PMIS_313174_SOW.pdf

PDF 90 KB Posted

Attached to
RE-PLASTER SPRING HOUSE INTERIOR Federal contract opportunity
Solicitation number
140P5322Q0028
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to RE-PLASTER SPRING HOUSE INTERIOR, newest first.
File Type Posted
A2_-_Wage_Determination.pdf PDF
Sol_140P5322Q0028.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B - SCOPE OF WORK

B-1 Project Title

Replaster the Interior of the Spring House- Carl Sandburg Home National Historic Site

B-2 Work Description

1. Scope: This contract is to provide for the repair and replastering of the interior walls and ceiling of the Spring House at Carl Sandburg National Historic Site

2. Background: This project will rehabilitate the interior walls and ceiling of the Spring

House at the Carl Sandburg Home National Historic Site in Flat Rock, NC. The building built circa 1853 is approximately 10 x 10’ x 10’ on the interior with plaster walls and ceiling and a concrete floor. The work performed under the contract will consist of removing the existing plaster and wire lath and installing new wire lath and plaster.

3. Specific Requirements: The contractor shall provide all supervision, labor, material, equipment, and other related services and supplies to replace the interior plaster of the Spring

House.

4. Performance of work:

• Demolition: Existing plaster and wire lath shall be removed from the interior of the

Spring House.

• Wood studs on the walls and ceiling shall be inspected and replaced as needed using like materials.

• After demolition new wire lath shall be attached to the studs with appropriate fasteners

• PVA glue shall be used to prepare the lath for plaster

• A layer of plaster shall be mixed to manufacturers specifications and applied skimmed and smoothed.

• The plaster shall be scraped to add texture before a second coat is added. A float shall be used to get an even finish

• The contractor shall comply with all applicable building codes and Federal

Regulations. In addition, the contractor shall follow all manufacturers' instructions and best accepted trade practices.

• The contractor shall take all necessary precautions to protect surrounding areas and government property from damage.

• The contractor shall be responsible for repairing (or replacing) any areas or items damaged because of the performance of their work.

• The contractor shall be responsible for the daily cleanup and removal of any debris created during the performance of their work.

• The contractor shall not proceed to make any repairs or perform any work not described in the Scope of Work without prior approval from the Contracting Officer.

• The contractor shall supervise all work operations to ensure that the work completed or in progress, does not subject the National Park Service employees or park visitors to harmful, dangerous, damaging or otherwise deleterious (harmful) exposure during the work period.

• All waste shall be disposed of off-site upon completion of the project.

5. Materials and Workmanship:

• All material shall be new and unused, unless otherwise specifically addressed in the contract.

• The contractor shall use the necessary number of skilled workers who are thoroughly licensed, trained and experienced in the necessary craft, and who are completely familiar with the specified Scope of Work for this contract.

6. Project Scheduling:

• The Contractor shall perform pre-authorized work during normal working hours 7:30AM until 3:30 PM Monday thru Friday. Work on weekends and federal holidays will not be permitted. The contractor shall coordinate specific on-site work schedule with the

Contracting Officer and COTR five days prior to performance start date. While on site, the COTR may be reached by mobile phone during normal business hours. Work shall be completed within 30 days after Contracting Officer issues notice to proceed. Any work outside of normal business hours shall be pre-approved by the Contracting Officer and

COTR.

• The contractor shall submit to the National Park Service a work schedule for approval prior to start-up of the Project.

7. Completion of Work:

• The project will not be considered completed until the work has been inspected, tested, and accepted by National Park Service representatives.

• The Contractor shall supply a One Year warranty for all equipment, labor and materials used once substantial completion of the entire project occurs. Materials and equipment shall be warranted as stipulated by the Manufacturer’s Instructions.

8. Safety & Environmental Compliance:

• The contractor shall comply with pertinent provisions of the Occupational Safety and

Health Act (OSHA), and state, local, safety, laws.

• The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.

• The Park safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property.

• The contractor shall immediately report to the Contracting Officer, COTR and Park safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.

9 Insurance:

• The Contractor shall be insured in accordance with State of North Carolina insurance regulations. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought onsite.

The Government will not accept any liability due to contractor employee negligence.

• Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of the State of North

Carolina

• Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

B-3 General Requirements:

1. All measurements are approximate. Contractor shall be responsible for exact measurements.

2. It is required that all contractor and subcontractor personnel submit copies of applicable licenses (Ex: electrical, plumbing, etc). from the city and state showing their legal business address of operation.

3. All installations shall be performed in a professional manner and in accordance with all local and national codes.

4. Contractor shall remove all debris from the premises and make every effort to recycle the materials removed from the building.

5. Contractor shall ensure that the workplace is protected and returned to normal conditions for the next workday.

6. PRIOR TO THE BEGINNING OF WORK, the contractor shall submit for approval all MSDS sheets on all materials and chemicals intended for use during the project.

7. Contractor use of government material and/or equipment is not permitted.