Planting Creek HFR_Solicitation Amendment 1.pdf

PDF 219 KB Posted

Attached to
Flowery Trail Seed Orchard HFR - Phase 2
Solicitation number
7031
Issued by
Pend Oreille County, Pierce County, Washington

About this file

This document is a solicitation amendment for IFB# 7032 issued by the Washington Department of Natural Resources (DNR) for the Planting Creek Seed Orchard Hazardous Fuels Reduction (HFR) Mastication project under the Good Neighbor Authority on the Gifford Pinchot National Forest. The amendment clarifies that the contract requires grinding all stumps down to ground level in addition to masticating all slash, small trees, and shrubs. The project specifications include a maximum chip depth of 3 inches on average across the orchard, and 1 inch under the crown of leave trees. Bidders must submit a complete bid packet including required forms and copies of labor contractor licenses by the bid due date.

The related state and local contract opportunity is for the Flowery Trail Seed Orchard HFR - Phase 2 project, also under the Good Neighbor Authority and conducted by the Washington DNR on USFS lands. This 10-acre project will treat logging slash using mechanical mastication. The contract is open to bidders in Pierce County and Pend Oreille County, Washington.

View the file

Other files

File Type Posted
7031_Flowery Trail #2_HFR_IFB.pdf.crdownload CRDOWNLOAD file
7031_Flowery Trail_Solicitation Amendment 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTIFICATION OF AMENDMENT

IFB# 7032 GOOD NEIGHBOR AUTHORITY Planting Creek Seed Orchard HFR Mastication:

Purpose of Amendment: Clarify that the contract requires grinding of all stumps to ground level. The amended language is shown in red below:

SECTION II-A: UNIT DESCRIPTIONS

Region: Gifford Pinchot National Forest

OBJECTIVE:

Masticate all slash (tops & limbs) as well as small trees and shrubs not marked with orange paint. This includes grinding all stumps down to ground level.

SPECIAL REQUIREMENTS:

Chip depth will not exceed an average of 3 inches across the orchard and will not exceed 1 inch under the crown of leave trees.

Wash vehicles and equipment before arrival on Forest and/or between work sites to limit the spread of invasive plants.

BID DELIVERY:

The Bidder shall prepare one complete bid packet for submission according to the Contents and Submittal Instructions (Section 3 of this IFB). In short, a complete packet includes fully filled out forms available in Exhibit A and photocopies of state/federal Farm Labor Contractors licenses. Section 3.2 provides a checklist describing the parts needed for a complete bid.

mailto:Tom.Heller@dnr.wa.gov

IFB# 7028 GOOD NEIGHBOR AUTHORITY Ed Cliff – Camas Seed Orchard HFR:

File details come from the government source that posted it. Updated .