About this file

This document is an Invitation to Bid (ITB) issued by the Camden County Board of Commissioners for the replacement of play structures at the Cornelia Jackson Memorial Park located at 201 15th Street, Woodbine, GA 31569. The County is seeking qualified contractors to furnish labor, tools, materials, and equipment to replace and upgrade the existing play structures, which will be removed by the County prior to construction. The scope includes providing a 5-12 year old play structure, a 2-5 year old play structure, at least one additional ancillary play structure, new swings and paint for the swing set, and accessibility matting. Bids are due by May 16, 2024 at 2:00 PM EST, and the winning bidder must commence work within 10 days of the notice to proceed and complete the project within a specified number of calendar days. The contract will be awarded to the responsible, responsive bidder whose submission will be most advantageous to the County, with pricing and other factors considered.

The ITB provides detailed specifications and requirements, including warranty provisions, insurance and bonding requirements, and instructions for submitting bids. Pricing must be firm for 90 days, and quotes must be F.O.B. destination. Bidders are required to provide references and submit a bid bond equal to 5% of the total bid amount. The County reserves the right to negotiate with the lowest responsive, responsible bidder if the bid exceeds available funds.

View the file

Other files

File Type Posted
Notice of Intent to Award Cornelia Jackson Me.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

BOARD OF COUNTY

COMMISSIONERS

PROJECT:

CORNELIA JACKSON MEMORIAL PARK

PLAY STRUCTURES REPLACEMENT

INVITATION TO BID #B24-1565-20

BID DUE:

May 16th, 2024 2:00 PM EST

2 | P a g e

INVITATION TO BID

CORNELIA JACKSON MEMORIAL PARK

PLAY STRUCTURES REPLACEMENT

Bid Number: B24-1565-20

Due Date: May 16, 2021 2:00 PM EST

On behalf of Facilities Management, Camden County Purchasing Department requests sealed competitive bids for a qualified contractors to furnish all labor, tools, materials and equipment to replace and upgrade the play structures located at Cornelia Jackson Memorial Park, 201 15th Street, Woodbine, GA 31569. Competitive sealed bids will be received at the Camden County Purchasing Office until, but no later than 2:00 P.M. EST Thursday May 16th, 2024 at which time said sealed bids will be publicly opened and contractors’ names only will be read aloud.

One (1) original and two (2) copies of required bid documents must be submitted in a sealed envelope marked " CORNELIA JACKSON MEMORIAL PARK PLAY STRUCTURE

REPLACEMENT– ITB #B24-1565-20”.

Bids may be withdrawn by written request only if the request is received prior to the time and date set for the opening bids. Negligence on the part of the bidder in preparing their bid confers no right of withdrawal or modification of their bid after bid has been opened. No bids may be withdrawn for a period of ninety (90) days after the time and date of opening of bids.

Camden County reserves the exclusive right to determine which bidder should be awarded the Contract. Camden County also reserves the right to waive any irregularity or informality in a bid, and accept or reject any item or combination of items, when to do so would benefit Camden County. Also, Camden County may reject bids that do not contain all elements and information requested. Camden County will not be liable for any cost/losses incurred by bidders throughout this process. Camden County does not discriminate on the basis of race, religion, color, sex, national origin, age, or disability.

The bidder will indemnify, defend, and hold harmless Camden County from and against any and all claims, damages, losses, and expenses including, but not limited to, fees and charges of attorneys and court and arbitration costs, arising out of or resulting from the negligent acts, negligent omissions, willful misconduct, or reckless misconduct of the bidder or anyone for whom the bidder is responsible.

Questions regarding this project may be directed in writing to the Purchasing Officer, Kelsey Kelley, at 200 E. 4th Street, Woodbine, Georgia 31569 or at bids@camdencountyga.gov . All questions shall be received by May 7th, 2024 and answered by May 9th, 2024.

SCOPE

Camden County is seeking qualified contractors to replace the play structures at Cornelia Jackson Memorial Park located at 201 15th Street, Woodbine, GA 31569. At the start of construction, the currently installed play structures will be removed by the county. The contractor is responsible for mailto:bids@camdencountyga.gov

3 | P a g e furnishing the following at a minimum: a play structure designated for five(5) - twelve(12) year old children, a play structure designated for two(2)-five(5) year old children, at least one additional ancillary play structure/piece of equipment (examples include monkey bars, dome climbing bars, ride on equipment, etc.), new swings for the swing set and new paint for the swing set, and accessibility matting to all ground level play structures shall be installed. The contractor is responsible for ensuring the play structures are certified/installed by a playground safety inspector.

Any new mulch required during the construction to fill in or top off existing mulch is the responsibility of the contractor and an allowance should be included in the proposal. The proposal must include visual representations of the play structures being proposed to include colors. The play structures must fit within the current lay out of the mulched play area (a visual representation of the area can be pulled for google earth or a site visit). Bid must include a breakdown price sheet.

Everything should be itemized.

SPECIFICATIONS

1.Condition of Items

All items shall be new, in first class condition, including containers suitable for shipment and storage, unless otherwise indicated herein. Verbal agreements to the contrary will not be recognized.

2. Workmanship and Inspection All work under the resulting contract shall be performed in a skillful and workmanlike manner. The County may, in writing, require the Contractor to remove any employee from work that the County deems incompetent or careless. Further, the County may, from time to time, make inspections of the work performed under this contract. Any inspection by the County does not relieve the Contractor from any responsibility regarding defects or other failures to meet the contract requirements.

3. Cleaning Up

The Contractor(s) shall at all times keep the adjacent areas of the work area free from rubbish and the accumulation of any waste materials.

4. Safety All contractors and subcontractors performing services for the County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Also, all contractors and subcontractors shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area under this contract.

5. Incidental and Consequential Damages

No bidder may require contractual language limiting or eliminating liability for incidental and consequential damages.

6. Hold Harmless Clause

The Contractor will, during the term of the Contract including any warranty period, 4 | P a g e indemnify, defend, and hold harmless the County from loss from all suits, actions, or claims of any kind brought as a consequence of any negligent act or omission by the Contractor.

The Contractor agrees that this clause shall include claims involving infringement of patent or copyright. For purposes of this paragraph, “County” and “Contractor” includes their employees, officials, agents, and representatives. “Contractor” also includes subcontractors and suppliers to the Contractor. The word “defend” means to provide legal counsel for the County or to reimburse the County for its attorney’s fees and costs related to the claim.

CONTRACT TERMS AND CONDITIONS

The Contract with the successful bidder will contain the following contract terms and conditions:

1. Procedures

The extent and character of the services to be performed by the Contractor shall be subject to the general control and approval of the County’s authorized representative(s). Any change to the contract must be submitted in writing and approved by the Facilities Management Director, Matthew Zink.

2. Contract Quantities The quantities specified in this contract are estimated only. They do not indicate the actual quantity which may be ordered, since such volume will depend upon requirements which develop during the contract period. Quantities shown shall not be construed to represent any amount which the County shall be obligated to purchase under the contract, or relieve the Contractor of his obligation to fill all orders placed by the County. NO BID

WILL BE CONSIDERED WHICH STIPULATES THAT CAMDEN COUNTY SHALL

GUARANTEE TO ORDER A SPECIFIC QUANTITY.

3. Schedule

Bidders shall provide, with their bid, a proposed schedule for the project. Failure to include the schedule may be ample cause for rejection of bid as non-responsive. The actual timing for this project shall be coordinated with the Facilities Management Director.

4. Delays

If a delay is foreseen, the Contractor shall give ample notice to the County. The County has the right to extend completion date if reasons appear, in the sole discretion of the County, to be valid. Contractor must keep the County advised at all times of status of order.

Default in promised completion (without accepted reasons) or failure to meet specifications, authorizes the County to purchase supplies elsewhere and charge full increase in cost and handling to defaulting Contractor.

5. License Requirement

All firms doing business in Camden County are required to hold a current valid business license within the municipality where the home office is located.

5 | P a g e

6. Insurance

The Contractor shall procure, maintain, and provide proof of, insurance coverage for injuries to persons and/or property damage as may arise from or in conjunction with, the work performed on behalf of the County by the Contractor, his agents, representatives, employees or subcontractors. Proof of coverage as contained herein shall be submitted prior to the commencement of work and such coverage shall be maintained by the Contractor for the duration of the contract period. The Contractor shall not perform any work unless he has obtained, and continues to maintain for the duration of such work, such worker's compensation coverage as may be required pursuant to the provisions of Title 34 Chapter 9 of the Official Code of Georgia.

A. Liability:

The Contractor shall maintain such insurance as will protect him from claims under workmen's compensation acts and from any other claims for damages to property, and for personal injury, including death, which may arise from operations under this contract, whether such operations be by himself or by any sub-contractor or anyone directly or indirectly employed by either of them. Such certificates shall be in form and substance reasonably acceptable to the Owner, shall indicate that, except in respect to workers compensation insurance coverage and professional errors and omissions, Owner is an additional insured with respect to such coverage, and shall indicate that such coverage is primary and not contributory with any similar insurance purchased by the Owner. The certificates shall contain a provision that the insurer will endeavor, if allowed by the policy, to provide Owner with thirty (30) calendar days’ notice of nonrenewal, cancellation, or termination of the coverage. If the successful bidder receives a nonrenewal. cancellation, or termination notice from an insurance carrier affording coverage required herein, the successful bidder agrees to notify Owner by fax within two (2) business days with a copy of the nonrenewal, cancellation, or termination notice, or written specifications as to which coverage is no longer in compliance. Failure to comply with any of the provisions relating to insurance coverage herein shall be deemed a material breach if not cured. The contractor shall be responsible for providing adequate limits of insurance when working within property owned by railroads, as established by such railroad company.

B. Indemnity:

To the fullest extent permitted by laws, statutes, rules and regulations, the Contractor shall indemnify and hold harmless the County, Engineer, Engineer’s Consultants and the Officers, Directors, Employees, Agents, and other Consultants of each and any of them from and against claims, costs, damages, losses, and expenses, including but not limited to all fees and charges of engineers, architects, attorneys and other professionals and all court costs, arising out of or resulting from performance of the work, but only to the extent caused in whole or in part by negligent, reckless, willful and wanton, or wrongful acts or omissions of the Contractor, its Officers, Directors, Employees, Agents, and anyone directly, or indirectly employed by them or anyone for whose acts they may be liable, 6 | P a g e regardless of whether or not such claim, cost, damage, loss, or expense is caused in part by a party indemnified hereunder, except that no party shall indemnify any other party or person for their own sole negligence.

Such obligation shall not be construed to negate, abridge or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph.

C. Bid Bond:

All contractors must submit with bid, a bid bond in the amount of five percent (5%) of the total bid. Failure to submit a bid bond with the proper rating will result in the bid being deemed non-responsive. Successful supplier will be required to meet insurance requirements, submit a one hundred percent (100%) performance bond and a one hundred percent (100%) payment bond. Insurance and Bonding Company should be licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by The Georgia Insurance Department, listed in the Department of Treasury's Publication of Companies holding Certificates of Authority as Acceptable Surety on Federal Bonds and as acceptable reinsuring companies. The bid bond, payment bond, and performance bond must have an A.M. Best rating of A-5 or higher.

D. Comprehensive General Liability:

The successful Bidder shall exercise proper precaution at all times for the protection of persons and property. He shall carry approved insurance from insurance companies authorized to do business in Georgia and having an A.M. Best’s rating of A+ or better with the following minimums:

*The limits of insurance are as follows:

a) General liability insurance of at least One Million (1,000,000) Dollars (Combined Single Limit per occurrence) and Two Million (2,000,000) Dollars aggregates;

b) Automobile insurance of at least Five Hundred Thousand (500,000) Dollars (Combined Single Limit per accident for bodily injury or property damage); and

c) Workers’ Compensation Insurance as will protect potential bidder or offer from Workers’ Compensation Acts

7. Exemption from Taxes The Contractor shall not charge the County directly for any sales or excise tax. The County is exempt from State Sales Tax. Tax Exemption Certificates indicating the County’s tax-exempt status will be furnished by the County on request. The Contractor shall be responsible for any payment of any sales, use, or excise tax. This exemption does not include materials purchased and used by a contractor for a construction project.

8. Warranty

The contractor warrants that he is familiar with the codes applicable to the work and that

7 | P a g e he has the skill, knowledge, competence, organization, and plant to execute the work promptly and efficiently in compliance with the requirements of the Contract Documents.

The Contractor, having the obligation to keep a competent superintendent on the work during its progress, to employ only skilled mechanics, and to enforce strict discipline and good order among his employees, the Contractor, himself, is responsible for seeing that the work is installed in accordance with the Contract Documents. The Contractor warrants to the Owner that all materials and equipment incorporated in the work will be new unless otherwise specified, and that all work will be of good quality, free from faults and defects and in conformance with the Contract documents. All work not conforming to these requirements may be considered defective.

(a) Duty to Protect Property: The Contractor shall continuously maintain adequate protection of all his work from damage, injury, or loss arising in connection with the work regardless of who may be the Owner of said property. He shall make good such damage, injury or loss except such as may be directly the result of errors in the Contract Documents or such as shall be caused directly by agents or employees of the Owner.

(b) Duty to Correct: The Contractor shall promptly correct any Work rejected by the Design

Professional as defective or as failing to conform to the Contract Documents whether observed before or after Completion and whether or not fabricated, installed or completed, and shall correct any work found to be defective or nonconforming within a period of one year from the date of Completion of the Contract or within such longer period of time as may be prescribed by law or the terms of any applicable special warranty required by the Contract Documents. The provisions of the Article apply to work done by subcontractors as well as work done by direct employees of the Contractor.

(c) Warranty of Contractor: The Contractor warrants that the subcontractors selected by him are reputable, skilled, reliable, competent, qualified in the trade of field in which they are to perform on the project, and thoroughly familiar with applicable codes.

(d) Contractor Responsibilities: Contractor Responsible for Acts and Omissions of

Subcontractors, Materialmen, Suppliers and Employees. The Contractor agrees that he is fully responsible for the acts and omissions of his subcontractors, materialmen, suppliers, and employees and of person either directly or indirectly employed by them as he is for that acts and omissions of persons directly employed by him.

(e) Warranty and Guaranty: The Contractor warrants and guarantees that all work executed under the Contract Documents shall be free from defects of materials or workmanship for a period of one year from the date of Completion. All written guarantees or warrantees as called for in the specifications shall specify the term and contact information for enforcement and shall be in such form as to permit direct enforcement by the Owner against and Trade Contractor, subcontractor, materialman, or manufacturer related to the guarantee. The effective date of all warranties and guarantees shall be the date of the Certificate of Material Completion. Warranties, guarantees, and manufacturer’s certificates shall be provided to the Owner in a three-

8 | P a g e ring binder(s) with a summary list of contents.

(f) Correction of Work after Final Payment: Neither (1) the Certificate of Material Completion, (2) nor any decision of the Design Professional, (3) nor payment, (4) nor any provision in the contract shall relieve the contractor of responsibility for faulty materials, faulty workmanship, or omission of contract work, and he shall remedy any defects or supply any omissions resulting therefrom and pay for any damage to other work resulting therefrom. The Owner shall give notice of observed defects or omissions with reasonable promptness. The Contract shall within the space of time designed in the notice of non-compliant work and without expense to the Owner, correct, remedy, replace, re-execute, supply omitted work, or remove from the premises all non-compliant work noted by the Design Professional. The Contractor shall give prompt notice in writing to the Design Professional, with copy to the Owner, upon completion of the supplying of any omitted work or the correction of any non-compliant work. In the absence of said notice, it shall be and is presumed under this contract that there has been no correction of the non-compliant work or supplying omitted work. If the Contractor does not remove, make good the deficiency, correct or remedy faulty work, or supply any omitted work within the space of time designated in notice of non-compliant work without expense to the Owner, the Owner, after ten days’ notice in writing to the Contractor, may remove the work, correct the work, remedy the work or supply omitted work at the expense of the Contractor. In case of emergency involving health, safety of property, or safety of life the Owner may proceed at once. Correction of defective work executed under the plans and specifications or supplying of omitted work whether or not covered by warranty of a subcontractor or material man, remains the primary, direct responsibility of the Contractor. The foregoing obligation of the Contractor shall remain in effect until the same shall have been extinguished by operation of the statute of limitations. As additional security for the fulfillment of such obligation, but in no way limiting the same, the Contractor warrants and guarantees (1) that all work executed under the plans and specifications shall be free from defects of materials or workmanship for a period of one year from the date of the Certificate of Material Completion of the Design Professional, and (2) that for not less than one year from the date of the Certificate of Material Completion of the Design Professional, or for such greater space of time as may have been designated in the specifications, products of manufacturers shall be free from defects of materials and workmanship.

Whenever written guaranties or warranties are called for, the Contractor shall furnish the aforesaid for such period of time as may be stipulated. The aforesaid instruments shall be in such form as to permit direct enforcement by the Owner against any subcontractor, materialman, or manufacturer whose warranty is called for, and the Contractor agrees that:

1. The contractor is jointly and severally liable with such subcontractors, materialmen, or manufacturers.

2. The said subcontractors, materialmen, or manufacturers are agents of the Contractor for purposes of performance under this article, and the Contractor, as principal, ratifies the warranties or guaranties of his aforesaid agents by the filing of the aforesaid instruments with the Owner. The Contractor as principal is liable for the acts or omissions of his agents.

9 | P a g e

3. Service of notice on the Contractor that there has been breach of any warranty or guaranty will be sufficient to invoke the terms of the instrument, Provided: That the owner shall have furnished the Contractor with a copy of notice served on the subcontractor, materialman, or manufacturer.

4. The Contractor will bind his subcontractor, materialman, and manufacturers to the terms of the article. The calling for the furnishing of written warranties shall in no way limit the contractual obligation of the Contractor as set forth hereinabove. The remedies stated in this article are in addition to the remedies otherwise available to the Owner, do not exclude such other remedies, and are without prejudice to any other remedies.

9. Method of Payment Contractors shall provide their federal employer identification number on a standard W-9 form within 15 days after award in order not to delay payment. Contractor shall submit request for payment directly to Camden County Facilities Management for payment issuance.

Invoices shall be submitted to:

Camden County Board of Commissioners Attn: Tammy Dukes P O Box 99 Woodbine, GA 31569 tldukes@camdencountyga.gov

Upon inspection and acceptance of the work, the County will render payment, less any retainage if applicable, within thirty (30) days.

10. Termination

Subject to the provisions below, the Contract may be terminated by the County upon ten (10) days advance written notice to the other party; but if any work or service hereunder is in progress, but not completed as of the date of termination, then the Contract may be extended upon written approval of the County until said work or services are completed and accepted.

A. Termination for Convenience:

The County may terminate this Contract for convenience at any time in which case the parties shall negotiate reasonable termination costs.

B. Termination for Cause:

In the event of Termination for Cause, the thirty (30) days advance notice is waived and the Contractor shall not be entitled to termination costs.

11. Severability In the event that any provision of this contract shall be adjudged or decreed to be invalid, such ruling shall not invalidate the entire Agreement but shall pertain only to the provision in question and the remaining provisions shall continue to be valid, binding and in full force and effect.

12. Applicable Laws This contract shall be governed in all respects by the laws of the State of Georgia.

mailto:tldukes@camdencountyga.gov

10 | P a g e

INSTRUCTIONS TO BIDDERS

1. Instructions

One (1) original and two (2) copies of required bid documents must be submitted in a sealed envelope marked with the Invitation to Bid number, due date, and the bidder’s name and address on sealed submission package, as well as outside of shipping packaging.

U.S. Postal Service: FEDEX/UPS Deliveries Camden County Board of Commissioners Camden County Board of Commissioners Purchasing Office Purchasing Office PO Box 99 200 E 4th St Woodbine, GA 31569 Woodbine, GA 31569

Bids will be accepted at the above address until the time and date specified above, and immediately after will be publicly opened and vendor names only will be read aloud.

Bids received after the required time or in any other location other than the Purchasing Office will not be accepted. Camden County will not be held liable for misdirected deliveries nor deliveries that are late due to shipping carrier. Faxed or email submissions will not be accepted.

All bids submitted in response to this invitation shall become the property of Camden County and will be a matter of public record available for review after award.

2. Inquiries

Questions and inquiries will be accepted from any and all bidders. Camden County Purchasing Officer is the sole point of contact for this solicitation unless otherwise instructed herein. Questions must be submitted in writing by May 7th, 2024 at 5PM.

Questions may be emailed to Kelsey Kelley at bids@camdencountyga.gov. No phone calls, please. Unauthorized contact with other Camden County staff regarding the ITB may result in the disqualification of the bidder. Inquiries pertaining to Invitation to Bid must give ITB number and title. Material questions will be answered in writing, typically via email and will be posted to the county website as an addendum. It is the sole responsibility of the bidder to check the website (www.camdencountyga.us) regularly up to and including the date the bids are due.

3. Completion Bids must show number of days required to complete each project under normal conditions.

Failure to state completion time obligates bidder to complete the project according to the County's schedule. Unrealistically short or long completion promised may cause bid to be disregarded. Consistent failure to meet delivery promises without valid reason may cause removal from vendor list.

4. Firm Pricing for County Acceptance Bid price must be firm for County acceptance for 90 days from bid opening date.

mailto:bids@camdencountyga.gov http://www.camdencountyga.us/

11 | P a g e

5. Quotations to be F.O.B. Destination

QUOTE F.O.B. destination for all competitive sealed bids. F.O.B. Destination shall include all shipping costs to the Camden County Government Services Building in Woodbine.

6. Authority to Bind Firm in Contract Bids MUST give full firm name and address of bidder. Failure to manually sign bid may disqualify it. Person signing bid should show TITLE or AUTHORITY TO BIND HIS FIRM IN A CONTRACT. Firm name and authorized signature must appear on bid in the space provided.

7. References

All bidders shall include, with their bids, a list of at least three (3) current references for whom comparable work has been performed. This list shall include company name, person to contact, telephone number, email address, address where work completed and days to complete. Failure to include references may be ample cause for rejection of bid as non-responsive.

8. Basis for Award

The contract will be awarded to the responsible, responsive bidder(s) whose submission, conforming to the solicitation, will be most advantageous to Camden County – price and other factors considered. Unless otherwise specified in this ITB, Camden County reserves the right to accept a bid in whole or in part, and to award by item or by group, whichever is deemed to be in the best interest of Camden County when applicable. Any bidder who is in default to Camden County at the time of submittal of the bid shall have that bid rejected. Camden County reserves the right to clarify any contractual terms with the concurrence of the Contractor; however, any substantial nonconformity in the offer, as determined by Camden County, shall be deemed non-responsive and the offer rejected. In evaluating bids, Camden County shall consider the qualifications of the bidder, timeframe, cost, references and guarantees of materials and equipment.

9. Negotiation with the Responsible Bidder

Unless all bids are canceled or rejected, the County reserves the right to negotiate with the most responsive, responsible bidder to obtain a contract price within the funds available whenever such bid exceeds the available funds. Negotiations with the bidder may include both modifications of the bid price and the specifications/scope of work to be performed.

10. Notice of Award

A notice of award will be issued once the project is awarded by the Camden County Board of Commissioners at an open meeting.

12 | P a g e

Person to contact regarding this bid: _____________________________________

Title: _________________________

Phone: ________________________

Email Address: ____________________________________________________

Name of person authorized to bind the Firm: _____________________________

Signature: __________________________________

Date: ______________________________________

Name of Company: ____________________________________________________

Address: _____________________________________________________________

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

_____ DAY OF ______________________, 202_

Notary Public My Commission Expires: ______________________

FAILURE TO RETURN THIS PAGE AS PART OF YOUR BID MAY RESULT IN BID

BEING DEEMED NON-RESPONSIVE.

13 | P a g e

REFERENCES

Camden County Board of Commissioners requests a minimum of three, (3) references where work of a similar size and scope has been completed.

References

Bidders shall provide references on this form.

1. Firm Name__________________________________________________________________

Brief Description of Project____________________________________________________

Completion Date_____________________________________________________________

Contact___________________________________Phone______________________________

Title______________________________________E-mail______________________________

2. Firm Name___________________________________________________________________

Completion Date________________________________________________________________

Contact_________________________________Phone__________________________________

Title____________________________________E-mail_________________________________

3. Firm Name___________________________________________________________________

Completion Date________________________________________________________________

Contact________________________________Phone___________________________________

Title___________________________________E-mail__________________________________

14 | P a g e

CONTRACTOR AFFIDAVIT AND AGREEMENT

(THIS FORM SHOULD BE FULLY COMPLETED AND RETURNED WITH YOUR BID

PACKET)

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of the Camden County Board of Commissioners has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).

Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number (E-verify Number)

Date of Authorization

Name of Contractor

Address of Contractor

City, State and Zip Code

Name of Project

I hereby declare under the penalty of perjury that the foregoing is true and correct.

Executed on _________, ____, 20___ in ____________ (City), __________ (State).

Signature of Authorized Officer or Agent (Contractor)

Title of Authorized Officer or Agent (Contractor)

15 | P a g e

Printed Name of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

_____ DAY OF ______________________, 201_

My Commission Expires:

16 | P a g e

SUBCONTRACTOR AFFIDAVIT AND AGREEMENT

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A.

13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (name of contractor) on behalf of Camden County Board of Commissioners has registered with and is participating in a federal work authorization program* [any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and deadlines established in O.C.G.A. 13-10-91.

EEV / Basic Pilot Program* User Identification Number BY: Authorized Officer or Agent Signature Date (Subcontractor Name)

Title of Authorized Officer or Agent of Subcontractor

Printed Name of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

_____ DAY OF ______________________, 201_

My Commission Expires: __________________________

FAILURE TO RETURN THIS PAGE AS PART OF YOUR BID MAY RESULT IN BID

BEING DEEMED NON-RESPONSIVE.

17 | P a g e

CAMDEN COUNTY BOARD OF COMMISSIONER

CAMDEN COUNTY, GEORGIA

LIST OF SUBCONTRACTORS FORM

I do__________, do not _____________ propose to subcontract some of the work on this project. I propose to

Subcontract work to the following subcontractors:

NAME AND ADDRESS TYPE OF WORK

18 | P a g e

STATEMENT OF BIDDER’S QUALIFICATIONS

(To be subscribed and sworn to before a notary public)

The bidder submits the following statement of bidder’s qualification for consideration by the Owner.

Legal Name of Bidder/Firm: ___________________________________________________

Street Address: ________________________________________________________________

Telephone Number: ____________________________________________________________

Fax Number: __________________________________________________________________

Email Address: ________________________________________________________________

When Organized: _______________________________________________________________

Where Incorporated: ____________________________________________________________

Number of years engaged in the contracting business under the present firm name:

Plan of Organization: ___Proprietorship ___Corporation ___Partnership

The bidder has never refused to sign a contract at the original bid. ____T _____F

The bidder has never been declared default on a contract. ____T _____F

Remarks:

The foregoing statement of qualifications is submitted under oath.

Under oath, I certify that I am a principal or other representative of the firm of ____________________________________ and I am authorized by it to execute the foregoing offer on its behalf. I am a principal person of the foregoing with management responsibility for the foregoing subject matter and as such, I am personally knowledgeable of all its pertinent matters. The foregoing statements of facts in the foregoing bid are true.

I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm or person submitting a bid for the same materials, labor supplies or equipment and is in all respects, fair and without collusion or fraud. We understand collusive bidding is violation of state and federal law and can result in fines, prison sentences and civil damage awards. We agree to abide by all conditions of this bid.

19 | P a g e

The full name and addresses of persons and firms interested in the foregoing bid as principals are as follows:

Date: __________________________________________________________________

Legal Name of Firm: ______________________________________________________

By (Signature):___________________________________________________________

Printed Name: ___________________________________________________________

Title: ___________________________________________________________________

Sworn to and subscribed before this ____________day of ________________________________202__.

My commission expires: _______________________

20 | P a g e

NON-COLLUSION AFFIDAVIT

COUNTY OF: _____________________________

STATE OF: ________________________________

Before me, the Undersigned Proposer being duly sworn on oath, a Notary Public, for and in the

County and State aforesaid, personally appeared ___________________________________and made oath that the Contractor herein, his agents, servants, and/or employees, to the best of his knowledge and belief, have not in any way colluded with anyone for and on behalf of the

Contractor, or themselves, to obtain information that would give the Contractor an unfair advantage over others, nor have they colluded with anyone for and on behalf of the Contractor, or themselves, to gain any favoritism in the award of the contract herein. He or she further states that no person or person, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee gift, commission or thing of value on account of such sale.

Oath and Affirmation

I hereby affirm under the penalties for perjury that the facts and information contained in the foregoing proposal for public works are true and correct.

Dated this day______ of ____________________, _______________

Authorized Signature for Design- Builder: _________________________________________

Title: ______________________________________________________________________

Contractor’s name (print):__________________________________________________

SWORN TO BEFORE ME THIS ______DAY OF_____________, 20_____

NOTARY PUBLIC FOR THE STATE OF ______________________

My Commission Expires: ______________________

Notary Public Signature: ________________________

Printed Name: __________________________________

Phone Number: ____________________________Address: ___________________________

21 | P a g e

CAMDEN COUNTY BOARD OF COMMISSIONERS

Cornelia Jackson Memorial Park

Play Structure Replacement

ITB#B24-1565-20

BID FORM

DATE: _______________________________

TO: CAMDEN COUNTY BOARD OF COMMISSIONERS

200 E 4TH ST.

WOODBINE, GA 31569

Having carefully examined the Bid Documents entitled Cornelia Jackson Memorial Park Play Structure Replacement, and Addendum(s) No. (s) ___________________________ as well as the premises and conditions affecting the work, we bid to furnish all services, labor, equipment and materials called for them for the entire work, in accordance with aforesaid documents, for

Item Price Quantity Manufacturer Total Play Structure Five (5)-Twelve (12) Play Structure Two (2)-Five (5) Ancillary Play Structure New Swings New Paint for Swing Set Accessibility Matting Installation Mulch

Grand Total

($_____________________________) which sum is hereinafter called the “Base Bid.”

Warranty_________________________________________________________________

We agree that this bid may not be revoked or withdrawn for a period of ninety (90) days following such time. In the case we are notified in writing, by mail, or email of acceptance of this bid within ninety (90) days after the time set for the opening of bid, we agree to begin within ten (10) days, work for the above stated project.

The undersigned agrees to commence actual physical work on the site with an adequate for and equipment within ten (10) days of the notice to proceed to the undersigned and to complete fully all work on or before _________calendar days from notice to proceed.

22 | P a g e

Legal Name of Firm: _________________________________________________________

By (Signature): _____________________________________________________________

Printed Name: ______________________________________________________________

Title: ______________________________________________________________________

23 | P a g e

BID BOND

KNOW ALL MEN BY THESE PRESENTS: that (Name of Contractor) (Address of Contractor) A____________________________________________________________________________ (Corporation, Partnership or Individual) hereinafter called Principal, and

(Name of Surety)

(Address of Surety) a Corporation of the State of _____________________, and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held and firmly bound unto

Camden County Board of Commissioners (Name of Owner)

200 East 4th Street/ P. O. Box 99, Woodbine, Georgia 31569 (Address of Owner)

Thereinafter referred to as Owner: in the penal sum of five percent (5%) of the amount of the bid referred to in paragraph 2 below, but not to exceed ______________________________________________ Dollars ($___________________) in lawful money of the United States, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

WHEREAS, the Principal is about to submit, or has submitted, to Camden County Board of Commissioners, Camden County, Georgia, a bid for furnishing materials, labor, and equipment for: Cornelia Jackson Memorial Park Play Structure Replacement.

WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder's check otherwise required to accompany this bid.

NOW, THEREFORE, the conditions of this obligation are such that if the bid be accepted, the Principal shall within ten days after receipt of notification of the acceptance, execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by Camden County Board of Commissioners and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to Camden County Board of Commissioners, each in the amount of 100% of the total Contract Price, in form and with

24 | P a g e security satisfactory to said Camden County, Georgia, and otherwise, to be and remain in full force and virtue in law, and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to Camden County Board of Commissioners, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.

PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. 36-91-1 et seq., and is intended to be and shall be constructed as a bond in compliance with the requirements thereof.

Signed, sealed and dated this ___________ day of _________ , 20___ .

ATTEST:

(Principal) (Principal Secretary) By:

(SEAL)

(Address)

(Witness as to Principal) (Address)

(Surety)

ATTEST:

By:__________________________________ (Attorney-in-Fact) Resident Agent (Address)

(SEAL)

25 | P a g e

(Witness as to Surety)

(Address) NOTE: If Contractor is Partnership, all partners should execute Bond. Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the Project is located.