO ROOF INSULATION -R-14.4
• SELF ADHERING REINFORCED SBS VAPOR RETARDER
• EXISTING CONCRETE DECK (SLOPED)
• ADHERED 60 MIL ROOFING MEMBRANE
• ADHERED 5/8" HEAVY DUTY COATED WATER RESISTANT GYPSUM BOARD WITH PRIMED GLASS MAT FACER -R-0.7
• ADHERED TOP LAYER OF TAPERED RIGID ISO ROOF INSULATION -R-5.7/INCH
• ADHERED 2" BASE LAYER RIGID ISO ROOF INSULATION -R-11.4
• (REF. PLAN FOR OVERALL INSULATION & COVERBOARD THICKNESS)
• SELF ADHERING REINFORCED SBS VAPOR RETARDER
• EXISTING CONCRETE DECK
B
LD
G
A
B
LD
G 1D
, 5 D
, 5 F
,7
8, B
LD
G
A , 1
B , 5
B
5C ,5
E , 5
G ,5
J, K
5M , 5
O (N
O R
T H
5O (S
O U
T H
5S
, 8 B
LD
G
6,
• COMPOSITE SLATE TILES
• COPPER SNOW GUARDS
• SELF ADHERED ICE & WATER SHIELD UNDERLAYMENT
• EXISTING WOOD DECK
• EXISTING WOOD FRAMING
• LOCK SEAM COPPER ROOF (20 OZ, 16" WIDE)
• SELF ADHERED ICE & WATER SHIELD UNDERLAYMENT
• EXISTING 1" WOOD SHEATHING
• EXISTING WOOD DORMER FRAMING
• STANDING SEAM METAL ROOF (16" WIDE)
• SELF ADHERED ICE & WATER SHIELD UNDERLAYMENT
• 1/2" PLYWOOD SHEATHING
• EXISTING 1" WOOD SHEATHINGB
LD
G
B
LD
G
• ADHERED 60 MIL REINFORCED ROOFING MEMBRANE
• 5/8" HEAVY DUTY COATED WATER RESISTANT GYPSUM BOARD WITH PRIMED GLASS MAT FACER -R-0.7
• TAPERED RIGID ISO ROOF INSULATION (SLOPE AS NOTED ON PLAN) -R-5.7/INCH
• 1 1/2" BASE LAYER RIGID ISO ROOF INSULATION -R-8.6
• (REF. PLAN FOR OVERALL INSULATION & COVERBOARD THICKNESS)
• (MECHANICALLY FASTENED INSULATION AND COVERBOARD)
• POLY VAPOR RETARDER
• EXISTING METAL DECK
• EXISTING STEEL BAR JOISTS (SLOPED)
• ADHERED 60 MIL REINFORCED ROOFING MEMBRANE
• 5/8" HEAVY DUTY COATED WATER RESISTANT GYPSUM BOARD WITH PRIMED GLASS MAT FACER -R-0.7
• TAPERED RIGID ISO ROOF INSULATION (SLOPE 1/4 : 12) -R-5.7/INCH
• 2" BASE LAYER RIGID ISO ROOF INSULATION -R-11.4
• (REF. PLAN FOR OVERALL INSULATION & COVER BOARD THICKNESS)
• (MECHANICALLY FASTENED INSULATION AND COVERBOARD)
• POLY VAPOR RETARDER
• EXISTING METAL DECKB
LD
G
G
E
N T
R Y
5H , 5
L, N , 5
P , 3
• ADHERED 60 MIL REINFORCED ROOFING MEMBRANE
• EXISTING WOOD DECK
B
LD
G
• REINSTALL SALVAGED SLATE METAL ROOFING PANELS (EDCO, ARROWLINE SLATE #1748, 28 GA. STEEL - 952-945-2680 sales@edcoproducts.com)
• REINSTALL SALVAGED SNOW GUARDS TO MATCH ORIGINAL LAYOUT
• SELF ADHERED ICE & WATER SHIELD UNDERLAYMENT
• 4" NAILBASE INSULATION
• EXISTING WOOD SHEATHINGB
LD
G
R
• ADHERED 60 MIL REINFORCED ROOFING MEMBRANE
• 5/8" HEAVY DUTY COATED WATER RESISTANT GYPSUM BOARD WITH PRIMED GLASS MAT FACER -R-0.7
• TAPERED RIGID ISO ROOF INSULATION (SLOPE 1/4 : 12) -R-5.7/INCH
• 2" BASE LAYER RIGID ISO ROOF INSULATION -R-11.4
• (REF. PLAN FOR OVERALL INSULATION & COVER BOARD THICKNESS)
• (MECHANICALLY FASTENED INSULATION AND COVERBOARD)
• POLY VAPOR RETARDER
• EXISTING WOOD DECK
B
LD
G
C B
LD
G
A
, 1 C
, 1 6,
• COMPOSITE SLATE TILES
• COPPER SNOW GUARDS
• SELF ADHERED ICE & WATER SHIELD UNDERLAYMENT
• 3" NAILBASE INSULATION - ROUTE OUT 3/4" X 1/4" GROOVE IN
INSULATION AT EACH EXISTING TEE - REF STRUCT
• 1 1/2" METAL DECK
B
LD
G
A , 1
B
• STANDING SEAM METAL ROOF (16" WIDE)
• SELF ADHERED ICE & WATER SHIELD UNDERLAYMENT
• 4" NAILBASE INSULATION
• POLY VAPOR RETARDER
• EXISTING METAL DECKB
LD
G
5, 52
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
GENERAL STRUCTURAL NOTES
These notes supplement the Specifications. Refer to the Specifications for additional requirements.
1. DESIGN CRITERIA:
1.1. BUILDING CODES USED FOR DESIGN:
1.1.1. IBC 2018.
1.2. STRUCTURAL TESTS AND SPECIAL INSPECTIONS:
1.2.1. Special inspections shall be performed by an
independent testing agency according to IBC Chapter 17.
Section 1705.2 and Table 1705.2.3 - Steel Construction Table 1705.3 - Concrete Construction Table 1705.3 - Post-installed Anchors
1.2.2. Qualifications of special inspectors and
frequency of tests and inspections shall be as defined in CASE 962C - Guideline for International Building Code- Mandated Special Inspections and Tests and Quality Assurance.
1.2.3. The Engineer will provide periodic observation
to assure conformance with design intent of the construction documents. These observations are not meant to fulfill the requirements of special inspections.
1.2.4. Special inspections of the following items are
not within the scope of the structural drawings. Contact the Architect or design professionals with these responsibilities for information about these items.
Sprayed Fire-resistant Materials Mastic and Intumescent Fire-resistant Coatings
EIFS
Smoke Control
1.4. DESIGN LOADS:
1.4.1. Risk Category:
From IBC Table 1604.5
Risk Category . . . . . . . . . . . IV
1.4.2. DESIGN LIVE LOADS:
Public Areas . . . . . . . . . . . 100 PSF Corridors and Stairs . . . . . . . 100 PSF
1.4.3. WIND LOAD:
Ultimate Design Wind Speed: . . . 125 MPH Exposure Classification: . . . . . B Internal Pressure Coeff: . . . . . +0.18
. . . . . -0.18 Wind pressures used for the design of exterior components and cladding shall be calculated by a professional engineer registered in the state where the project is located. Calculations shall be submitted for review.
1.4.4. SNOW LOAD:
Ground Snow Load: . . . . . . . . . 40 PSF Flat Roof Snow Load: . . . . . . . 34 PSF Snow Exposure Factor: . . . . . . . 1.0 Snow Load Importance Factor: . . . 1.2 Roof Thermal Factor: . . . . . . . 1.0 Roof Slope Factor: . . . . . . . . 1.0
1.4.5 DESIGN STEEL DECKING AND ACCESSORIES.
Wind Uplift Resistance and Corner Conditions:
Corner uplift pressure..............68 PSF Minimum Perimeter uplift pressure...........42 PSF Minimum Field of roof uplift pressure.......38 psf Minimum
1.5. DEFLECTION AND DRIFT
1.5.1. Horizontal framing members are designed for
deflections as tabulated. Deflections of horizontal to horizontal framing members are additive. Subcontractors shall make allowance for installation and operation of their systems to accommodate these deflections.
TYPICAL FRAMING MEMBERS
Roof Live Load . . . . . . . . . . . . . . span/360 Construction Load . . . . . . . . . . . . . span/180
2. DESIGN STRENGTHS:
2.1. CONCRETE:
2.1.1. All concrete shall be stone aggregate unless
noted. See Specifications for additional durability requirements.
2.1.2. Minimum concrete 28-day compressive strength
shall be as follows:
f'c Type Add'l Location (PSI) Remarks 4000 NWT, Air Note 1 All Concrete
Note 1: Limit Water to Cement Ratio to 0.45
2.2. CONCRETE REINFORCEMENT:
Deformed Bars: FY = 60 KSI ASTM A615 Weldable Deformed Bars: FY = 60 KSI ASTM A706 Welded Wire Fabric: FY = 70 KSI ASTM A185 Micro/Macro Synthetic Fibers: ASTMC1116
2.3. STRUCTURAL STEEL:
Wide Flange Sections: FY = 50 KSI ASTM A992 Rect. Hollow Structural Shapes: FY = 50 KSI ASTM A500 C Round Hollow Structural Shapes: FY = 46 KSI ASTM A500 C Solid Column Sections: FY = 36 KSI ASTM A36 Other Shapes or Plates FY = 36 KSI ASTM A36 Bolts: ASTM A325/A490 Headed Studs: Fu = 65 KSI ASTM A108 Anchor Rods: FY = 36 KSI ASTM F1554 Welding Electrodes: FY = 70 KSI E70XX Non-Shrink Grout: f'c = 8,000 PSI ASTM C1107
2.4. STEEL DECK:
Roof Deck: FY = 33 KSI ASTM A653 Composite Deck: FY = 50 KSI ASTM A653
2.5. COLD-FORMED STEEL: See ASTM A1003.
54 mil (16 Gage) and Heavier: FY = 50 KSI 43 mil (18 Gage) and Lighter: FY = 33 KSI
2.6. STRUCTURE EXPOSED TO WEATHER:
2.6.1. All structural steel and embed plates exposed
to weather or located in parking areas shall be hot-dip galvanized unless noted otherwise.
2.6.2. Field welds shall be touched up with 2 coats of
zinc rich paint.
4. CONCRETE:
4.1. REFERENCES:
ACI 315 ACI Detailing Manual ACI 318 Building Code Requirements for
Reinforced Concrete CRSI MSP Manual of Standard Practice AWS D1.4 Structural Welding Code - Reinforcing Steel CRSI Recommended Practice for Placing
Reinforcing Bars PCI Design Handbook: Precast and Prestressed Concrete
4.2. REINFORCING STEEL:
4.2.1. The reinforcing steel Contractor shall
fabricate all reinforcement and furnish all accessories, chairs, spacer bars and supports necessary to secure the reinforcement unless shown otherwise on the plans and/or details.
4.2.2. Concrete reinforcement shall be placed
according to ACI and CRSI "Recommended Practice for Placing Reinforcing Bars".
4.2.3. Minimum Clear Cover For Concrete Reinforcement:
Concrete Over Metal Deck . . . . . Centered in Slab
4.2.4. See typical detail for required bar development
lengths and lap splice lengths.
4.2.5. All welded wire fabric shall have one full
space plus 2" at splices and wire together.
4.2.7. No welding of reinforcement shall be permitted
unless specifically called for or reviewed by the Structural Engineer. Where welding is permitted, all welding of reinforcing bars shall conform to: "Structural Welding Code - Reinforcing Steel". A chemical analysis of the reinforcing bars to be welded shall be submitted for review.
4.3. ANCHORING TO CONCRETE
4.3.1. Headed studs shall be Nelson H4L or S3L with Fu
= 65 ksi, or approved equal, unless noted otherwise.
4.3.2. Deformed bar anchors shall be Nelson D2L with
FY = 70 ksi or approved equal, unless noted otherwise.
4.3.3. Post-installed anchors shall be installed by
qualified personnel in accordance with the Manufacturer's Printed Installation Instructions.
4.3.4. Expansion anchors shall not be loaded until
concrete has achieved a minimum age of 7 days. Adhesive anchors shall not be loaded until concrete achieved a minimum age of 21 days.
4.3.5. Expansion anchors shall be Hilti Kwik Bolt TZ
or approved equal, unless noted otherwise. Embedment shall be as follows unless noted otherwise:
Diameter Embedment Diameter Embedment 3/8" 2" 5/8" 4" 1/2" 3 1/4" 3/4" 4 3/4"
4.3.6. Adhesive anchors shall be Hilti HIT-RE 500 V3
or HIT-HY 200 with HAS Standard rods or approved equal, unless noted otherwise. Embedment shall be as follows unless noted otherwise:
Diameter Embedment Diameter Embedment 3/8" 3 3/8" 5/8" 5 5/8" 1/2" 4 1/2" 3/4" 6 3/4"
4.3.7. Epoxy for dowels drilled into concrete shall be
Hilti HIT-RE 500 V3, HIT-HY 200, or approved equal, unless noted otherwise. Embedment shall be as follows unless noted otherwise:
Bar Embedment Bar Embedment # 3 3 1/4" # 5 5 3/4" # 4 4 3/8" # 6 6"
4.3.8. Anchor capacity is dependent upon spacing
between adjacent anchors and proximity of anchors to edge of concrete. Install anchors in accordance with spacing and edge clearances indicated on the drawings.
4.3.9. Contractor shall verify the location of
reinforcing bars and/or prestressing tendons via GPR, X-
Ray, or other means before drilling anchor holes.
Reinforcing steel shall not be damaged.
5. STEEL:
5.1. REFERENCES:
Steel Construction Manual, 14th Edition
5.2. STRUCTURAL STEEL:
5.2.1. All beams shall be marked and erected with
natural camber upwards.
5.2.2. Do not prime structural steel members that will
receive spray-applied fireproofing. Do not prime surfaces of structural steel members that will be in contact with poured concrete or will receive welded studs.
5.2.3. The top and bottom of all steel columns that
are in bearing shall be finished to a common plane.
5.2.4. All headed studs are to be welded to the steel
section using an electric arc welding gun.
5.3. CONNECTIONS:
5.3.1. Connections shall be as shown on the drawings.
Where connections are not explicitly detailed, fabricator shall design the connections in accordance with AISC 360 using LRFD methods.
5.3.2. The fabricator shall submit engineering
calculations for all connections not explicitly detailed in the drawings to the Engineer for review. These submittals shall be signed and stamped by a professional engineer registered in the state where the project is located.
5.3.3. Connections shall be designed for the minimum
design shear shown in the Beam Connection Schedule unless end reactions, shown on drawings, exceed minimum design shear. Where end reactions are not shown on plan, use minimum design shears listed in the schedule.
5.3.4. All beam reactions, axial forces, and moments
act concurrently unless noted otherwise. Beam reactions act in gravity direction while axial and moment forces are to be considered reversible.
5.3.5. All bolts shall be either A325 or A490 high
strength bolts. Use no more than two bolt diameters, one grade per diameter, skip one size between diameters.
5.3.6. All high strength bolts shall be installed in
snug-tightened joints unless noted otherwise on the drawings. Fabricator may substitute ASTM F1852 N for A325 N bolts. Where slip critical joints are shown on the drawings, Class A faying surfaces shall be used. Slip shall be checked at the factored-load level.
5.3.7. Weld metal used shall be 70 KSI.
5.3.8. All welding shall be performed by AWS qualified
operators.
5.3.9. All welded joints shall be prequalified or
qualified by testing.
5.3.10. When welded connections are shown in the
drawings, it is not the intent to specify the specific process or preparation.
5.3.11. Do not prime surfaces of structural steel
members in areas that will be welded.
5.5. STEEL DECK:
5.5.1. REFERENCE: Steel Deck Institute; "Design Manual
for Composite Decks, Form Decks and Roof Decks," latest edition.
5.5.2. Roof and floor deck is designed to act as a
diaphragm to brace other building components. No portion shall be removed unless separate bracing is designed and provided.
5.5.3. Any openings or holes larger than 12" not shown
on the plans will not be permitted unless reviewed by the Architect/Engineer.
5.5.4. The deck supplier shall provide deck
accessories such as pour stops, cell closure plates, deck supports at columns and other miscellaneous deck items as required, even if not specifically shown on the Contract Documents.
5.5.5. Roof deck end joints shall have 6" minimum end
laps.
5.5.6. The Contractor shall be cognizant of allowable
construction live loads and plan concrete placing operations accordingly so as to not overstress or damage the composite or form deck. Contractor shall verify with deck manufacturer that the proposed concrete placing operation is compatible with the type, gauge, span, and length of the composite or form deck as furnished.
5.5.7. Deck supplier shall verify that shoring is not
required to support the wet weight of concrete for the deck type, gauge, span, and layout provided.
5.5.8. Concrete shall be placed on deck in accordance
with ACI 302. Slabs shall be screeded to maintain the minimum thickness shown on the drawings and proper top of slab elevation. Contractor shall include allowance for additional concrete quantities due to the deflected shape of non-cambered horizontal framing members.
5.5.9. Electrical conduit shall not be placed in
composite slabs.
5.5.10. Composite deck shall be galvanized or
phosphatized and painted.
6. MISCELLANEOUS:
6.1. DEFERRED STRUCTURAL SUBMITTALS
6.1.1. The design and documentation of some components
defined using performance-based specifications may be deferred until after a building permit is obtained.
6.1.2. Deferred submittals include, but are not
limited to, the items listed below.
6.1.3. For the following deferred submittals, the
Contractor shall submit shop drawings and calculations signed and stamped by a professional engineer registered in the state where components are installed. These shall be submitted for review prior to fabrication.
Stairs Guardrails and Handrails Structural Steel Connections Supports for Medical Equipment
6.3. ANCHOR RODS:
6.3.1. All anchor rods for mechanical and electrical
equipment shall be furnished and located by the respective Subcontractors and set by the General Contractor except where the other Subcontractors furnish their own concrete pads.
6.4. NON LOAD BEARING PARTITION WALLS:
6.4.1. Non load bearing partition walls are generally
not shown on the structural drawings. Care shall be taken by the Contractor to maintain a deflection space between the top of partition walls and floor or roof structure above.
6.4.2. See Typical Details and deflection requirements
of horizontal framing members in Section 1 of these Notes for minimum deflection space between top of non load bearing partition walls and overhead structure.
6.5. VERIFICATIONS:
6.5.1. The General Contractor shall verify all
openings sizes, pad sizes, and locations with the respective Subcontractors.
6.5.2. Structural steel supplier and erector are
responsible for providing deck reinforcement or framing as shown on typical structural details for mechanical roof openings. See mechanical drawings for quantities, sizes and locations. The cost of structural redesign fees shall be borne by the Mechanical Contractor for equipment and/or opening changes made after structural documents have been issued.
6.6. CORE DRILLING:
6.6.1. All core drilling shall be done by the
Mechanical and Electrical Subcontractors for their own work under the supervision of the General Contractor. No reinforcing steel shall be cut. Verify location of reinforcing steel before core drilling. Do not core through beams or columns. The maximum core hole through slabs shall be 12". If these requirements cannot be met, contact the Engineer.
6.7. NEW WORK IN CONJUNCTION WITH EXISTING CONSTRUCTION:
6.7.1. VERIFICATION: The Contractor shall verify, by
field check, all sizes, dimensions, elevations, locations, etc. of elements of the existing construction which are relative to the new construction.
6.7.2. DIMENSIONS: All dimensions involving new Work
tying into or governed by existing construction shall be field checked by the Contractor and furnished to the Subcontractors prior to fabrication of any Work. The verified dimensions shall appear and be noted as such on the first shop drawing submitted.
6.7.3. ASSUMPTIONS: The Engineer has made assumptions
concerning the soundness of the existing buildings and these assumptions are that this building was designed and constructed in conformity with good design and construction practices. The Contractor shall take extraordinary precautions concerning preservation of the building during demolition and new construction Work.
Further, the Contractor shall agree to assume all responsibility for the preservation of this property.
6.7.4. NOTIFICATION: The Contractor shall notify the
Architect/Engineer immediately of any discrepancies between construction documents and actual field conditions.
6.7.5. HOLES: All holes through existing construction
shall be core drilled or saw cut.
6.7.6. NEW OPENINGS IN EXISTING SLABS: New openings in
existing slabs shall be cut in such a manner as to minimize cutting existing slab reinforcement. The slab shall not be overcut unless approved by the Engineer.
6.8. GENERAL:
6.8.1. These drawings do not include necessary
components for construction safety.
6.8.2. The structural design is based only on the
building in its completed state. Contractors and their subs shall take whatever precautions are necessary to withstand all horizontal and vertical loadings that may be encountered during the construction prior to completion of the building.
6.8.3. During construction, the Contractor may
encounter existing conditions which are not now known or are at variance with project documentation (Discovery).
Such conditions may interfere with new construction or required protection and/or support of existing Work during construction, or may consist of damage or deterioration to structural materials or components which could jeopardize the structural integrity of the building(s).
6.8.4. The Contractor shall notify the Engineer of all
Discoveries that the Contractor believes may interfere with proper execution of the Work or jeopardize the structural integrity of the building(s) prior to proceeding with Work related to such Discoveries.
STEP FOOTING
NEW GRID
EXISTING GRID
MATCHLINE
WALL REINFORCEMENT
NORTH ARROW
SLAB RECESS
SLAB JOINT
ELEVATION
METAL DECK &
DECK SPAN
COMPOSITE SLAB
& DECK SPAN
SPAN DIRECTION
EXISTING
EXTENT ARROW
AXIAL CONNECTION
REVISION-
LINTEL
OPENING
S S
STAIR
NORTH
D-
CS-
BOTTOM FLANGE BRACING
EA EACH
EF EACH FACE
ELEC ELECTRICAL
ENGR ENGINEER
EL ELEVATION
ELEV ELEVATOR
EOD EDGE OF DECK
EOR ENGINEER OF RECORD
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
ERECT ERECTION
EW EACH WAY
EXIST, (E) EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDN/FND FOUNDATION
FL/FLR FLOOR
FRMG FRAMING
FRT FIRE RETARDANT TREATED
FS FAR SIDE
FT FOOT (FEET)
FTG FOOTING
GALV GALVANIZED
GA GAGE
GC GENERAL CONTRACTOR
GB GRADE BEAM
HD HEADED
HDR HEADER
HK HOOK
HT HEIGHT
HS HIGH STRENGTH
HSS HOLLOW STRUCTURAL TUBE
HORIZ HORIZONTAL
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH(S)
INFO INFORMATION
INT INTERIOR
JT OR JNT JOINT
JST JOIST
JBE JOIST BEARING ELEVATION
JSD JOIST SEAT DEPTH
K KIP (1,000 POUNDS)
K/FT KIPS PER FOOT
KLF KIPS PER LINEAL FOOT
K/SF KIPS PER SQUARE FOOT
L ANGLE
LB POUND
LG LENGTH, LONG
LL LIVE LOAD
LOC LOCATION
LONG LONGITUDINAL
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LWT LIGHT WEIGHT
MAX MAXIMUM
MCJ MASONRY CONTROL JOINT
MEP / MECH MECHANICAL, ELECTRICAL,
PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
(N) NEW
NEC NECESSARY
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NWT NORMAL WEIGHT
OC ON CENTER
OPNG OPENING
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
/ PER
PC PRECAST
PERP PERPENDICULAR
PL PLATE
PROJ PROJECTION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POST-TENSIONED
PVC POLYVINYL CHLORIDE
R RADIUS
REF REFERENCE
REINF REINFORCEMENT
REQD REQUIRED
REV REVERSE/REVISION
RD ROOF DRAIN
RO ROUGH OPENING
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SIP STRUCTURAL INSULATED PANEL
SJI STEEL JOIST INSTITUTE
SOG SLAB ON GRADE
SPA SPACES
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STIFF STIFFENER
STIR STIRRUPS
STRUCT STRUCTURAL
TBE TOP OF BEAM ELEVATION
TDE TOP OF DECK ELEVATION
TEMP TEMPORARY
TEMP STL TEMPERATURE STEEL
TFE TOP OF FOOTING ELEVATION
THK THICK
T & B TOP AND BOTTOM
TO, T/ TOP OF
TOS TOP OF STEEL
TOSL TOP OF SLAB
TRANSV TRANSVERSE
TWE TOP OF WALL ELEVATION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
W, w WIDTH
W/ WITH
W/O WITH OUT
WP WORK POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
ADD ADDENDUM
ADDL ADDITIONAL
ALT ALTERNATE
ANCH ANCHOR (ANCHORAGE)
ARCH ARCHITECT, ARCHITECTURAL
@ AT
BSMT BASEMENT
BM BEAM
BRG BEARING
BTWN BETWEEN
BLK BLOCK
BB BOND BEAM
BOT,BO,B/ BOTTOM
BFE BOTTOM FOOTING ELEVATION
BLKG BLOCKING
BLDG BUILDING
CANT CANTILEVER
CIP CAST IN PLACE
CLG CEILING
CTR CENTER
CL CENTERLINE
CLR CLEAR
COL COLUMN
COMP COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONN CONNECTION(S)
CONST CONSTRUCTION
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
db REINFORCING BAR DIAMETER
DBL DOUBLE
DEFL DEFLECTION
DEG DEGREES
DL DEAD LOAD
D, d DEPTH
DET DETAIL
DIAG DIAGONAL
DIA DIAMETER
DIM DIMENSION
DWL(S) DOWEL(S)
DN DOWN
DWG DRAWING
STRUCTURAL ABBREVIATIONS
BP# = BASE PLATE
BRP# = BEARING PLATE
B# OR B#-### = CONCRETE BEAM
CC# = CONCRETE COLUMN
CCB# = CONCRETE COUPLING BEAM
J# OR J#-### = CONCRETE JOIST
CP# = CONCRETE PIER
DP# = DRILLED PIER
DPC# = DRILLED PIER CAP
EP# = EMBED PLATE
GB# = GRADE BEAM
F# = ISOLATED FOOTING
L - M# OR = LINTEL
L - S#
MP# = MASONRY PIER
PF# = PILE FOUNDATIONS
PB# = POST-TENSION BEAM
PC# = PRECAST COLUMN
RWF# = RETAINING WALL FOOTING
SC# = STEEL COLUMN
SH# = STEEL HANGER
SP# = STEEL POST
SR# = SPECIAL CMU REINFORCEMENT
WF# = WALL FOOTING
TYPICAL MARKS
SHEAR WALL REINFORCEMENT--
BEAM WEB
PENETRATION MARK-
OVERALL PROJECT NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot on e q ua rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e q ua rte rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot 6" th re e in ch es o ne fo ot
6"
CONSTRUCTION
DOCUMENTS
FOR OFFICIAL USE ONLY
SIOUX FALLS VA HEALTH CARE
SYSTEM CAMPUS IMPROVE
CAMPUS BUILDING EXTERIORS
SIOUX FALLS, SOUTH DAKOTA
OVERALL
VA #438-22-600
ERA #20221954
STAMPARCHITECT OF RECORD
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
CONSULTANTS
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:STRUCTURAL:CIVIL:
Ehrhart Griffin & Associates 601 N Minnesota Ave Sioux Falls, SD 57104 Phone: 605-339-7215
0.S001
STRUCTURAL COVER SHEET &
GENERAL STRUCTURAL NOTES
TDN CS/MJD09-15-2023
.09 .15
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
Revision # Description Date:
9/15/2023
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
Digitally signed by Jason Gottwalt Date: 2023.09.14 09:10:45-05'00'
CN=Jay D Rohkohl, dnQualifier=A01410D0000017C950EE3A30000BD89, O=DUNHAM ASSOCIATES, C=US
2023.09.14 09:38:02-05'00'
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
VHASUXWhiteB Cross-Out
5n
5o.NORTH
5h 5g
5i 5f
5e
5d 5b
5c 5j
5k
5a
5o.SOUTH
5l
5m
5p
5q
5r
5s
BUILDING 5e
NO SCOPE
(E) ROOF OPNG
TO BE INFILLED
05.SE121
2TYP @
INFILL
(E) OPENING TO
REMAIN
BUILDING 5J
BUILDING 5K
NO SCOPE
BUILDING 5C
NO SCOPE
(F
IE
LD
VE
RI
FY
3 1
/2"
G.C. TO VERIFY EXIST
CONC DECK DEPTH WITH
EOR PRIOR TO CONSTRUCTION
2" NW CONCRETE OVER
1 1/2" 22 GA GALV METAL
COMPOSITE DECK
3 1/2" TOTAL THICKNESS
REINF W/ FIBER MESH REINF OR
6 X 6 X W2.9 X W2.9 WWF
BOTTOM ANGLE
L3 X 3 X 5/16
(EA SIDE 4-THUS)
TOP ANGLE
L4 X 3 X 5/16 (LLH)
(EA SIDE 4-THUS)
ATTACH UPPER ANGLE TO
EXISTING CONCRETE W/
3/8" DIA X 2 1/2" LONG
SIMPSON STRONG TIE
COUNTER SINK TITEN HD ANCHOR
(3 PER SIDE) THD37212CS
(N) DECK TO SPAN SHORT DIRECTION
EXIST OPNG (FIELD VERIFY)
1/4 3 - 12
ALL SIDES
NOTES:
1. NOTIFY EOR IF OPENING LARGER THAN 4'-0"
IN ANY ONE DIRECTION.
2. SEE ARCH FOR ROOFING REQUIREMENTS.
BUILDING 5 ROOF OPENING - OPTION A CONCRETE OVER METAL DECK INFILL IN EXISTING CONCRETE DECK
(F
IE
LD
V
E R
IF
Y) 3 1
/2"
G.C. TO VERIFY EXIST
CONC DECK DEPTH WITH
EOR PRIOR TO CONSTRUCTION
3/8" STL PLATE 4" LARGER
THAN OPENING EA SIDE
ATTACH PLATE TO
EXISTING CONCRETE W/
3/8" DIA X 2 1/2" LONG
SIMPSON STRONG TIE
COUNTER SINK TITEN HD ANCHOR
(3 PER SIDE) THD37212CS
NOTES:
1. NOTIFY EOR IF OPENING LARGER THAN 4'-0"
IN ANY ONE DIRECTION.
2. SEE ARCH FOR ROOFING REQUIREMENTS.
BUILDING 5 ROOF OPENING - OPTION B METAL PLATE INFILL OVER EXISTING CONCRETE DECK
EXIST OPNG (FIELD VERIFY)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot on e q ua rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e q ua rte rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot 6" th re e in ch es o ne fo ot
6"
CONSTRUCTION
DOCUMENTS
FOR OFFICIAL USE ONLY
SIOUX FALLS VA HEALTH CARE
SYSTEM CAMPUS IMPROVE
CAMPUS BUILDING EXTERIORS
SIOUX FALLS, SOUTH DAKOTA
VA #438-22-600
ERA #20221954
STAMPARCHITECT OF RECORD
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
CONSULTANTS
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:STRUCTURAL:CIVIL:
Ehrhart Griffin & Associates 601 N Minnesota Ave Sioux Falls, SD 57104 Phone: 605-339-7215
05.SE121
STRUCTURAL - ROOF PLAN - 5J
TDN CS/MJD09-15-2023
1/8" = 1'-0"05.SE121
1 ROOF PLAN - 5J
NORTH
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
1" = 1'-0"05.SE121
2 SECTION/ DETAIL
NORTH
1" = 200'-0"
KEY PLAN
9/15/2023
5n
5o.NORTH
5h 5g
5i 5f
5e
5d 5b
5c 5j
5k
5a
5o.SOUTH
5l
5m
5p
5q
5r
5s
TYP @ NEW ROOF
DRAINS - (2) LOCATIONS
THUS (COORDINATE W/
ARCH & MECH FOR
LOCATIONS)
05.SE122
BUILDING 5G & 5I
NO SCOPE
BUILDING 5G & 5I
NO SCOPE
5' - 0" TYP (FIELD VERIFY)
(E ) J
OI
ST
(F
IE
LD
V
ER
IF
Y)
(E ) J
OI
ST
(F
IE
LD
V
ER
IF
Y)
L3 X 3 X 1/4 WELDED
FRAMES ARE TYPICAL
AT ALL ROOF OPENINGS
(FIELD WELD FRAME TO
ALL SUPPORTING
STRUCTURE WITH 3/16"
FILLET ALL CONTACTS)
NOTE: VERIFY DRAIN LOCATIONS
W/ (E) FRAMING PRIOR TO FABRICATING
ANGLES. OK TO SHIP MEMBERS LONG AND
FIELD CUT TO FIT.
(SEE MEP)
FOR DRAIN LOCATION
(SEE MEP)
FOR FRAIN LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot on e q ua rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e q ua rte rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot 6" th re e in ch es o ne fo ot
6"
CONSTRUCTION
DOCUMENTS
FOR OFFICIAL USE ONLY
SIOUX FALLS VA HEALTH CARE
SYSTEM CAMPUS IMPROVE
CAMPUS BUILDING EXTERIORS
SIOUX FALLS, SOUTH DAKOTA
VA #438-22-600
ERA #20221954
STAMPARCHITECT OF RECORD
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
CONSULTANTS
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:STRUCTURAL:CIVIL:
Ehrhart Griffin & Associates 601 N Minnesota Ave Sioux Falls, SD 57104 Phone: 605-339-7215
05.SE122
STRUCTURAL - ROOF PLAN - H
TDN CS/MJD09-15-2023
1/8" = 1'-0"05.SE122
1 ROOF PLAN - 5H
NORTH
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
3/4" = 1'-0"05.SE122
2 SECTION/ DETAIL
1" = 200'-0"
KEY PLAN
NORTH
5n
5o.NORTH
5h 5g
5i 5f
5e
5d 5b
5c 5j
5k
5a
5o.SOUTH
5l
5m
5p
5q
5r
5s
WELDED ANGLE FRAME
L3 X 3 X 1/4 (DECK BEARING)
CONNECT TO (E) STL W/ 1/4"
FILLET X 3" LONG MIN EA END
NEW ACCESS
ROOF HATCH
(SEE 6 / 05.SE123)
(E) W6 X 12 (FIELD VERIFY)
(E) L3 X 3 X 1/4 (FIELD VERIFY)
(E) L2 1/2 X 2 1/2 X 3/16
(FIELD VERIFY)
(E) L3 X 3 X 1/2 (FIELD VERIFY)
(E) L3 X 3 X 1/4 (FIELD VERIFY)
L3 1/2
X 3 1 /2 X
1/4
(FIELD
VERIFY)
(E ) L
2 1 /2
X 2 1
/2 X
3/1
(F
IE
LD
V
ER
IF
Y)
(F
IE
LD
VE
RI
FY
3'
- 6
OPNG
(E) CL JOIST
OR BEAM
(E) STL JOIST OR
STL BEAM
(SEE PLAN)
L3 X 3 X 1/4 FIELD WELD
TO HEADER ANGLES
(SPA 6'-0" MAX)
HEADER L3 X 3 X 1/4
(SPA 6'-0" MAX)
NOTES:
1. SEE STRUCTURAL PLANS FOR ROOF OPENING LOCATIONS KNOWN AT
TIME OF ISSUE.
2. SEE ARCH, MECH, AND ELECT DRAWINGS FOR QUANTITIES, SIZES,
AND LOCATIONS OF DECK OPENINGS.
3. METAL DECK OMITTED FOR CLARITY. SEE PLAN / SCHED FOR
WELDING PATTERNS. SEE O.S.H.A. FOR SAFETY REQUIREMENTS
L3 X 3 X 1/4 (TYP)
3"3"
3/16 2
TYP
NOTE:
NOT ALL OPENINGS ARE SHOWN
ON PLAN. VERIFY SIZE, NUMBER
& LOCATION OF ALL OPENINGS
W/ MECH, ELECT & GENERAL
CONTRACTOR. OPENINGS GREATER
THAN 6'-0" IN ANY DIRECTION
REQUIRE SPECIALLY DESIGNED
FRAMING. NOTIFY ENGINEER.
(SEE PLAN)
6'-0" MAX OPNG
6'- 0"
M
AX
DECK SPAN
' X '
WHERE DIM 'X' IS 10"
OR LESS ANGLE CAN
BE OMITTED
1-RIB CUT (NO REINF REQD)
2-RIB CUT (REINF W/ PL 3/16")
CUT HOLE AS REQD
OPNG
NOTE: RIBS ARE SPACED
AT 6" CENTERS
3 OR MORE RIBS CUT OR
AT OPNG FOR ROOF DRAIN,
PROVIDE L FRAMES AS
SHOWN BELOW
WHEN CUTTING 2-RIBS
PROVIDE PL 3/16" X 24" X 2'-0"
W/ #10 TEK SCREWS @ 6"OC
(E) MTL DECK
3/16 2
TYP
AVOID SUPPORT BEAMS BELOW
CORE DRILL OPENING FOR NEW
DRAIN PIPE 7" DIA MAX
(VERIFY SIZE W/ MEP)
AVOID SUPPORT BEAMS
BELOW CORE DRILL
OPENING FOR NEW DRAIN
PIPE 7" DIA MAX
(VERIFY SIZE W/ MECH)
(E) CONC OVER
METAL DECK
(FIELD VERIFY)
AVOID SUPPORT BEAMS
BELOW CORE DRILL
OPENING FOR NEW DRAIN
PIPE 7" DIA MAX
(VERIFY SIZE W/ MECH)
(E) CONC OVER
METAL DECK
(FIELD VERIFY)
INFILL (E) FLOOR PENETRATION
AT PIPE W/ 4,000PSI NON SHRINK
GROUT (SEE 7 / 05.SE123)
8" X 8" +/-
(E) SLAB CONCRETE
OVER 1 1/2" COMP
METAL DECK - 5" TOTAL
THICKNESS (FIELD VERIFY)
1/4" TAPCON
ANCHORS W/ 2" MIN
EMBED TOP & BOT
PLATES (6 EA SIDE)
NEW 20 GA GALV
COMP DECK TO
MATCH PROFILE OF
(E) DECK (CENTER ON
EXIST OPENING TO BE
INFILLED)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot on e q ua rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e q ua rte rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot 6" th re e in ch es o ne fo ot
6"
CONSTRUCTION
DOCUMENTS
FOR OFFICIAL USE ONLY
SIOUX FALLS VA HEALTH CARE
SYSTEM CAMPUS IMPROVE
CAMPUS BUILDING EXTERIORS
SIOUX FALLS, SOUTH DAKOTA
VA #438-22-600
ERA #20221954
STAMPARCHITECT OF RECORD
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
CONSULTANTS
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:STRUCTURAL:CIVIL:
Ehrhart Griffin & Associates 601 N Minnesota Ave Sioux Falls, SD 57104 Phone: 605-339-7215
05.SE123
STRUCTURAL - ROOF PLAN - M, N
TDN CS/MJD09-15-2023
1/4" = 1'-0"05.SE123
2 ROOF PLAN - N
NORTH
NO SCALE05.SE123
6 ROOF FRAME FOR OPNG IN (E) MTL ROOF DECK
1/4" = 1'-0"05.SE123
5 ROOF PLAN - M
NORTH
1/4" = 1'-0"05.SE123
4 4TH LEVEL FLOOR PLAN - M
NORTH
1/4" = 1'-0"05.SE123
3 3RD LEVEL FLOOR PLAN - M
NORTH
1/4" = 1'-0"05.SE123
1 4TH LEVEL FLOOR PLAN - N
NORTH
1" = 1'-0"05.SE123
7 SECTION/ DETAIL
NORTH
1" = 200'-0"
KEY PLAN
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
5n
5o.NORTH
5h 5g
5i 5f
5e
5d 5b
5c 5j
5k
5a
5o.SOUTH
5l
5m
5p
5q
5r
5s
AVOID CONCRETE SUPPORT BEAMS
BELOW (CORE DRILL OPENING FOR
NEW DRAIN PIPE 7" DIA MAX)
(VERIFY SIZE W/ MECH)
GUARDRAIL / RAILING
(SEE ARCH)
GUARDRAIL / RAILING
(SEE ARCH)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot on e q ua rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e q ua rte rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot 6" th re e in ch es o ne fo ot
6"
CONSTRUCTION
DOCUMENTS
FOR OFFICIAL USE ONLY
SIOUX FALLS VA HEALTH CARE
SYSTEM CAMPUS IMPROVE
CAMPUS BUILDING EXTERIORS
SIOUX FALLS, SOUTH DAKOTA
VA #438-22-600
ERA #20221954
STAMPARCHITECT OF RECORD
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
CONSULTANTS
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:STRUCTURAL:CIVIL:
Ehrhart Griffin & Associates 601 N Minnesota Ave Sioux Falls, SD 57104 Phone: 605-339-7215
05.SE124
STRUCTURAL - ROOF PLAN - S
TDN CS/MJD09-15-2023
1/4" = 1'-0"05.SE124
1 ROOF PLAN - S
NORTH
NORTH
1" = 200'-0"
KEY PLAN
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
Revision # Description Date:
5s
5n
5o.NORTH
5h 5g
5i 5f
5e
5d 5b
5c 5j
5k
5a
5o.SOUTH
5l
5m
5p
5q
5r
5s
(N) PORTAL FRAME
(FIELD VERIFY LOCATION)
NOTE:
1.) FIELD VERIFY REQ'D OPENING
SIZE PRIOR TO MEMBER
FABRICATION.
2.) OK TO SHIP MEMBERS LONG &
FIELD CUT TO FIT
3.) ONCE INSTALLED, VERIFY W/ ARCH
IF FRAME TO BE INFILLED W/
EXPANDING FOAM INS.
05.SE126
(SEE ARCH)
(S
EE
A
RC
H)
HSS8 X 2 X 1/4
HSS12 X 2 X 1/4
HSS8 X 2 X 1/4
PROVIDE WELDED MITERED
CORNERS (1/4" FILLET MIN
ALL AROUND)
05.SE126
(E) WALL
(VIF)
05.SE126
05.SE126
OPENING
(SEE ARCH)
GROUT (E) CORES
SOLID (16" X 16")
5/8" DIA HILTI KWIK
BOLT TZ2 MASONRY
ANCHORS (OR EQUAL)
PROVIDE 4" EMBED)
3 EA SIDE
2"
OPENING
(SEE ARCH)
1' - 2" (VIF)
HSS8 X 2 X 1/4
1/4 3 @ 12
(E) MASONRY WALL
(VIF)
1/2" DIA HOLE @ 18" OC
1/4" X 14 (VIF) X CONT
STL PL
1/4
9 3 /4"
4 1 /4"
3 1 /2"
1/4"
1/4" X 17 1/2 X 3' - 4 1/2"
BASE PLATE
3' - 4 1/2" VIF
1 1/4"
HSS8 X 2 X 1/4
1'
- 5
1/ 2"
3" 3' - 10 1/2" VIF 3"
1 1/4"
NOTE: PROVIDE 1" NON-SHRINK
GROUT BELOW BASE PL TO TOP
(E) MASONRY (VIF)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot on e q ua rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e q ua rte rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot 6" th re e in ch es o ne fo ot
6"
CONSTRUCTION
DOCUMENTS
FOR OFFICIAL USE ONLY
SIOUX FALLS VA HEALTH CARE
SYSTEM CAMPUS IMPROVE
CAMPUS BUILDING EXTERIORS
SIOUX FALLS, SOUTH DAKOTA
VA #438-22-600
ERA #20221954
STAMPARCHITECT OF RECORD
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
CONSULTANTS
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:STRUCTURAL:CIVIL:
Ehrhart Griffin & Associates 601 N Minnesota Ave Sioux Falls, SD 57104 Phone: 605-339-7215
05.SE126
STRUCTURAL - ROOF PLAN P.UPPER
TDN CS/MJD09-15-2023
1/8" = 1'-0"05.SE126
1 ROOF PLAN - P UPPER
NO
RT
H
1" = 1'-0"05.SE126
2 SECTION/ DETAIL
1 1/2" = 1'-0"05.SE126
4 SECTION/ DETAIL
1 1/2" = 1'-0"05.SE126
3 SECTION/ DETAIL
1 1/2" = 1'-0"05.SE126
5 SECTION/ DETAIL
NORTH
1" = 200'-0"
KEY PLAN
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
A
M
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
A
M
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
A
M
C
S G
A R ev it
Lo ca l\B U
IL
D
IN
G
5_
M ic ha el
A lb
.r vt
9/
/2
:2 2:
File details come from the government source that posted it. Updated .