This document summarizes a presentation given at a pre-solicitation industry day virtual conference for an upcoming Project Management Oversight indefinite delivery, indefinite quantity contract opportunity with the Department of Transportation's Federal Transit Administration. The conference overview included details on the upcoming solicitation such as a planned release date in the first quarter of fiscal year 2024, with proposals due approximately 60 days later and awards expected in the fourth quarter of 2024. Services will involve program support, on-site monitoring and reporting, baseline and optional oversight. At least two contracts will be set aside for women-owned small businesses. Offerors must register in the System for Award Management and have an adequate accounting system. Subcontracting plans will be required and must include small business prime and subcontracting goals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tuesday, August 29, 2023
2:00PM – 4:30PM EST
Department of Transportation Federal Transit Administration
Pre-Solicitation/Industry Day Virtual Conference Project Management Oversight Services
Welcome and Opening Remarks
Mr. James Harper, Jr.
Director of Acquisition Management
Acquisition Team Members
Mr. James Harper, Jr., Director of Acquisition Management Dorian Ridley-Curtis – PMO Division Chief/Contracting Officer, Office of Acquisition Management
Sonja Rousey – PMO Team Lead/Contracting Officer, Officer of Acquisition Management Corey Walker, Director, Office of Capital Project Management
Matthew Nawn – Chief, Technical Services Division, Office of Capital Project Management Mandy Wylie - Sr. Small Business Specialist & SDVOSB Advocate (OSDBU)
Brittany Young - Small Business Specialist & WOSB Advocate (OSDBU) LaStar Matthews – Contract Specialist, Office of Acquisition Management
Joary Casey-Khairudin – Contract Specialist, Office of Acquisition Management Tiffany Kennedy - Contract Specialist, Office of Acquisition Management Katrina Cypress - Contract Specialist, Office of Acquisition Management
LaTonya Peeples – Transportation Program Analyst, Office of Capital Project Management Anna Ross - Attorney Advisor, Office of Chief Counsel
4FEDERAL TRANSIT ADMINISTRATION
AGENDA
Welcome and Opening Remarks James Harper, Jr.
Introductions of Presenters Government Team Acquisition Summary Dorian Ridley-Curtis/Sonja Rousey PMO Program Overview (SOW, OP’s, and COI) Matthew Nawn
Small Business Utilization Small Business Goals
Brittany Young
Questions and Answers James Harper, Jr./ Government Team Closing Remarks James Harper, Jr.
5FEDERAL TRANSIT ADMINISTRATION
RULES OF ENGAGEMENT
MS Teams Etiquette Session is being recorded Presentation, Q&A, Attendee List posted on https://sam.gov/content/home Understand that answers provided during this session are not deemed official and will not be binding to FTA Q&A Session end of presentation https://sam.gov/content/home
6FEDERAL TRANSIT ADMINISTRATION
DISCLAIMER
Materials presented and discussed at today’s Pre-Solicitation/Industry Day Virtual Conference are for informational purposes only
When FTA issues the formal Request for Proposal (RFP), it is the only document that should be relied upon in determining the Government’s requirements
The Formal RFP posted on System for Award Management (SAM) https://sam.gov/content/home supersedes any communication and presentation at today’s conference
All official requirements, information, and any resulting RFP will be posted on https://sam.gov/content/home
7FEDERAL TRANSIT ADMINISTRATION
QUESTION & ANSWER SESSION
Focus on the requirement and forth coming RFP Will not entertain questions that are:
Confidential Proprietary
If you have a question, please use the raise hand icon and you will be unmuted to speak in the order the question was received.
You may also type your question in the chat box.
Due to time constraints, if we do not get a chance to answer your question, please send it in an email to fta2024projectmanagementoversight@dot.gov All Q&As will be posted on https://sam.gov/content/home website mailto:fta2024projectmanagementoversight@dot.gov
8FEDERAL TRANSIT ADMINISTRATION
PURPOSE
Encourage Competition
Exchanges are encouraged
Improve Understanding/Industry Capabilities
Offerors make decision to propose
Government obtain quality and reasonably pricing
Increase efficiency and program objectives and goals
9FEDERAL TRANSIT ADMINISTRATION
Acquisition Summary Contract Overview
Dorian Ridley-Curtis/Sonja Rousey
10FEDERAL TRANSIT ADMINISTRATION
ACQUISITION SUMMARY
Title: Project Management Oversight
Place of Performance: Various locations, actual location will be stipulated in the awarded Task Order
Contract Vehicle: Multi-award Indefinite Delivery, Indefinite Quantity (IDIQ)
Contract Type: Various
NAICS Code: 541611 - Administrative Management and General Management Consulting Services
Product Service code: R408 Contract Period: 5 years from the Date of Award
Services will be performed in accordance with the FAR, TAR, and TAM
11FEDERAL TRANSIT ADMINISTRATION
CONTRACT OVERVIEW
FAR Part 15 - Full and Open Competition At least 2 IDIQ contracts will be reserved for Women-Owned Small
Businesses Cost Proposal shall be subject to an audit Release of RFP anticipated 1st Quarter FY 2024 Anticipated turn-around of 60 days for proposal submission Anticipated staggered awards 4th Quarter FY 2024
12FEDERAL TRANSIT ADMINISTRATION
SYSTEM FOR AWARD MANAGEMENT (SAM)
Offerors are required to be registered in SYSTEM for AWARD MANAGEMENT (SAM) DATABASE: Lack of registration in SAM will make an offeror ineligible for award as described in FAR 52.204-7. Do NOT delay
Offerors may obtain information on registration via:
https://sam.gov/content/home
Offerors must have electronic funds transfer (EFT) capability
13FEDERAL TRANSIT ADMINISTRATION
ACCOUNTING SYSTEM
Must have an adequate accounting system per General Accepted Accounting Principles (GAAP), Generally Accepted Government Auditing Standards (GAGAS), Federal Acquisition Regulation (FAR) and Cost Accounting Standards (CAS) in place
The accounting system will be audited The requirement for an adequate accounting system depends on the type of contract award not the contractor size Contracting Officer’s (CO) determination Information is available to contractors regarding data on an Adequate Accounting
System Requirements and standards are available at: http://www.dcaa.mil, click on "Customers," “Guidance,” and then click on “Audit Process Overview – Information for Contractors,” and also at: http://ww.dcaa.mil, click on "Customers," “Checklists and Tools,” and then “Pre-award Accounting System Adequacy Checklist” http://www.dcaa.mil/ http://ww.dcaa.mil/
14FEDERAL TRANSIT ADMINISTRATION
SECTIONS L AND M
Understanding and following Sections L and M are key to developing a good proposal; a mutually beneficial goal for award
Proposal Instructions – Section L of the RFP: Identifies what offerors shall put in the proposal
Evaluation Factors – Section M of the RFP: Identifies what will be evaluated
15FEDERAL TRANSIT ADMINISTRATION
PROPOSAL PREPARATION
CONSIDERATIONS
Submit and sign fully-executed RFP (amendments, if applicable) Complete Sections B (cost) through K (Certs/Reps) Follow proposal instructions Make sure the evaluator can easily find clear responses to the requirement Substantiate, don't simply make claims Provide detail information to allow an independent assessment
16FEDERAL TRANSIT ADMINISTRATION
BASIS FOR AWARD
Selection of the successful offerors will be on the basis of the proposal, which conforms to all the requirements of the solicitation and is considered most advantageous to the government, cost, and other factors considered
Failure to submit a proposal for all items listed in the RFP shall be cause for rejection of the proposal
17FEDERAL TRANSIT ADMINISTRATION
TYPICAL PROPOSAL SHORTFALLS
Not following instruction as outlined in the RFP Not providing all requested information Unsupported statements Unorganized proposal Proposed skillsets lacking the required technical requirements Compliance claims unsubstantiated Proposal is deemed non-responsive
18FEDERAL TRANSIT ADMINISTRATION
PMO Program Overview Matthew Nawn
20FEDERAL TRANSIT ADMINISTRATION
REQUIREMENT DESCRIPTION
The Office of Capital Project Management, within the Office of Program Management (TPM), develops and implements a program of project management oversight for major transit infrastructure projects. FTA’s project management oversight authorities are codified in 49 U.S.C.
5327-Project Management Oversight.
The objective of the PMO contracts is to provide FTA support in carrying out its project management oversight responsibilities. Project management oversight is the risk-informed monitoring of the recipient's management of a major capital project's progress to determine whether projects are on time, within budget, in conformance with design and quality criteria, in compliance with all applicable Federal requirements, constructed to approved plans and specifications, delivering the identified benefits, and safely, efficiently, and effectively implemented.
Key services include review of Project Management Plan’s (PMP) and the recipient’s management capacity and capability to ensure successful delivery of the project scope within budget, schedule, and in accordance with all applicable Federal requirements. Products and services delivered under this contract will assist FTA in accomplishing its Congressionally mandated mission.
21FEDERAL TRANSIT ADMINISTRATION
STATEMENT OF WORK
Contractors shall be responsible for performing professional services to include:
Delivering products and producing outcomes derived from enough reliable, relevant and useful third-party data Properly structured professional opinions and analysis
These services are administered under the following categories:
Program Support and Lessons Learned On-site monitoring and reporting Baseline Oversight Optional Oversight
22FEDERAL TRANSIT ADMINISTRATION
OVERSIGHT PROCEDURES
Current Oversight Procedures (OP) are provided on the FTA public website. The Request for Proposal will include updated OP’s.
Each OP is organized in the following manner:
1.0 Purpose of OP
2.0 Background
3.0 Objectives
4.0 References
5.0 Grantee Submittals
6.0 Scope of Work
7.0 Report, Presentation, and Reconciliation Guidelines
23FEDERAL TRANSIT ADMINISTRATION
CONTRACT AND TASK ORDER
MANAGEMENT
Contract and Task Order management is a mandatory element for all Task Orders awarded under the PMO contract. The objective of Contract and Task Order management is to provide the program management, project control and contract administration necessary to manage a high volume, multiple contract type Task Order process for a large, diversified team to ensure the cost, schedule and quality requirements of each order are tracked, communicated to the Government, and ultimately attained.
The Project Management Oversight Contractor shall only perform tasks, produce deliverables, and deliver services as required by awarded Task Orders. Task orders may include all or some of the tasks, deliverables, and or services as described in the Statement of Work.
24FEDERAL TRANSIT ADMINISTRATION
TYPES OF PMOC DELIVERABLES
Evaluation of Grantee’s Technical Capacity and Capability to Manage Projects
Review of Project Management Plan Site Visits and Monitoring Reports In-Depth Project Reviews Scope, Cost, and Schedule Reviews Risk Assessments Readiness Reviews Technical Reviews (Buy America, Real Estate, Fleet Management, Safety and Security, QA/QC, etc.)
Technical Assistance Special Tasks
25FEDERAL TRANSIT ADMINISTRATION
Office of Small and Disadvantage Business
Utilization Brittany Young
26FEDERAL TRANSIT ADMINISTRATION
OSDBU Mission
The United States Department of Transportation (USDOT), Office of Small and Disadvantaged Business Utilization’s (OSDBU) mission is to ensure Small Business policies and goals of the Secretary of Transportation are implemented in a fair, efficient and effective manner.
27FEDERAL TRANSIT ADMINISTRATION
Operating Administrations
Office of the Secretary Federal Aviation Administration Federal Highway Administration National Highway Traffic Safety Administration Federal Railroad Administration Federal Transit Administration Maritime Administration Federal Motor Carrier Safety Administration Pipeline Hazardous Materials Safety Administration Great Lakes Seaway Development Corporation https://www.transportation.gov/office-of-secretary https://www.faa.gov/ https://highways.dot.gov/ https://www.nhtsa.gov/ https://railroads.dot.gov/ https://www.transit.dot.gov/ https://www.maritime.dot.gov/ https://www.fmcsa.dot.gov/ https://www.phmsa.dot.gov/ https://www.seaway.dot.gov/
28FEDERAL TRANSIT ADMINISTRATION
OSDBU Organization Procurement Assistance Division Assist OSDBU Director in the implementation of Small Business Act Lead OSDBU Outreach efforts Procurement Forecast Mentor Protégé program Connections Marketplace (New) Regional Assistance Division Small Business Transportation Resource Centers Bonding Education Program Regional Small Business Summits (New) Disadvantaged Business Enterprise (DBE) & Airport Concessions DBE Program FHWA, FTA and FAA Goals set at grantee level Project specific goals
29FEDERAL TRANSIT ADMINISTRATION
FY22 SMALL BUSINESS GOALS
AND ACHIEVEMENTS
Socioeconomic Category Goal Achievement
Total SB Awards*
Small Business (SB) 34% 34.29% $2.5 B Woman-Owned Small Business (WOSB) 5% 7.92% $674.7 M
Small Disadvantaged Business (SDB) 5% 21.33% $1.8 B
Service-Disabled Veteran- Owned Small Business (SDVOSB) 3% 3.88% $330.6 M
HUBZone 3% 3.93% $334.3 M
*Source: SAM.GOV
30FEDERAL TRANSIT ADMINISTRATION
FY22 DOT SPEND
*in millions
*Source: SAM.GOV
$5,482
$1,277
$417
$287
$563
$392 Federal Aviation Administration
Federal Highway Administration
Immediate Office of the Secretary of Transportation National Highway Traffic Safety Administration
31FEDERAL TRANSIT ADMINISTRATION
FY22 TOP NAICS CODES
NAICS Code (Description) Total Dollars
541330 (ENGINEERING SERVICES) $1,607,254,876.65
237310 (HIGHWAY, STREET, AND BRIDGE CONSTRUCTION) $1,014,459,662.05
541519 (OTHER COMPUTER RELATED SERVICES) $459,412,775.57
541512 (COMPUTER SYSTEMS DESIGN SERVICES) $442,971,511.05
541611 (ADMINISTRATIVE MANAGEMENT AND GENERAL
MANAGEMENT CONSULTING SERVICES) $438,310,779.18
336611 (SHIP BUILDING AND REPAIRING) $427,755,830.34
483111 (DEEP SEA FREIGHT TRANSPORTATION) $415,724,643.37
541712 (RESEARCH AND DEVELOPMENT IN THE PHYSICAL,
ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)) $399,693,496.47
48811 (AIR TRAFFIC CONTROL) $265,064,919.51
*Source: SAM.GOV
32FEDERAL TRANSIT ADMINISTRATION
FY23 SMALL BUSINESS PRIME &
SUBCONTRACTING GOALS
U.S. DEPARTMENT OF TRANSPORTATION
FY2023 Small Business Goals
Socioeconomic Categories Prime Goals Subcontract Goals *
Small Business 33.40% 46% Small Disadvantaged Business (SDB) 21% 5% Woman Owned Small Business (WOSB) 5% 5% Service-Disabled Veteran Owned Small Business (SDVOSB) 3% 3%
HUBZone 3% 3%
* Small Business Subcontracting goals will be incorporated into the RFP
33FEDERAL TRANSIT ADMINISTRATION
SUBCONTRACTING PLANS
Subcontracting plans are required when:
Contract, including all options, is expected:
To be awarded to other than small business To exceed $750,000 ($1.5 million construction contracts) To have subcontracting opportunities FAR 19.7 and FAR Clause 52.219-9 Small businesses DOT NOT need to submit SB subcontracting plan
Follow the requirements as stipulated in FAR 19.704(a).
0% socio-economic goals will always be deemed "not acceptable" and challenged.
Approved prior to award by Contracting Officer, FTA Small Business Specialist, U.S. Small
Business Administration and OSDBU Made a material part of the contract at the time of award Failure to submit an acceptable Subcontracting Plan makes the offeror ineligible for award
34FEDERAL TRANSIT ADMINISTRATION
SUBCONTRACTING PLAN KEY
ELEMENTS per FAR 19.704
1. Separate Percentage Goals for all Socioeconomic Categories (see slide 8)
2. Subcontracting Amounts:
Total Dollars planned to be subcontracted Total Dollars planned to be subcontracted to each socioeconomic category (Does not have to = 100%)
3. Description of the principal types of supplies and services planned to be subcontracted to each group
4. Description of the method used to identify potential subcontracting sources
35FEDERAL TRANSIT ADMINISTRATION
SUBCONTRACTING PLAN KEY
ELEMENTS per FAR 19.704
5. Name and contact information of the Subcontracting Plan Administrator
6. Assurance that the company will:
Cooperate in any studies or surveys, and Submit in eSRS Individual Subcontract Report and Summary Subcontract
Report
SF294/295
7. Description of types of records maintained to demonstrate compliance
36FEDERAL TRANSIT ADMINISTRATION
RESOURCES
DOT-OSDBU – WWW.TRANSPORTATION.GOV/OSDBU
SUBSCRIBE TO US DOT SMALL BUSINESS EVENTS
SMALL BUSINESS TRANSPORTATION RESOURCE CENTERS
US SMALL BUSINESS ADMINISTRATION (SBA)
DYNAMIC SMALL BUSINESS DATABASE
SAM.GOV
APEX ACCELATORS FORMERLY PTACS
OSDBU INTERAGENCY COUNCIL
http://www.transportation.gov/OSDBU https://public.govdelivery.com/accounts/USDOT/subscriber/new https://www.transportation.gov/osdbu/SBTRCs https://www.sba.gov/ http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm http://beta.sam.gov/ https://www.apexaccelerators.us/#/ https://hallways.cap.gsa.gov/app/#/gateway/federal-osdbu-directors-interagency-council
37FEDERAL TRANSIT ADMINISTRATION
OSDBU Team Director Brad Mims brad.mims@dot.gov
Deputy Director Tyra Redus tyra.redus@dot.gov
Chief of Staff Tara McDaniel tara.mcdaniel@dot.gov
Director, Access to Capital Initiative Samuel Boyd samuel.boyd@dot.gov
Manager, Procurement Assistance Division Leonardo San Roman leonardo.sanroman@dot.gov
Manager, Regional Assistance Division Peter Kontakos peter.kontakos@dot.gov
Small Business Specialist & WOSB Advocate Brittany Young brittany.young@dot.gov
Sr. Small Business Specialist & SDVOSB Advocate Mandy Wylie mandy.wylie@dot.gov
Small Business Specialist & 8(a) & HUBZone Advocate Natalie Rosa natalie.rosa@dot.gov
Program Analyst, WITI Advocate Steronica Mattocks steronica.mattocks@dot.gov
Management Analyst Lee Tomlinson lee.tomlinson@dot.gov
Program Analyst Magen Elenz magen.elenz@dot.gov
Executive Staff Assistant Stacey Caswell stacey.caswell@dot.gov mailto:shelby.scales@dot.gov mailto:tyra.redus@dot.gov mailto:tara.mcdaniel@dot.gov mailto:samuel.boyd@dot.gov mailto:leonardo.sanroman@dot.gov mailto:Peter.Kontakos@dot.gov mailto:brittany.young@dot.gov mailto:mandy.young@dot.gov mailto:natalie.rosa@dot.gov mailto:steronica.mattocks@dot.gov mailto:lee.tomlinson@dot.gov mailto:magen.Elenz@dot.gov mailto:thomasine.johnson@dot.gov
38FEDERAL TRANSIT ADMINISTRATION
Questions & Answers
39FEDERAL TRANSIT ADMINISTRATION
Closing Remarks
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Rules of engagement |
| DISCLAIMER |
| Question & Answer Session |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| SYSTEM FOR AWARD MANAGEMENT (SAM) |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
File details come from the government source that posted it. Updated .