Pleasant_Valley_Fee_Table_Final.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Pleasant Valley Pump Station and Ground Storage Tank
Solicitation number
2026-RFP-131
Issued by
Cuyahoga County, Ohio

About this file

This is a fee table for engineering services related to the Pleasant Valley Pump Station and Ground Storage Tank project, a multidisciplinary design initiative undertaken by the City of Cleveland Department of Public Utilities, Division of Water. The project encompasses seven primary tasks: Preliminary Design, Detailed Design, Bidding and Award Support, Construction Support, Construction Inspection, Commissioning, and Project Closeout. The fee table establishes the billing structure for a prime consultant and up to three subconsultants across multiple engineering disciplines, including project management, CAD drafting and design, various engineering specialties (environmental, structural, site/civil, mechanical, electrical, and instrumentation and controls), surveying, construction inspection, and administrative support. Proposers are required to allocate hours and rates for each discipline across the prime consultant and subconsultant entities, with the constraint that total hours assigned must equal the specified total hours for each discipline.

The fee table structure requires proposers to populate hourly rates and calculate totals for each task, with a summary table consolidating all task costs. Fixed allowances are included for Reimbursable Expenses ($150,000), Permits ($100,000), and Optional Work Services ($400,000), which contribute to the Grand Total project cost. The table format accommodates cost distribution across four entities (Prime Consultant and three subconsultants designated as A, B, C, and D), requiring authorization signatures and dates from the proposer's company representatives. This fee table serves as the primary cost submission document for the City's selection of a qualified engineering firm to deliver comprehensive design and construction support services for the pump station and ground storage tank facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task 1

Task 1: Preliminary Design
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Inspector
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Task 2

Task 2: Detailed Design
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Inspector
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Task 3

Task 3: Bidding and Award Support
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Inspector
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Task 4

Task 4: Construction Support
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager100NANANANANANANANANANANANA
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Engineer
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Task 5

Task 5: Construction Inspection
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Inspector
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Task 6

Task 6: Commissioning
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Inspector
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Task 7

Task 7: Project Closeout
Total HoursPrime ConsultantSubconsultant #1Subconsultant #2Subconsultant #3
Discipline% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal% of WorkHoursRateTotal
Project Manager
2-D Autocad Drafter/Designer
3-D Autocad Drafter/Designer
Entry Level Engineer (EIT)
Environmental Engineer
Structural Engineer - P.E. (w/5yrs)
Site/Civil Engineer - P.E. (w/5yrs)
Mechanical Engineer
Electrical Engineer
Professional Surveyor
Surveying Crew Member
Senior Engineering Expert - P.E. (w/20+ yrs)
Staff Engineer - P.E. (w.10-20 yrs)
Construction Inspector
Instrumentation and Controls Engineer
Technicians
Clerical Support
Total-------------
ABCD

Sheet Total (A+B+C+D)= $ (additional sheets can be used if necessary)

Task Total =$
(if additional sheets are necessary)

Note: Prime Consultant and all Sub Consultants hours must equal the Total Hours listed for each discipline. Any adjustment to each discipline will be added/subtracted from the Prime's discipline total.

Proposer's Name:
Company's Name:
Authorized Signature:
Date:

Pleasant Valley Pump Station and Ground Storage Tank

Summary Table

PROJECT SUMMARY FEE TABLE
Task 1 Total$
Task 2 Total$
Task 3 Total$
Task 4 Total$
Task 5 Total$
Task 6 Total$
Task 7 Total$
Reimbursable Expense Allowance$ 150,000.00
Permit Allowance$ 100,000.00
Optional Work (Services) Allowance$ 400,000.00
GRAND TOTAL$
Proposer's Name:

Company Name:

Authorized Signature:

Date:

Pleasant Valley Pump Station and Ground Storage Tank

File details come from the government source that posted it. Updated .