Plans - VA NP BLRI 1K1.pdf
PDF 33 MB Posted
- Attached to
- VA NP BLRI 1K1 - Blue Ridge Parkway
- Solicitation number
- 693C73-26-B-000004
About this file
This file is a project plan for Blue Ridge Parkway improvements prepared by the Federal Highway Administration for the U.S. Department of Transportation. The project is located in Bedford County, Virginia, and involves pavement rehabilitation along a 3.04-mile segment from mile post 86 to mile post 89. Specific work includes full depth reclamation, drainage improvements, signage installation, and miscellaneous infrastructure enhancements.
The related federal contract opportunity (Solicitation Number 693C73-26-B-000004) is exclusively set aside for certified Small Business Concerns, with an estimated project cost between $4,000,000 to $7,000,000. The bid documents are expected to be issued on or about November 20, 2025, with bid details to be posted on SAM.gov. Potential bidders must have an active registration in the System for Award Management (SAM) and are advised to check the website for complete solicitation documentation and updates. Questions about the construction project should be directed to eflhd.contracts@dot.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA NP BLRI 1K1
PLANS FOR PROPOSED PROJECT
VIRGINIA
BEDFORD COUNTY,
NATIONAL
PARK
SERVICE
Project Manager
SHEILA FORONDA
Lead Designer
CHRIS BURNELL
Highway Design Manager
BRADLEY PROCTOR
INDEX TO SHEETS
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OCTOBER, 2025
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
N/A
Blue Ridge Parkway improvements, signage, and other miscellaneous work.
This project consists of full depth reclamation, drainage
1,299 e(max) 8%
C/A None
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 3.04 Miles
ADT (2025)
ADT (2045)
DHV
%Truck
D
V (MPH)
60/40
<1%
SPECIFICATIONS:
DESIGN DESIGNATION:
LANE MILES:
and Bridges on Federal Highway Projects", FP-24.
"Standard Specifications for Construction of Roads
BRIDGE:
ROAD: WIDTH
20'
SURFACE BASE SUBGRADE
7"-9" ACP 6"-16.8" N/A
Cycle #(miles)
RIP Milepost/ Schedule Description Station to Station Length Lane Miles
Know what'sbelow.
before you dig.Call
R
Title Sheet
Symbols And Abbreviations
Location Map
Survey Control Data
Typical Section
Tabulation of Quantities
Construction Plans
Erosion and Seidment Control Plans
DESCRIPTION
SHEET
NO
A01
A02-A03
A04
A05-A06
B01
C01-C02
D01-D15
M01-M04
M05-M19
M20
Erosion and Sediment Control Narrative
C03-C11 Summaries and Schedules
A07-A14 Alignment Chain Description
VA NP BLRI 1K1
PARKWAY PAVEMENT REHABILITATION
SCALE IN FEET
0 15000 30000
6.36 Miles
N
0 4040
SCALE IN MILES
Richmond
Arlington
Charlottesville
Front
Royal
KEY MAP
STATE OF VIRGINIA
VA NP BLRI 1K1
N http://va811.com
811 or (800)-522-3120
Virginia811 prior to digging:Call
A
B
Blue Ridge Parkway, 0001AC
Blue Ridge Parkway, 0001AC
80+91 to 163+00
2+43 to 80+91
1.55
1.49
MP 87.5 to MP 89.05/Cycle 6
MP 86 to MP 87.5/Cycle 6
Temporary Traffic Control Narrative
N03-N09 Temporary Traffic Control Detour Plan
Standards And DetailsS01-S22
3.11
3.25
(miles)
N01-N02
Soil Map
© 2025 Microsoft Corporation © 2025 TomTom
BLUE RIDGE PARKWAY
NATIONAL PARK SERVICE
U.S. DEPARTMENT OF THE INTERIOR
:1
A
M
O c to b e r
T it le S h e e t
N P
S
P R
O J E
C T
S \b lr i\ k \H
W Y
D
E S
\C A
D D
\A -B
L R
I_ K tt l.
d g n
PROJECT
NUMBER
SHEET
A01
NPS Drwg No. 601/195443 NPS PMIS No. 323862A
0.00EL.
BH TP
sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
V vertical point of intersection vehicles per hour varies design speed
W west mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S
1 6
1 6
SEC.
SEC.
E
N 0
00000
JH
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
HW
hex.
hdwl.
inv.
ID
jt.
high water hexagon headwall invert inside diameter joint ftg.
flg.
fin.
footing flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
LW
lt. or LT Ls
LPSM
long.
LOD
lat.
lam.
L low water left length of spiral lump sum longitudinal Limits of Disturbance latitude lamination length of curve gnd or grnd galv.
GAB
ga.
HW
hex.
hdwl.
ground galvanized graded aggregate base gage (gauge) high water hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:1
O c to b e r
S
H E
E T
P
R O
J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \A
X X
-A X
X -B
L R
I_
K
O
R D
E
F L
H D s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
N
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Barricade
N.T.S. Not to scale
Sheet 2 of 2
:3
N o v e m b e r
S H
E E
T
P R
O J E
C T
S \b lr i\ k \H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K
O
R D
E
F L
H D s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
4.3 miles
Buchanan
N
.6 m il e s
M u n fo rd
.7 m ile s
B e d fo rd
.9 mi lesSn owde n
2+43
MP 86,
End Schedule B, 80+91
Begin Schedule B, End Schedule A, 163+00
MP 89.05,
Begin Schedule A, .6 m ile s
M o n tv a le
NO SCALE
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
BLUE RIDGE PARKWAY
k e e r
C s g ni n n eJ ke er
C yn ot S elt tiL
© 2025 Microsoft Corporation © 2025 TomTom
:5 c to b e r
L o c a ti o n
M a p
P R
O J E
C T
S \b lr i\ k \H
W Y
D
E S
\C A
D D
\A -B
L R
I_ K lo c .d g n
PROJECT
A04
PROJECT CONTROL POINTS
NAME NORTHING EASTING ELEV. TYPE
100 3691789.14 11155161.20 2375.01 RBAR#CAP
101 3691426.06 11155503.64 2407.03 RBAR#CAP
102 3691297.73 11155847.43 2424.32 RBAR#CAP
103 3691272.73 11156223.58 2438.75 RBAR#CAP
104 3691074.42 11156511.84 2444.25 RBAR#CAP
105 3690896.11 11156732.98 2448.09 PK
106 3690625.83 11156958.73 2452.05 RBAR#CAP
107 3690282.19 11157004.40 2453.17 RBAR#CAP
108 3689900.97 11157063.86 2456.20 RBAR#CAP
109 3689463.72 11157173.44 2459.11 RBAR#CAP
110 3689069.58 11157160.26 2463.60 RBAR#CAP
111 3688939.96 11157476.40 2461.33 RBAR#CAP
112 3688813.50 11157865.98 2467.55 RBAR#CAP
113 3688454.53 11158162.44 2473.71 RBAR#CAP
114 3688147.37 11158382.23 2474.17 RBAR#CAP
115 3687759.02 11158455.54 2474.01 RBAR#CAP
116 3687460.52 11158556.44 2482.35 RBAR#CAP
117 3687497.88 11159047.43 2477.57 RBAR#CAP
118 3687263.40 11159594.87 2469.92 RBAR#CAP
119 3687300.73 11160034.35 2450.20 RBAR#CAP
120 3687385.55 11160457.66 2429.96 RBAR#CAP
121 3692105.61 11155087.12 2349.24 RBAR#CAP
122 3692464.71 11155087.88 2323.57 RBAR#CAP
123 3692894.04 11154908.85 2288.09 RBAR#CAP
124 3693178.08 11154641.48 2259.72 RBAR#CAP
125 3693496.38 11154110.41 2211.27 RBAR#CAP
126 3693827.00 11153818.78 2186.74 RBAR#CAP
127 3694016.79 11153386.02 2158.16 RBAR#CAP
128 3694273.26 11153461.96 2143.55 RBAR#CAP
129 3694530.47 11153806.29 2114.75 RBAR#CAP
PROJECT COORDINATE SYSTEM
Coordinate System : US State Plane 1983
Zone : Virginia South 4502
Hor. Datum : NAD 1988 (Conus)
Vert. Datum : NAVD 1988 (Conus)
Geoid Model : GEIOD18
Units : International Foot
130 3694737.45 11153806.80 2103.61 RBAR#CAP
131 3694866.09 11153576.21 2085.92 RBAR#CAP
132 3694922.42 11153227.53 2062.82 RBAR#CAP
133 3695245.28 11153077.02 2039.48 RBAR#CAP
134 3695441.38 11152812.47 2015.60 RBAR#CAP
135 3695574.54 11152569.52 1998.89 RBAR#CAP
136 3695872.18 11152559.95 1975.99 RBAR#CAP
137 3696399.37 11152683.07 1935.84 RBAR#CAP
138 3696870.38 11152722.46 1909.49 RBAR#CAP
139 3697134.74 11152329.15 1871.34 RBAR#CAP
140 3697378.20 11152014.69 1846.38 RBAR#CAP
141 3697467.19 11151488.50 1815.17 RBAR#CAP
PROJECT CONTROL POINTS
NAME NORTHING EASTING ELEV. TYPE
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
:5
D e c e m b e r
A
S u r v e y
C o n tr o l
D ta
P R
O J E
C T
S \b lr i\ k \H
W Y
D
E S
\C A
D D
\A -B
L R
I_ K s u r.
d g n
SURVEY CONTROL DATA
PROJECT
A05
RBAR W/CAP
STOP
RBAR W/CAP
124.3 1'
Az. 2 60°
.42
Az.
1°
RBAR W/CAP
8 S I L T
E D x .9
R C
P
RBAR W/CAP
51.52'Az. 107°
.8 6'
Az . 5
9°
R B A R
M A
G
"x
.4
R C P
RBAR W/CAP
115.17' Az.116°
.4
A z.1
R B
A R W /C
A P
RBAR W/CAP
475.43'
Az.304° TO
REBAR 139
.3
A z .1
T
O R
E B
A R
R B
A R W
C
A P
3Wx2.5Rx226.75' BOX
.3
A z .5
T
O R
E B
A R
120.6'
A z.128°
.5 8'
Az .5 7°
RBAR W/CAP
R B
A R W
C
A P
18"x59.94' RCP
RBAR W/CAP
.1
A z .1
R B
A R W /C
A P
"x
.5 ' R
C P
RBAR W/CAP
.7
A z .5
RBAR W
/CAP
x .5
R C P
E L E
V .2
RBAR W/CAP
95.
01'
Az.
73°
R B
A R W /C
A P
M A
G
"x1
.95 ' R
CP
RBAR W/CAP
.0
A z .3
RBAR W
/CAP
NAIL
x .4
R C P
Blue Ridge Pkwy Rte. 43
RBAR W/CAP
120.03' Az.298°
RBAR W/CAP
x .2
R C
P
RBAR W/CAP
45.24' Az.283°
.2
A z.3
R B
A R W /C
A P
RBAR W/CAP
.4
A z.3
.2
A z .1
T
O R
E B
A R
9 1
R B
A R W C
A P
RBAR W/CAP
.2
A z T
O R
E B
A R
0.
A z.
TO
R
EB
A R
R B A R W /C
A P
M A G
RBAR W/CAP
0.
A z.
3° T
O R
EB
A R
R B
A R W /C
A P
4'R x3 'W x1 .94 ' B
OX
RBAR W/CAP
30.21'Az. 112°
.9
A
z. 3
RBAR W
/CAP
25M P H
RBAR W/CAP
.3
A z
.1
A
z. 3
RBAR W
/CAP
M A G
'x 'x .9
B
O X
RBAR W/CAP
89.18' Az. 282°
.3
A
z. 3
R B A R W /C
A P
RBAR W/CAP
621.04'
Az. 301° TO REBAR 125
.1
A
z. 1
° T
O R
E B A R
R B
A R W /C
A P
RBAR W/CAP
35.71'
Az. 89°
.1
A z
R B
A R W C
A P
OUTLE
T N
OT FND30"
x??'
RCP
RBAR W/CAP
63.32'
Az. 127°
35.09'
Az. 91°
R B
A R
M A
G
RBAR W/CAP
R B
A R W /C
A P
RBAR W/CAP
.9
A z . 1
.7
A z
R B A R W /C
A P
MAG
x .3
R C P
RBAR W/CAP
.4
A z
RBAR W/CAP
110.88'
Az. 123° 145.47' Az. 97°
RBAR W/CAP
x .6
R C
P
RBAR W/CAP
73.28' Az. 102°
25.3 4'
Az.
349.93'
Az. 125°
R B A R W /C
A P
RBAR W/CAP
349.93'
Az. 125° TO
REBAR 103
284.10'
A
z. 129° TO
R
EB
A R
P K
"x
.1 R C P
PK
284.10'
A
z. 129°
.5 5'
Az . 5
9°
A z . 1
R B
A R W /C
A P
N A
IL
N A
IL
"x
5.
' R
CP
RBAR W/CAP
.1
A z . 3
R B
A R
W /C
A P
4'Wx3'Rx142.41' BOX
RBAR W/CAP
43.
35'
Az.
5°
39.49' Az. 100°
R B
A R W C
A P
RBAR W/CAP
20.31'Az. 116°
.5 9'
Az . 2
R B
A R
W /C
A P
N A I L
24"x129.84' RCP
RBAR W/CAP
.0
A z . 3
R B
A R W /C
A P
18" x80 .03
' RCP
RBAR W/CAP
.7
A
z. 1
.2
A z
RBAR W/CAP
NAIL
RBAR W/CAP
.4
A
z. 1
.9
A z.
RBAR W
/CAP
N A
IL
x x .4
B
O X
S P E E D
LIM
IT4
RBAR W/CAP
36.87'
Az. 269°
65.32' Az. 125°
R B
A R W /C
A P
"x
.4 9' C
IP
RBAR W/CAP
52.15'Az. 284°
.1
A z . 3
R B
A R W /C
A P
RBAR W/CAP
.6
A z . 1
T
O R
E B
A R
R B
A R W
C
A P
INFO
RBAR W/CAP
.1
A z
.3
A z
RBAR W
/CAP
RBAR W/CAP
.2
A z . 1
T
O R
E B
A R
492.43'
Az. 266° TO REBAR 117
RBAR W/CAP
INFO.
x .0
R C P
RBAR W/CAP
.4
A z
.7
Az
4°
RBAR W/CAP
JCT
RBAR W/CAP
.4
A z . 1
87.96'
Az. 268°
RBAR W/C
AP
KEEP
RIGHT
RBAR W/CAP
45.36' Az. 124°
.5
A z . 3
RBAR W
/CAP
TP
30"
TREE
STOP
RBAR W/CAP
.8
A z . 1
.5 9'
Az . 6
1°
N N N N N N N N N
N
N N N N N N
N N N N N N N N N
N N N N N N N N N
N N N N NN
N
N
Lat. 37.4705197748
Long. -79.6378899137
Lat. 37.4641296643
Long. -79.6340586657 Lat. 37.4634119402
Long. -79.6352343147
Lat. 37.4604432053
Long. -79.6311253889
Lat. 37.4547274258
Long. -79.6245954837
Lat. 37.4552625974
Long. -79.6255966367
Lat. 37.4467500496
Long. -79.6180328755
Lat. 37.4448694547
Long. -79.6174048099
Az. 102°
4.83'
Az
4°5.
A z
.9
Az . 6
1°15 .2 6'
A z
.1
A z . 3
.1
Az. 113°
5.88'
A z
.1
Az.
4° 40.
57'
A z
.9
Az. 266°
5.21'
Az . 5
6°4.
A z.
.9
Az. 90°
3.49'
A z
.2
1. Azimuth angle shown is based on north axis at clockwise rotation.
2. Existing utilites shown on map are mapped to Quality Level C.
NOTES:
N.T.S.
N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S.
N.T.S.
N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S.
N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S.N.T.S.
N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S.
N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. N.T.S.
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
NO SCALE
:5
D e c e m b e r
A
S u r v e y
C o n tr o l
D ta
P R
O J E
C T
S \b lr i\ k \H
W Y
D
E S
\C A
D D
\A -B
L R
I_ K s u r.
d g n
SURVEY CONTROL DATA
PROJECT
A06
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 8
BLUE RIDGE PARKWAY
:4
N o v e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A07
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 8
BLUE RIDGE PARKWAY
:4
N o v e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A08
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 3 of 8
BLUE RIDGE PARKWAY
:4
N o v e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A09
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 4 of 8
BLUE RIDGE PARKWAY
:4
N o v e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A10
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 5 of 8
BLUE RIDGE PARKWAY
:5
D e c e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A11
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 6 of 8
BLUE RIDGE PARKWAY
:4
N o v e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A12
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 7 of 8
BLUE RIDGE PARKWAY
:5
D e c e m b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A13
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 8 of 8
BLUE RIDGE PARKWAY
:4
O c to b e r
A li g n m e n t
D a ta
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\A X
X -A
X X
-B L
R I_
K a li
.d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A14 turf establishment (typ.)
Aggregate-topsoil course, " NMSA, 0.3 to <3 Million ESAL4
2½" depth, ACP, Gyratory Mix, TANGENT SECTION
FULL DEPTH RECLAMATION WITH CEMENT (FDR)
BLUE RIDGE PARKWAY
Type III-B pavement roughness
1½" depth, ACP, Gyratory Mix, ⅜” NMSA, 0.3 to <3 Million ESAL, Lane- +10.5' Lane-
+10.5'
Existing Match
Existing Match
Existing asphalt concrete pavement
Tack coat
Existing aggregate base
CL
EXISTING PROPOSED
of full depth reclamation with cement.
Remove and haul any additional material in order to achieve 8-inches5.
curb sections after final paving.
Reestablish a minimum 5.5-inch curb reveal along all existing and proposed4.
by the CO.
Shoulder width varies. Grade to ensure proper drainage as directed3.
Maintain roadway grades to existing field conditions as directed by the CO.2.
Match the existing pavement cross slopes as directed by the CO.1.
NOTES:
See Note 5 8" depth, Full Depth Reclamation With Cement, 5'± Shoulder turf establishment (typ.)
Aggregate-topsoil course, " NMSA, 0.3 to <3 Million ESAL4 32½" depth, ACP, Gyratory Mix, SUPERELEVATED SECTION
FULL DEPTH RECLAMATION WITH CEMENT (FDR)
BLUE RIDGE PARKWAY
Type III-B pavement roughness 1½" depth, ACP, Gyratory Mix, ⅜” NMSA, 0.3 to <3 Million ESAL, Lane- +10.5' Lane-
+10.5'
Existing Match
Exisitng asphalt pavement Tack coat
Exisitng aggregate base
CL
EXISTING PROPOSED
8" depth, Full Depth Reclamation With Cement
5'± Shoulder
Existing ground (typ.)
Existing ground (typ.)
NO SCALE
5'± Shoulder
5'± Shoulder
Asphalt curb (typ.)
Varies
Detail E609-01A for curb installation.
See plans for curb location. See
DETAIL A
See Detail A Curb section, Profile grade
Profile grade
<½" elevation difference (typ.)
<½" elevation difference (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
:3
J u n e
B
S h e e t
M
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
B
S h e e ts .d g n
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
B01
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
BLUE RIDGE PARKWAY
:3
O c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
TABULATION OF QUANTITIES
PROJECT
C01
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
BLUE RIDGE PARKWAY
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
TABULATION OF QUANTITIES
PROJECT
C02
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
BLUE RIDGE PARKWAY
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C03
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
BLUE RIDGE PARKWAY
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C04
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
BLUE RIDGE PARKWAY
:3
O c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C05
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
BLUE RIDGE PARKWAY
NOTES
& E633-02.
Install sign post supports according to Details E633-012.
latest edition.
"Manual on Uniform Traffic Control Devices" (MUTCD), Construct and erect all signs in accordance with the 1.
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C06
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
BLUE RIDGE PARKWAY
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C07
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
BLUE RIDGE PARKWAY
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C08
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
BLUE RIDGE PARKWAY
:3 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C09
NOTES
& E633-02.
Install sign post supports according to Details E633-012.
latest edition.
"Manual on Uniform Traffic Control Devices" (MUTCD), Construct and erect all signs in accordance with the 1.
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
BLUE RIDGE PARKWAY
:2 c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C10
NOTES:
Highway Signs", Revision 1.
Uniform Traffic Control Devices", Revision 1, and "Virginia Standard
Protection Manual", Revision 2.1, Virginia's supplement of the "Manual on
Transportation's right-of-way in accordance with the "Virginia Work Area
Fabricate and install signs within the Virginia Department of4.
Work Area Protection Manual", Revision 2.1.
MUTCD Numbers with a "V" designation reference signs in the "Virginia3.
Work Area Protection Manual", Revision 2.1.
Refer to Figure TTC-53.0 (Signing for Project Limits) in the "Virgina2.
Traffic Control Devices" (MUTCD), latest edition.
Construct and erect signs in accordance with the "Manual on Uniform1.
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
:3
O c to b e r
C
P R
O J E
C T
S \b lr i\ k
\H
W Y
D
E S
\C A
D D
\B L
R I_
K
C S h e e ts
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C11
20"
TREE
36"
TREE 28"
TREE
30" TREEE
L E
V .0
ELEV. 2428.42'
TP
RBAR W/CAP
STOP
INFO.
x .4
R C
P
43Bedford
NEXT RIGHT
36" TREE
6" TREE
30" TREE
RBAR W/CAP
STONE HEADWALL
STONE HEADWALL
N
M A
T C
H L I
N E
Construction centerline
E 11160496.3262
N 3687438.3005
2+43 (MP 86)
FULL DEPTH RECLAMATION 8" CEMENT
END SCHEDULE B
END PROJECT
R=14' R=13'
2+43 to 2+68
4" solid yellow, Type C, Place pavement markings, 25 lnft, 2+43 to 2+57
4" solid white, Type C, Place pavement markings, 13 lnft, 2+43 to 2+69
4" solid yellow, Type C, Place pavement markings, 26 lnft, 2+43 to 7+20
4" solid white, Type C, Place pavement markings, 477 lnft, 3+20 to 7+20
4" solid yellow, Type C, Place pavement markings, 400 lnft, 3+24 to 7+20
4" solid yellow, Type C, Place pavement markings, 396 lnft, 3+59 to 7+20
4" solid white, Type C, Place pavement markings, 361 lnft, R=50'
R=27'
ONE
WAY
R6-2, 3+16
Remove and replace sign, 2+43 to 7+20
4" dashed white, Type C, Place pavement markings, 477 lnft
2+43 to 7+20
4" dashed white, Type C, Place pavement markings, 477 lnft
Proposed edge of pavement
MP 86
GENERAL NOTE
Install riprap, Class 2 at the end of waterways as directed by the CO.
S75°04'13"W
PI 5+65.74
Δ = 06°14'48" (RT)
R = 3,800.00' T = 207.35' L = 414.30' e = ___
P C
.3
P O
B
.0
0 1 2 3 4 5 6
BORE
Blu e R idg e P kw y R te.
ASPHALT DITCH
E L E
V . 2
.8
"x
.4
R C
P
E L E
V . 2
.9
RBAR W/CAP KEEP
RIGHT
JCT
RBAR W/CAP
STONE HEADWALL
STONE HEADWALL
SPEED LIM
IT
35 N
M A
T C
H L I N
E
M A
T C
H L
IN
E
Construction centerline
R4-7, 7+56 Remove and replace sign, R=3'
10+73 M2-1, M1-V1a, Remove and replace signs, JCT
7+20 to 7+54 4" dashed white, Type C, Place pavement markings, 34 lnft, 4" dashed white, Type C, 7+20 to 7+56 Place pavement markings, 36 lnft, 7+20 to 7+68 4" solid white, Type C, Place pavement markings, 48 lnft, 4" solid white, Type C, 7+20 to 7+54 Place pavement markings, 34 lnft, 4" solid yellow, Type B, 7+20 to 9+01 Place pavement markings, 181 lnft, 4" solid yellow, Type C, 7+20 to 9+01 Place pavement markings, 181 lnft, Proposed edge of pavement
9+01 to 80+91 4" double solid yellow, Type C, Place centerline striping, 14,380 lnft, R2-1, 13+88 Remove and replace sign, SPEED
LIMIT
24" RCP and inlet, 7+30 Clean culvert in place, See Detail E629-02 7+33 left, and RECP, Type 2.C, 14 sqyd, Ditch reconditioning, 25 lnft, See Detail E608-05 9+00 to 10+00 right, Type 5, 33 sqyd, Remove and replace paved waterway, to 14+60 right 460 lnft, 10+00
,in place (paved waterway) Clean drainage structure
12+20 to 16+88 left Shoulder reconditioning, 260 sqyd, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
2+43 TO 14+60SCALE IN FEET
0 25 50
S81° 19'01
"W
S88°00'13 "W
PI 9+86.82
Δ = 06°41'12" (RT)
R = 1,100.00' T = 64.26' L = 128.37' e = ___
PI 12+78.77
Δ = 33°05'38" (RT)
R = 576.00' T = 171.13' L = 332.70' e = ___
P T
.6
P C
.5
P T
.9
P C
.6
P T
.3
:2
O c to b e r
B L R
I_ K
P la n
S h e t]
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D01
REDUCE
SPEED
AHEAD
Blu e R idg e P kwy R te.
E L E
V . 2
.6 x .1 ' R
C P
E L E
V .8
E L E
V . 2
.9
STONE HEADWALL
STONE HEADWALL
x .0
C
IP
E L E
V .5
RBAR W/CAP
INFO.
NM
A
T C
H L I N
E
M A
T C
H L I
N E
0Construction centerline
Proposed edge of pavement
W3-5, 20+04
Remove and replace sign, LIMIT
SPEED
416 lnft, 17+67 to 21+80 right
, in place (paved waterway)
Clean drainage structure
57 sqyd, See Detail E629-02 and RECP, Type 2.C,16+74 to 17+67, Ditch reconditioning, 103 lnft right, right214 lnft, 14+60 to 16+74
,in place (paved waterway)
Clean drainage structure
18" RCP and inlet, 17+16
Clean culvert in place,1
N58°54'09"W
S7 8°4
4'1 9"W
PI 17+59.62
Δ = 42°21'32" (LT)
R = 326.29' T = 126.42' L = 241.23' e = ___
P C
.2
P T
.4
P C
.7
7 1
ASPHALT DITCH
R
BAR
W /C
AP
RBAR W/CAP N
Construction centerline
Proposed edge of pavement
21+80 to 24+40 right in place (paved waterway), 243 lnft, Clean drainage structure
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
14+60 TO 24+40SCALE IN FEET
0 25 50
N08°22'43"W
PI 23+05.58
Δ = 92°52'58" (RT)
R = 218.59' T = 229.87' L = 354.36' e = ___
P T
.0
:2
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D02
VA NP BLRI 1K1
M A T
C H L
IN
E
M A T
C H L
IN
E
D I R . O
N L Y
E L E
V . 2
.7
'R x
W ' C
O N
C . B
O X
STONE H
EADWALL
IN
FO
RBAR
W/
CAP
RBAR W/CAP
NAIL
R
C P O
U T F A
L L U
N K
N O
W N
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
24+61 right
21 lnft, 24+40 to
,in place (paved waterway)
Clean drainage structure
25+17 to 29+00 left
Shoulder reconditioning, 212 sqyd, 2'x2' box culvert and inlet, 27+39
Clean culvert in place, N08°22'43"W
N02°03'38"E
PI 24+82.17
Δ = 10°26'21" (RT)
R = 224.00' T = 20.46' L = 40.81' e = ___
PI 28+10.96
Δ = 36°47'17" (LT)
R = 420.00' T = 139.67' L = 269.67' e = ___
P C
.2
P C
.7
P T
.5
E L E
V . 2
.8
"x
.5 ' C
IP
STONE HEADWALL
+E L E
V . 2
.0
RBAR W/CAP
RBAR W/CAP
INFO.
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement29+00 to 29+42 left Shoulder reconditioning, 23 sqyd, 18" RCP and inlet, 32+89 Clean culvert in place, See Detail E629-02 RECP, Type 2.C, 31 sqyd,and
32+33 to 32+88 right, Ditch reconditioning, 55 lnft, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
24+40 TO 36+20SCALE IN FEET
0 25 50
0 3
N34°43'39"W N37°31'32"W
PI 31+50.41
Δ = 02°47'53" (LT)
R = 2,010.50' T = 49.10' L = 98.18' e = ___
P T
.9
P C
.3
P T
.4
P C
.3
9 3 0 3
:1
S e p te m b e r
B
L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D03
SP
EED LIM
IT
ASPHALT DITCH
E L E
V . 2
.8 x .0
' R
C P
ELEV. 2402.93'
CONCRETE
HEADWALL
E L E
V . 2
.8
CONCRETE
HEADWALL
E L E
V . 2
.4
STONE HEADWALL
'R x 'W x .5 ' C
O N
C . B
O X x ' R
C P
E L E
V . 2
.5
E L E
V . 2
.1
STONE HEADWALL
NAIL
RBAR W/CAP
NAIL
RBAR W/
CAP
C O
N F
IR
M L
O C
A T
IO
N
P
IP
E N
O T O
N P
L A
N S
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
See Detail E629-02
RECP, Type 2.C, 32 sqyd,and
58 lnft, 37+55 to 37+90 right, Ditch reconditioning, R2-1, 37+32
Remove and replace sign, SPEED
LIMIT
3'x3' box culvert, 37+58
Clean culvert in place, 79 lnft, 42+61 to 43+40 right
,in place (paved waterway)
Clean drainage structure
N75°5 6'19
"W
N73°46 '28"W
PI 42+57.04
Δ = 02°09'51" (RT)
R = 2,989.50' T = 56.47' L = 112.92' e = ___
PI 38+25.57
Δ = 38°24'47" (LT)
R = 910.50' T = 317.19' L = 610.43' e = ___
P T
.8
P C
.5
P T
.4
8 3
ASPHALT DITCH
E L E V . 2
.8
"x
.0 ' R
C P
E L E V . 2
.8
RBAR W/CAP
N
M A T C
H L
IN
E
M A
T C
H L
IN
E
Construction centerline
Proposed edge of pavement
43+40 to 46+60 right , 320 lnft,in place (paved waterway)
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
36+20 TO 46+60SCALE IN FEET
0 25 50
N73 °4
6' "W
PI 45+44.94
Δ = 72°28'05" (RT)
R = 234.50' T = 171.84' L = 296.60' e = ___
PC
.1
.6
:4
S e p te m b e r
B
L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D04
ASPHALT DITCH
E L E
V . 2
.9
STONE HEADWALL
x .8 ' R
C P
E L E
V . 2
.3
STONE HEADWALL
NAIL
RBAR W/CAP
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
139 lnft, 46+60 to 47+99 right
,in place (paved waterway)
Clean drainage structure right48+91 to 50+80
, 189 lnft,in place (paved waterway)
Clean drainage structure
N01°18'24"W N03°53'56"E
PI 47+23.57
Δ = 05°12'20" (RT)
R = 339.50' T = 15.43' L = 30.84' e = ___
P C
.1
P T
.6
P C
.1
P T
.9
7 4 8 4
9 5
ASPHALT DITCH
E L E
V . 2
.2
E L E
V . 2
.2
STONE HEADWALL
STONE HEADWALL
STONE HEADWALL
STONE HEADWALL
'R x 'W x .4 ' C
O N
C . B
O X
E L E
V . 2
.1
"x
.9 ' C
IP
E L E
V . 2
.2
E L E
V . 2
.7
"x
.9 ' R
C P
RBAR W/C
AP
+E L E
V . 2
.9
RBAR W/CAP
E L E
V . 2
.4
CONC. DROP INLETCONC. DROP INLET
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
18" RCP, 51+18
Clean culvert in place, 18" RCP, 51+90
Clean culvert in place, 663 lnft, 50+80 to 57+43 right ,in place (paved waterway)
Clean drainage structure
MP 87
3'x4' box culvert, 57+54 Clean culvert in place, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
46+60 TO 58+00SCALE IN FEET
0 25 50
N18°02'31 "W
N02°19'56"W
PI 55+32.69
Δ = 15°42'35" (RT)
R = 839.50' T = 115.82' L = 230.18' e = ___
PI 50+75.60
Δ = 21°56'27" (LT)
R = 910.50' T = 176.50' L = 348.67' e = ___
P T
.7
P C
.8
P T
.0
5 5
:5
O c to b e r
B L
R I_
K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D05
Blue Ridge Pkwy Rte. 43
E L E
V . 2
.0
STONE HEADWALL
STONE HEADWALL
STONE HEADWALL
STONE H
EADWALL
STONE H
EADWALL
E L E
V . 2
.7
R
C P
D I R . O
N L Y
E L E
V . 2
.5 x .5
' R
C P
STONE HEADWALL
x .8 ' R
C P
E L E
V . 2
.8 x .1 ' R
C P
E L E
V . 2
.3
E L E
V . 2
.3
PK
CONC. DROP INLET
NAIL
E L E
V . 2
.4
NAIL
NAIL
RBAR W/CAP
N
M A
T C
H L I N
E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
See Detail E629-02
RECP, Type 2.C, 13 sqyd,and
24 lnft, 60+10 to 60+32 right, Ditch reconditioning, See Detail E629-02
RECP, Type 2.C, 14 sqyd,and
25 lnft, 60+37 to 60+61 right, Ditch reconditioning, 18" RCP, 59+92
Clean culvert in place, 18" RCP, 60+36
Clean culvert in place, 18" RCP, 64+58
Clean culvert in place, 30" RCP, 61+41
Clean culvert in place, 61+84 to 65+20 right
, 335 lnft,in place (paved waterway)
Clean drainage structure
See Detail E251-01
11 tons, 61+37 left, Install riprap, Class 2, N41°0 6'18
"W
PI 60+30.15
Δ = 38°46'21" (LT)
R = 537.94' T = 189.29' L = 364.03' e = ___
PI 63+70.06
Δ = 02°09'59" (LT)
R = 4,110.50' T = 77.72' L = 155.42' e = ___
P C
.8
P T
.8
P C
.3
P T
.7
0 6
ASPHALT
DIT
CH
E L E
V . 2
.7
"x
.6 ' R
C P
E L E
V . 2
.6
STONE HEADWALL
RBAR W/CAP
RBAR W/C
AP
N
M A
T C
H L I N
E
0 M
A T
C H
L I N
E
Construction centerline
Proposed edge of pavement
65+20 to 69+38 , 425 lnft,in place (paved waterway)
Clean drainage structure
71+69 to 72+60 left , 87 lnft,in place (paved waterway)
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
58+00 TO 72+60SCALE IN FEET
0 25 50
0N43°25'42"W
PI 69+56.08
Δ = 40°13'19" (LT)
R = 848.08' T = 310.54' L = 595.36' e = ___P
C
.5
P T
.9
8 6
:4
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D06
BORES
ASPHALT DITCH
E L E
V . 2
.3 x .3 ' R
C P
E L E
V . 2
.1
STONE HEADWALL
STONE HEADWALL
RBAR W
/CAP
MAG
MAG
RBAR W/CAP
N
M A
T C
H L I
N E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
78+47 to 79+80 in place (paved waterway), 133 lnft, Clean drainage structure right125 lnft, 78+51 to 79+80
,in place (paved waterway)
Clean drainage structure
See Detail E608-05
13 sqyd, 77+93 to 78+32 right, paved waterway, Type 5, Remove and replace
72+60 to 75+97 left
, 345 lnft,in place (paved waterway)
Clean drainage structure
See Detail E629-02
RECP, Type 2.C, 11 sqyd,and
20 lnft right, 77+02 to 77+06, Ditch reconditioning, See Detail E629-02
RECP, Type 2.C, 27 sqyd, 49 lnft, 76+90 to 77+35 right, Ditch reconditioning, See Detail E609-01A
160 lnft, 76+30 to 77+93 right, Remove and replace curb, asphalt, 6 tons right, 78+35
Install riprap, Class 2, N83° 39'0
1"W
PI 77+11.50
Δ = 38°47'05" (RT)
R = 705.33' T = 248.28' L = 477.45' e = ___
P C
.2
2 P T
.6
BORES
ASPHALT DITCH
ASPHALT DITCH
E L E
V . 2
.9
STONE H
EADWALL
STONE H
EADWALL
'R x 'W x .5 ' C
O N
C . B
O X
E L E
V . 2
.6
RBARMAG
MAG
RBAR W/CAP
BLR102
BASE
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
E 11155315.1431 N 3691621.9289
80+91 (MP 87.5)
FULL DEPTH RECLAMATION 8" CEMENT
END SCHEDULE A
BEGIN SCHEDULE B
80+91 to 163+00 4" double solid yellow, Type C, Place centerline striping, 16,418 lnft, 4 tons, 83+64 right Install riprap, Class 2, See Detail E251-01 29 tons, 85+62 right, Install riprap, Class 2, See Detail E608-05 , rightType 5, 38 sqyd, 82+48 to 83+62
Remove and replace paved waterway, 309 lnft, 80+91 to 84+00 left ,in place (paved waterway)
Clean drainage structure 111 lnft, 79+80 to 80+91 left
,in place (paved waterway) Clean drainage structure
79+80 to 80+91 right , 111 lnft,in place (paved waterway)
Clean drainage structure
156 lnft, 80+91 to 82+48 right ,in place (paved waterway)
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
72+60 TO 87+00SCALE IN FEET
0 25 50
N44° 51'
56" W
N03°11'56"W
PI 83+67.90
Δ = 41°40'01" (RT)
R = 625.12' T = 237.88' L = 454.60' e = ___
P C
.0
P T
.6
:1
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D07
D I R . O
N L Y
R
C P
ASPHALT DITCH
ASPHALT D
ITCH
O U
T L E
T N
O T F
N D
E L E
V . 2
.0
BORE
BORE
STONE HEADWALL
RBAR W/CAP
N
M A
T C
H L I
N E
0 M
A T
C H
L I
N E
Construction centerline
Proposed edge of pavement
See Detail E629-02 and RECP, Type 2.C, 11 sqyd, 20 lnft, 90+35 right, Ditch reconditioning, 91+45 to 93+20 left
, 175 lnft,in place (paved waterway)
Clean drainage structure
90+35
Clean culvert in place, N03°11'56"W
P C
.2
0 9
N
ASPAHLT DITCH
E L E
V . 2
.9
'R x 'W C
O N
C . B
O X
O U
T L E
T N
O T F
N D
STONE HEADWALL
RBAR W/CAP
E L E
V . 2
.0
R
C P
D
IR
. O
N L Y
STONE H
EADWALL
RBAR W
/CAP
BORES
N
M A
T C
H L I N
E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement left94+02
(headwall), 7 lnft, Repoint stone masonry
535 lnft, 94+73 to 100+13 left
,in place (paved waterway)
Clean drainage structure
93+20 to 93+50 left
, 33 lnft,in place (paved waterway)
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
87+00 TO 100+20SCALE IN FEET
0 25 50
N56°10 '42"W
PI 94+06.16
Δ = 52°58'47" (LT)
R = 1,149.61' T = 572.92' L = 1,063.01' e = ___
P T
.2
.2
6 9
:1
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D08
CONC. DROP INLET
E L E
V . 2
.6 x .2 ' R
C P
E L E
V . 2
.6
E L E
V . 2
.6
'R x 'W x .0 ' C
O N
C . B
O X
MAG
E L E
V . 2
.7
MAG
RBAR W/CAP
ASPAHLT DITCH
ASPAHLT DITCH
E L E
V . 2
.9
'R x 'W C
O N
C . B
O X
O U
T L E
T N
O T F
N D
STONE HEADWALL
STONE HEADWALL
D I R . O
N L Y
NAIL
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
See Detail E629-02 and RECP, Type 2.C, 42 sqyd, left,75 lnft, 105+87 to 106+38
Ditch reconditioning, See Detail E629-02
RECP, Type 2.C, 42 sqyd,and left,75 lnft, 100+12 to 100+82
Ditch reconditioning, See Detail E629-02
RECP, Type 2.C, 37 sqydand left,67 lnft, 100+82 to 101+43
Ditch reconditioning, 119 lnft, 106+38
Lining 18-inch pipe culvert, 104+02 to 107+27 right, See Detail E609-01A
Remove and replace curb, asphalt, 323 lnft, See Detail E608-05
Type 5, 71 sqyd, 101+63 to 103+73 right, Remove and replace paved waterway, 101+43 to 104+24 left
, 281 lnft,in place (paved waterway)
Clean drainage structure
10 lnft, 104+57 left
Repoint stone masonry (headwall), N55°41'55" W
N45°11'22"W
PI 101+76.80
Δ = 00°28'47" (RT)
R = 24,489.50' T = 102.55' L = 205.09' e = ___
PI 105+41.05
Δ = 10°30'33" (RT)
R = 864.50' T = 79.51' L = 158.56' e = ___
P C
.2
P T
.3
P C
.5
P T
.1
6 1
E L E V . 2
.0
CONC. DROP INLET
S
ILT
E D
"x
.4 ' R
C P
E L E V . 2
.3
25MPH
RBAR W/CAP
BORE
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
108+83 to 110+00 W1-3 and W13-1P, W13-1P and replace Remove signs W1-2 and
MPH
See Detail E629-02 RECP, Type 2.C, 12 sqyd,and right,21 lnft, 111+42 Ditch reconditioning, right4 tons, 107+88 Install riprap, Class 2, 18" RCP, 111+39
Clean culvert in place, 107+64 to 111+38 left , 374 lnft,in place (paved waterway)
Clean drainage structure
107+63 to 108+78 right Shoulder reconditioning, 64 sqyd, See Detail E608-05 23 sqyd, 107+27 to 107+87 right, Remove and replace paved waterway, Type 5, MP 88
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
100+20 TO 113+40SCALE IN FEET
0 25 50
N45°11'22"W
N68°4 0'19
"W
PI 109+46.75
Δ = 23°28'57" (LT)
R = 540.00' T = 112.23' L = 221.32' e = ___
P C
.5
P T
.8
P C
.3
8 1
:4
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D09
L E
V . 2
.7
'R x 'W x .9 ' B
O X
E L E
V . 2
.6
M
AG
STO
N E H
EAD
W
ALL
7 R
B A R W /C
A P
N
M A T C
H L
IN
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
114+30 to 116+00 left in place (paved waterway), 170 lnft, Clean drainage structure
PI 115+32.82
Δ = 121°17'38" (RT)
R = 169.00' T = 300.50' L = 357.77' e = ___
PT 115+
90.08
E L E
V . 2
.9
RBAR W/CAP
"x
.2 ' R
C P
E L E
V . 2
.5
MAG
RBAR W/CAP
CONC. DROP INLET
N
M A
T C
H L I N
E
M A
T C
H L
IN
E
Construction centerline
Proposed edge of pavement
205 lnft, 116+00 to 118+04 left ,in place (paved waterway)
Clean drainage structure left196 lnft, 118+56 to 120+60
,in place (paved waterway)
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
113+40 TO 120+60SCALE IN FEET
0 25 50
N52°37'19"E
N26 °5
1'5 9"E
PI 119+71.57
Δ = 25°45'20" (LT)
R = 320.00' T = 73.16' L = 143.85' e = ___
P C
.4
P T
.2
P C
.8
.0
:5
O c to b e r
B L
R I_
K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D10
RBAR W/CAP
S T
O N
E H
E A
D W
A L L
N
M A T C
H L
IN
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
120+60 to 123+20 left place (paved waterway), 240 lnft, Clean drainage structure in and Detail E617-67 to 122+48. See Standards 617-60 and 617-61
Install 30' structure transition railing, 122+22 timber guardrail, 122+13 to 122+22.
121+90 to 122+13. Install 10' steel-backed
Type SBT-FAT, Install 30' TL-2 guardrail terminal section, N °5
'5 "E
N47 °2
9'
"W
25°45'20"
PI 121+94.44
Δ = 74°21'44" (LT)
R = 190.58' T = 144.56' L = 247.35' e = ___
120+
49.88 P
T
.2
P C
.5
1 1
Blue Ridg e Pkw y Rte
. 43
E L E
V . 2
.8
"x
.4 ' R
C P
E L E
V . 2
.3
NAIL
E L E
V . 2
.4
"x
.3 ' R
C P
E L E
V . 2
.4
RBAR W/CAP
STONE HEADWALL
STONE W
ALL
N
M A
T C
H L
IN
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement left420 lnft, 123+20 to 127+45 ,in place (paved waterway)
Clean drainage structure
18" RCP, 127+29
Clean culvert in place, See Detail 629-02 RECP, Type 2.C, 6 sqyd,and
10 lnft right, 127+32 Ditch reconditioning, 127+20 and W13-1P,W1-3
Place signs,35
MPH
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
120+60 TO 127+60SCALE IN FEET
0 25 50
N47°29'45"W
N80°28'03" W
PI 123+82.34
Δ = 32°58'18" (LT)
R = 242.62' T = 71.80' L = 139.62' e = ___
.5
P T
.1
P C
.4
:5
O c to b e r
B L
R I_
K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D11
"x
.0 ' R
C P
RBAR W/CAP N
M A
T C
H L I N
E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
PI 128+56.59
Δ = 54°22'44" (RT)
R = 300.00' T = 154.11' L = 284.73' e = ___
P T
.2
STONE HEADWALL
STONE HEADWALL
E L E V . 1
.3
E L E
V . 1
.5
"x
.6 ' R
C P
E L E
V . 2
.2
RBAR W/CAP
RBAR W
/CAP
"x1
.0 ' R
C P
MAG
E L E V . 2
.0
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
See Detail E608-05 ,left9 sqyd, 135+67 to 135+93
Install paved waterway, type 5, left463 lnft, 131+02 to 135+67 ,in place (paved waterway)
Clean drainage structure
131+04 to 132+32 right Shoulder reonditioning, 110 sqyd, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
127+60 TO 136+20SCALE IN FEET
0 25 50
N26°05'18"W
N64° 39'4
6"W
PI 133+02.87
Δ = 38°34'27" (LT)
R = 417.09' T = 145.96' L = 280.81' e = ___
P C
.9
P T
.7
P C
.5
2 1
:1
O c to b e r
B L
R I_
K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D12
STONE HEADWALL
STONE HEADWALL
E L E
V . 1
.1 x .6 ' R
C P
E L E
V . 1
.6
RBAR W/CAP
N
M A
T C
H L I N
E
0 M
A T
C H
L I
N E
Construction centerline
Proposed edge of pavement
30" RCP, 137+60
Clean culvert in place, .5
.1
ASPHALT DI
TCH
ASPHALT DI
TCH
18" T
REE
E L E
V . 1
.2
STONE HEADWALL
x .0 ' R
C P
E L E
V . 1
.3
RBAR W/C
AP
BORE
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
145+26 to 145+60 right
34 lnft,in place (paved waterway), Clean drainage structure
647 lnft, 139+13 to 145+60 left
,in place (paved waterway)
Clean drainage structure
See Detail E251-01
5 tons, 141+91 right, Install riprap, Class 2, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
136+20 TO 145+60SCALE IN FEET
0 25 50
N08°43'33"E
N13°05'06"E
PI 138+58.34
Δ = 73°23'19" (RT)
R = 324.50' T = 241.82' L = 415.64' e = ___
PI 141+16.99
Δ = 04°21'32" (RT)
R = 989.50' T = 37.66' L = 75.28' e = ___
P T
.1
P C
.3
P T
.6
0 1 1 1
3 1
:1
O c to b e r
B L
R I_
K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D13
LE
V . 1
.9
.5
R x3
W x2
.8 ' C
O N C B
O X
E
LE
V . 1
.2
M
AG
RBAR W
/CAP
S
TO
N E H
EA
D
W A
LL
S
TO
N E H
EA
D
W A
LL
D A
M A G E
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Construction centerline
Proposed edge of pavement
See Detail E629-02
RECP, Type 2.C, 65 sqyd,and
117 lnft, 145+92 left, Ditch reconditioning, left33 lnft, 145+60 to 145+93
,in place (paved waterway)
Clean drainage structure
145+60 to 146+24 right
, 65 lnft,in place (paved waterway)
Clean drainage structure
147+57
Repair drainage structure, See Detail E629-02 and RECP, Type 2.C, 14 sqyd, 147+57 right, Ditch reconditioning, 25 lnft, PI 146+90.69
Δ = 00°49'42" (LT)
R = 6,010.50' T = 43.45' L = 86.89' e = ___
P C
.2
P T
.1
ASPHAL
T D
ITC
H
RBAR W/CAP
BORE
NM
A
T C
H L
IN
E
M A
TC
H
LIN
E
Construction centerline
Proposed edge of pavement
See Detail E608-05A 164 sqyd, 148+52 to 152+20 left, Recondition paved waterway, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
145+60 TO 152+20SCALE IN FEET
0 25 50
N12°15'24"E
PI 150+95.60
Δ = 72°31'39" (LT)
R = 254.78' T = 186.90' L = 322.51' e = ___
P C
.7
PT 152+
31.20
:4
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D14
ASPHALT DIT
CH
RBAR W/CAP
BORE
x .5 ' R
C P
E L E
V . 1
.4
MAG
RBAR
X .6 ' R
C P
E L E
V . 1
.7
D I R . O
N L Y
D I R . O
N L Y
Blue Ridge Pkwy Rte. 43
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
See Detail E608-05
,right156+98 to 157+10
5 sqyd, waterway, Type 5, Remove and replace paved right11 tons, 157+11
Install riprap, Class 2, 156+99 to 158+95 right
Shoulder reconditioning, 110 sqyd, See Detail E609-01
215 lnft, 154+81 to 156+98 right, Remove and replace curb, asphalt, See Detail E608-05A
, left329 sqyd, 152+20 to 159+60
Recondition paved waterway, asphalt, N60°16'1 6"W
N45°49'23"W
PI 155+07.61
Δ = 14°26'53" (RT)
R = 814.72' T = 103.27' L = 205.44' e = ___
PI 159+10.02
Δ = 34°34'44" (LT)
R = 429.09' T = 133.56' L = 258.96' e = ___
P T
.2
P C
.4
P C
.3
P T
.7
6 1
7 1
STOP
ASPHALT DITCH
RBAR W/
CAP
INFO
S
ILT
E D
"x
.0 ' R
C P
E L E
V . 1
.8
RBAR W/C
AP
N
M A
T C
H L I N
E
E 11151678.4224 N 3697428.3481
163+00 (MP 89.05)
FULL DEPTH RECLAMATION 8" CEMENT
BEGIN SCHEDULE A
Construction centerline
Proposed edge of pavement
159+95, See Detail E620-01 Install stone masonry headwall, 18 lnft, 159+92 to 159+95 Remove and replace 18" RCP, See Detail E608-05A 14 sqyd, 159+60 to 159+92 left, Recondition paved waterway, asphalt, , See Detail E251-01right18 tons, 159+96 Install riprap, Class 2, MP 89
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ROUTE 0001AC
152+20 TO 163+00SCALE IN FEET
0 25 50
N79°56'52"W
159+10.02
P T
.4
P O
E
.5
:2
O c to b e r
B L R
I_ K
P la n
S h e
P R
O J E
C T
S \b lr i\ k
\H W
Y
D E
S \C
A D
D \B
L R
I_
K
D
S h e e ts .d g n
CONSTRUCTION PLAN
PROJECT
D15
KEVIN S ROSE Digitally signed by KEVIN S ROSE Date: 2025.08.15 08:34:01 -04'00'
37.444792
-79.610967
Sheet 2 of 4 value as the existing condition.
60 sqft. The addition of this impervious area has a negligible effect to the coefficient value of 0.94, rendering the same
The new impervious area consists of installing new paved waterway. The impervious area will increase approximately by
0.31 acres. The receiving water is McFalls Creek.
riprap, ditch reconditioning, and shoulder reconditioning. The total disturbed area for the project is approximately
Soil disturbing activities include replacement of pipe culverts, removal and installation of paved waterways, placing
This project consists of full depth reclamation, drainage improvements, signage, and other miscellaneous work.
Project Description
8802.
40 CFR 112. Report spills large enough to discharge to surface waters to the National Response Center at 1-800-424-
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the requirements under on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
clearly marked containers away from other nonwasted materials. Do not dispose of hazardous waste materials into the activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in appropriate and generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct these
Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers. Collect and contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis all mechanized equipment used in or near surface water to prevent garbage, and sanitary waste.
materials; fuels, oils, and equipment-related compounds; soaps and solvents used for vehicle washing; and, waste, The following discharges are prohibited: wash-water from concrete, paint, curing compounds, and other construction
Prohibited Discharges control measures. Direct storm runoff to vegetated buffer areas and do not discharge directly into surface waters.
sediment outside the project limits. Do not allow construction equipment to operate down-slope of the perimeter construction access will be permitted through a wetland or waterway. Do not allow construction vehicles to track
Do not modify the type, size, or location of any measure or practice without prior approval from the CO. No
Roads and Bridges on Federal Highway Projects, FP-24, and the Special Contract Requirements.
Erosion and Sediment Control measures are defined and outlined in the Standard Specifications for Construction of
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment. The
General Guidelines the Minimum Standards of VESCH unless waived or approved by variance.
of the Virginia Erosion and Sediment Control Handbook, 3rd Edition (VESCH) and FP-24 Detail drawings. Adhere to vegetative and structural erosion and sediment control practices according to Minimum Standards and Specifications with Department of Environmental Quality regulations. Unless otherwise indicated, construct and maintain all proposed for this project. Install and maintain all erosion and sediment control measures required for compliance areErosion and Sediment Control measures including
Erosion and Sediment Control
Details included in the plans by variance.
Silt Fence and Fiber Roll are EFLHD FP-24 silt fence, fiber roll, inlet protection, and check dams
Structural Practices inlets.
Inlet protection (E157-04): Inlet protection is placed as shown in the plans to trap sediment prior to entering exceeding 2% until vegetation is provided for long-term stabilization.
Check dam (E157-04): Check dam is placed as shown in the plans to trap sediment within ditches with slopes vegetation is provided for long-term stabilization.
Fiber roll (E157-04): Fiber roll is placed as shown in the plans to trap sediment and moisture on slopes until is provided for long-term stabilization.
Silt fence (E157-02): Silt fence is placed as shown in the plans to trap sediement on slopes until vegetation removed.
After achieving adequate stabilization, the temporary erosion and sediment controls must be cleaned up and5.
sediment control practices.
The responsible land disturber must be responsible for the installation and maintenance of all erosion and4.
Clearly mark areas which are not to be disturbed with flags, signs, etc.3.
Temporary seeding or other stabilization must follow immediately after grading.2.
Sequence construction so that grading operations can begin and end as quickly as possible.1.
Management Strategies
CO.
sheets in the site plan drawings. In all seeding operations, seed must be applied prior to mulching as approved by the immediately following grading. Seeding will be done in accordance with the planting schedule provided on the notes
All disturbed areas that will remain dormant for more than one year must be stabilized with permanent seeding
Permanent Stabilization
The hydrologic group is classified as A
Peaks-Rock outcrop complex, Pigeonroost gravelly loam, Tate loam, and Thunder very cobbly loam.
dneytown loam, Peaks very gravelly loam, The following soil types were identified within the project site: E
Soils permanent turf establishment to disturbed areas where vegetation has not established;
permanent turf establishment to any remaining disturbed areas; where necessary, replace eroded topsoil and re-apply
After completion of roadway construction, do the following as directed by the CO: finish grading, place riprap, and apply
Phase III: Final Construction/Stabilization active haul roads, and in pits and staging areas.
longer than 14 days within 7 days of stockpiling. Provide watering for dust control within the construction limits, on around all stockpiled excavated roadway material. Apply temporary seeding to stockpiles remaining in place of each day’s rough grading operations, shape earthwork to minimize and control erosion from storm runoff. Provide Prior to any heavy machinery or truck vehicles entering the site, construct a stabilized construction entrance. At the end
Phase II: Intermediate Controls
.leave the project site. Perimeter controls include silt fence and Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not
Phase I: Establish Perimeter Controls
Sequence of Construction fiber roll only after all upslope areas are stabilized and vegetation is well established.
culvert outlet protection, riprap basins, and stabilized channels; remove all devices used for dewatering; and remove inspect, clean, and repair all
(with vegetation, riprap, or pavement) before routing drainage through completed culverts.
completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade and are stabilized
Install inlet protection prior to diverting water through inlets. Upon fiber roll fiber roll duration), and in accordance with the Stormwater Pollution Prevention Plan (SWPPP). In particular, check the following:
In general, check all erosion and sediment control measures daily, after every significant rainfall (0.5�” in a 24-hour
Maintenance…