PMB202607_Part_B.pdf
PDF 432 KB Posted
- Solicitation number
- 0000040932
- Issued by
- Kings County, California
About this file
This is a Request for Qualifications (RFQ) Part B document issued by the California Department of Corrections and Rehabilitation (CDCR) Facility Planning, Construction and Management Project Management Branch for a Design-Build entity to perform fire alarm replacement at a substance abuse treatment facility under RFQ No. PMB202607. The RFQ requires prospective entities to submit experience profiles demonstrating their qualifications across three key roles: Design - Architect of Record, Design - Engineer of Record, and Construction - Prime Contractor. Respondents must submit no more than five project profiles per role completed within the last ten years or currently under contract, with the option to attach up to four additional projects as required. Project profiles should include comprehensive information such as project name, location, owner details, contract amounts, completion dates, and design delivery methods, with supporting photos and graphic materials permitted.
Respondents must demonstrate specific relevant experience addressing multiple buildings fire alarm replacement and fire suppression repairs emphasizing safety and security, prior design work within secure perimeters with preference for CDCR projects, fire alarm and fire suppression repair and replacement experience, and phasing strategies for multiple building projects. The submission requirements include detailed project information sheets for each discipline, with additional narrative sheets (up to three per project) describing design approaches and relevant factors addressing the RFQ's specific technical requirements. The document does not specify pricing terms, set-asides, funding sources, or contract award dates within the portions provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PMB202607_Part_A.pdf | ||
| PMB202607_Ad.pdf | ||
| PMB202607_RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
FACILITY PLANNING, CONSTRUCTION AND MANAGEMENT
PROJECT MANAGEMENT BRANCH
REQUEST FOR QUALIFICATIONS FROM PROSPECTIVE DESIGN-BUILD ENTITIES
FOR
FIRE ALARM REPLACEMENT
AT
SUBSTANCE ABUSE TREATMENT FACILITY
RFQ NO. PMB202607
PART B - EXPERIENCE
Project Profiles (Design – Architect of Record) Project Profiles (Design – Engineer of Record) Project Profiles (Construction – Prime Contractor)
November 12, 2026
REQUEST FOR QUALIFICATIONS
PART B - EXPERIENCE
RFQ NO.: PMB202607
Design–Build Package
1. Project Profile Information Sheet Design – Architect of Record
Submit profiles for no more than five projects completed within the last 10 years or under current contract. Photos and other graphic materials may be included.
Project Manager (for Engineer of Records):
Principal in
Charge:
Project Name & Description:
Location:
Owner: Representative: Telephone:
General Contractor: Structural Engineer:
Mechanical Engineer: Electrical Engineer:
Construction Manager: Other Relevant Consultants:
Project Type: Gross Square Footage:
Scheduled Completion Date: Actual Completion Date:
Explain Difference, if any:
Original Contract Amount: Final Contract Amount:
Describe Design Delivery Method:
Relevant Factors from the RFQ – Provide additional sheets up to three total per project responding to requested information:
Provide examples of projects completed and describe the design approach. Include information that addresses the engineer’s ability to design a project demonstrating:
1. Multiple buildings fire alarm replacement and fire suppression repairs that emphasize safety and security.
2. Design in the secure perimeter, begin with CDCR projects
3. Design involving fire alarm and fire suppression repairs and replacement
4. Design involving multiple buildings and illustrate phasing
ATTACH UP TO FOUR ADDITIONAL PROJECTS AS REQUIRED
PART B - EXPERIENCE
RFQ NO.: PMB202607
Design–Build Package
2. Project Profile Information Sheet Design – Engineer of Record
Project Manager:
Architect: Electrical Engineer:
Other Relevant Factors from the RFQ – Provide additional sheets up to three total per project.
PART B - EXPERIENCE
RFQ NO.: PMB202607
Design–Build Package
3. Project Profile Information Sheet Construction - Prime Contractor
Project Manager:
Architect: Electrical Engineer:
Other Relevant Factors from the RFQ – Provide additional sheets up to three total per project.
File details come from the government source that posted it. Updated .