PMB202608-PART_B.pdf
PDF 433 KB Posted
- Solicitation number
- 0000040934
- Issued by
- Trinity County, California
About this file
This document is a Request for Qualifications (RFQ) issued by the California Department of Corrections and Rehabilitation for a Design-Build Package involving fire alarm replacement at California State Prison, Solano (RFQ No. PMB202608). The RFQ Part B outlines experience and qualification requirements for prospective design-build entities. Respondents must submit project profiles demonstrating relevant experience across three key roles: Design-Architect of Record, Design-Engineer of Record, and Construction-Prime Contractor. Applicants may submit up to five completed projects from the last 10 years or projects currently under contract, with the option to attach up to four additional projects per role. The submission materials should include photographs and graphic materials and address specific project delivery capabilities including multiple building fire alarm replacements, design work within secure perimeters on CDCR projects, fire alarm and suppression repairs, and multi-building phasing strategies.
For each project profile, respondents must provide comprehensive information including project name, location, owner, team members across disciplines, gross square footage, scheduled and actual completion dates, original and final contract amounts with explanations of any variances, and descriptions of the design delivery method. The document does not specify pricing terms, set-asides, funding sources, or contract duration in Part B, as this section focuses exclusively on qualification and experience documentation requirements for evaluating the technical and professional capabilities of prospective design-build entities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PMB202608_PART_A.pdf | ||
| PMB202608_RFQ.pdf | ||
| PMB202608_AD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
FACILITY PLANNING, CONSTRUCTION AND MANAGEMENT
PROJECT MANAGEMENT BRANCH
REQUEST FOR QUALIFICATIONS FROM PROSPECTIVE DESIGN-BUILD
ENTITIES
FOR
FIRE ALARM REPLACEMENT
AT
CALIFORNIA STATE PRISON, SOLANO
RFQ NO. PMB202608
PART B - EXPERIENCE
Project Profiles (Design – Architect of Record) Project Profiles (Design – Engineer of Record) Project Profiles (Construction – Prime Contractor)
November 12, 2026
REQUEST FOR QUALIFICATIONS
PART B - EXPERIENCE
RFQ NO.: PMB202608
Design–Build Package
1. Project Profile Information Sheet Design – Architect of Record
Submit profiles for no more than five projects completed within the last 10 years or under current contract. Photos and other graphic materials may be included.
Project Manager (for Engineer of Records):
Principal in
Charge:
Project Name & Description:
Location:
Owner: Representative: Telephone:
General Contractor: Structural Engineer:
Mechanical Engineer: Electrical Engineer:
Construction Manager: Other Relevant Consultants:
Project Type: Gross Square Footage:
Scheduled Completion Date: Actual Completion Date:
Explain Difference, if any:
Original Contract Amount: Final Contract Amount:
Describe Design Delivery Method:
Relevant Factors from the RFQ – Provide additional sheets up to three total per project responding to requested information.
Provide examples of projects completed and describe the design approach. Include information that addresses the engineer’s ability to design a project demonstrating:
1. Multiple buildings fire alarm replacement and fire suppression repairs that emphasize safety and security.
2. Design in the secure perimeter, begin with CDCR projects
3. Design involving fire alarm and fire suppression repairs and replacement
4. Design involving multiple buildings and illustrate phasing
ATTACH UP TO FOUR ADDITIONAL PROJECTS AS REQUIRED
PART B - EXPERIENCE
RFQ NO.: PMB202608
Design–Build Package
2. Project Profile Information Sheet Design – Engineer of Record
Project Manager:
Architect: Electrical Engineer:
Other Relevant Factors from the RFQ – Provide additional sheets up to three total per project.
PART B - EXPERIENCE
RFQ NO.: PMB202608
Design–Build Package
3. Project Profile Information Sheet Construction - Prime Contractor
Project Manager:
Architect: Electrical Engineer:
Other Relevant Factors from the RFQ – Provide additional sheets up to three total per project.