Plans, Project #24-06-70-02, Roof Replacement REBID.pdf
PDF 8 MB Posted
- Solicitation number
- 24-06-70-02
- Issued by
- Muscatine County, Iowa
About this file
This is a construction plans document prepared by the Iowa Department of Natural Resources (DNR) Engineering Services for roof replacement work at Fairport State Fish Hatchery in Muscatine County. The project, identified as Project #24-06-70-02 and marked as a rebid, involves replacing roofing materials and performing miscellaneous repairs on three structures: a historic barn, an office building, and a chemical storage shed. The scope of work includes removal of existing roofing down to sheathing, repair or replacement of damaged sheathing and fascia boards, installation of new gutters and downspouts, and application of new roofing materials with underlayment. The barn roof requires turret and dormer work with two coats of Sherwin Williams Exterior Duration paint, while the office building includes chimney removal to below the roofline and construction of a new hip roof over the entrance. The chemical shed requires installation of new support posts on sonotube footings and construction of new rafters with roof pitch modifications. Standard roofing materials specified include CertainTeed Diamond-Deck underlayment and Atlas StormMaster Shake Black Shadow impact-resistant shingles, with an upgrade option (Alternate #1) for Grace self-adhered water and ice shield and Roser SteelGuard stone-coated steel shingles. The bid opening is scheduled for January 28, 2025, at 3:30 PM CST, with a submission deadline of February 20, 2025, at 3:00 PM CST. Contractors must notify District Inspector Bruce Flippin and Construction Inspector Michael Dufoe at least two weeks prior to construction and must conduct site visits to verify existing conditions before commencing work. All work must comply with Iowa Statewide Urban Design and Specifications (SUDAS) standards.
The project documentation indicates that asbestos abatement is required at multiple locations based on reports provided in the specifications, representing a significant environmental consideration for bidders. Contractors are responsible for disposal of excess materials and must restore all finishes disturbed during work. The work includes aluminum fascia and soffit wrapping, and all roofing penetrations must remain in place with proper flashing per manufacturer recommendations. Project Manager Mark Moeller (mark.moeller@dnr.iowa.gov, 515-214-9532) oversees the project, while District Inspector Bruce Flippin (515-689-8009) serves as the primary construction contact. No specific budget, pricing terms, set-asides, or incumbent vendor information is detailed in the plans document itself, though the bid package documentation referenced in the opportunity description contains such information. Construction survey completion requires a two-week minimum notice to the DNR. All work must be performed in accordance with applicable codes and ordinances, with the DNR Inspector responsible for approving all material and repair specifications prior to installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asbestos Report, Project #24-06-70-02.pdf | ||
| 1290369-event.pdf | ||
| Contract, Project #24-06-70-02.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER:
DATE:
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
C O
V
ER
S
HE
ET
DRAWN BY
H.D
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
JANUARY 27, 2025
24-06-70-02
ROOF REPLACEMENTS (REBID)
SHEET INDEX
IOWA DEPARTMENT OF NATURAL RESOURCES
CONSTRUCTION DOCUMENTS
FOR
FAIRPORT STATE FISH HATCHERY
ROOF REPLACEMENTS (REBID)
MUSCATINE COUNTY, IOWA
PROJECT #24-06-70-02
DIRECTORY
CONSTRUCTION INSPECTOR
IOWA DEPARTMENT OF NATURAL RESOURCES
502 EAST 9TH STREET
DES MOINES, IA 50319
MICHAEL DUFOE
515-985-9196 michael.dufoe@dnr.iowa.gov
COVER SHEET
OVERALL PROJECT MAP
ESTIMATED QUANTITIES AND GENERAL NOTES
BARN FRONT ELEVATION
BARN SIDE ELEVATION
BARN REAR ELEVATION
OFFICE FRONT ELEVATION
OFFICE SIDE ELEVATION
OFFICE REAR ELEVATION
CHEMICAL SHED FRONT ELEVATION
CHEMICAL SHED SIDE ELEVATION
PROJECT MANAGER
IOWA DEPARTMENT OF NATURAL RESOURCES
DES MOINES, IA 50319
MARK MOELLER, P.E.
(515) 214-9532 mark.moeller@dnr.iowa.gov
AUTHORIZATION TO BID
ENGINEERING BUREAU CHIEF DATE
AUTHORIZATION - PARKS | WILDLIFE | FISHERIES | LAW ENFORCEMENT | FORESTRYDATE
PARK LOCATION MAP
AutoCAD SHX Text THIS PROJECT INCLUDES REPLACING SHINGLES AND MISC REPAIRS TO THREE ROOFS AT FAIRPORT STATE FISH HATCHERY IN MUSCATINE COUNTY. CONSTRUCTION PER IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS).
AutoCAD SHX Text
COMPANY
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
CITY,STATE,ZIP
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
FAX
AutoCAD SHX Text
AutoCAD SHX Text
CONTACT
AutoCAD SHX Text
COMPANY
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
CITY,STATE,ZIP
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
FAX
AutoCAD SHX Text
AutoCAD SHX Text
CONTACT
AutoCAD SHX Text
MUSCATINE COUNTY
AutoCAD SHX Text
FAIRPORT STATE FISHERIES
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text
DUFOE
AutoCAD SHX Text
MICHAEL D.
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text 17753
AutoCAD SHX Text O
AutoCAD SHX Text
MY LICENSE RENEWAL DATE IS DECEMBER 31, 2025
AutoCAD SHX Text
DATE
AutoCAD SHX Text
IOWA.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
AutoCAD SHX Text
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT
AutoCAD SHX Text
PAGES OR SHEETS COVERED BY THIS SEAL:
AutoCAD SHX Text
SUPERVISION AND THAT I AM A DULY LICENSED PROFES-
AutoCAD SHX Text
SIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
AutoCAD SHX Text
ALL
AutoCAD SHX Text
MICHAEL D. DUFOE, IOWA REG. NO. 17753
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
O V
ER
A
LL
P
RO
JE
C T
M A
P
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
OVERALL PROJECT MAPSCALE: 1" = 50'
0' 50' 100' NORTH
1 REBID
AutoCAD SHX Text
CHEMICAL STORAGE BUILDING (NEW ROOF, GUTTER, MISC REPAIRS)
AutoCAD SHX Text
HIGHWAY 22
AutoCAD SHX Text
HISTORIC BARN (NEW ROOF, GUTTERS, FASCIA REPAIR)
AutoCAD SHX Text
OFFICE (NEW ROOF, GUTTERS, FASCIA, MISC REPAIRS)
FAIRPORT STATE FISHERIES
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
Q
UA
N
TIT
IE
S
A N
D G
EN
ER
A L
N O
TE
S
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
1 REBID
AutoCAD SHX Text A. The contractor shall notify the following two weeks prior to construction: The contractor shall notify the following two weeks prior to construction: 1. District Inspector: BRUCE FLIPPIN, P.E. (515) 689-8009 B. The contractor shall verify actual locations and elevations with the D.N.R Inspector. The contractor shall verify actual locations and elevations with the D.N.R Inspector. C. All work shall conform to and be performed in accordance with all applicable codes and ordinances. All work shall conform to and be performed in accordance with all applicable codes and ordinances. D. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to the start of work. Failure to visit the project site shall not relieve the actual job conditions prior to the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specifications, special provisions and the contractor from performing the work in accordance to the plans, specifications, special provisions and contract. contract. E. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the D.N.R Inspector of any discrepancies, omissions and/or conflicts prior to proceeding with the work. the D.N.R Inspector of any discrepancies, omissions and/or conflicts prior to proceeding with the work. F. The contractor is responsible for disposal for excess material (excavated material The contractor is responsible for disposal for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed, unless payment for overhaul will be allowed for material hauled to these sites. No material shall be placed, unless specifically stated in the plans or approved by the D.N.R Inspector. G. The contractor shall not disturb desirable grass areas and desirable trees outside construction limits. The The contractor shall not disturb desirable grass areas and desirable trees outside construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the D.N.R Inspector. materials. Storage, parking and service areas will be subject to the approval of the D.N.R Inspector. H. The contractor is expected to have materials, equipment and labor available on a daily basis to install and The contractor is expected to have materials, equipment and labor available on a daily basis to install and maintain erosion control features on the project, if needed. maintain erosion control features on the project, if needed. I. The contractor shall be responsible for any damage to existing facilities resulting from their negligence, The contractor shall be responsible for any damage to existing facilities resulting from their negligence, or that of a subcontractor, and said repairs shall be approved by the owner. or that of a subcontractor, and said repairs shall be approved by the owner. J. All work shall be per Iowa Statewide Urban Design and Specifications (SUDAS). Manuals can be viewed online at All work shall be per Iowa Statewide Urban Design and Specifications (SUDAS). Manuals can be viewed online at www.iowasudas.org. K. Construciton Survey to be completed by Iowa D.N.R. with 2-week minimum notice. Construciton Survey to be completed by Iowa D.N.R. with 2-week minimum notice.
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
ESTIMATED PROJECT QUANTITIES
ESTIMATE REFERENCE NOTES
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
BA
RN
F
RO
N T
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
1 REBID
BARN FRONT ELEVATION - N.T.S.
A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. SCRAPE AND CLEAN ALL WOOD SURFACES OF TURRET AND DORMER, PAINT SCRAPE AND CLEAN ALL WOOD SURFACES OF TURRET AND DORMER, PAINT WITH TWO (2) COATS OF SHERWIN WILLIAMS EXTERIOR DURATION PAINT, OR APPROVED EQUAL, COLOR TO MATCH EXISTING. 2. REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF DECK FOR NEW ROOFING MATERIAL. ASBESTOS ABATEMENT REQUIRED PER REPORT PROVIDED IN SPECIFICATIONS. 3. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. CONTRACTOR TO VERIFY THICKNESS PRIOR TO INSTALLING. ALL DAMAGED SHEATHING TO BE REVIEWED BY ENGINEER PRIOR TO INSTALLATION. 4. REPAIR OR REPLACE DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO REPAIR OR REPLACE DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND MATCH EXISTING DIMENSIONS AND PROFILE. REVIEW WITH ENGINEER PRIOR TO INSTALLATION. PAINT ALL FASCIA WITH MATCHING COLOR. 5. REMOVE ALL GUTTERS AND DOWNSPOUT, INSTALL NEW 6" ALUMINUM REMOVE ALL GUTTERS AND DOWNSPOUT, INSTALL NEW 6" ALUMINUM SEAMLESS GUTTERS AND DOWNSPOUTS, COLOR TO BE DETERMINED. 6. COVER ENTIRE ROOF DECK (INCLUDING TURRET AND DORMER) WITH COVER ENTIRE ROOF DECK (INCLUDING TURRET AND DORMER) WITH CERTAINTEED DIAMOND-DECK UNDERLAYMENT, THEN INSTALL ATLAS ATLAS STORMMASTER SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHINGLES, OR APPROVED EQUAL, OVER THE ENTIRE ROOF. , OR APPROVED EQUAL, OVER THE ENTIRE ROOF. 7. ALTERNATE #1 [UPGRADE]: COVER ENTIRE ROOF DECK (INCLUDING TURRET ALTERNATE #1 [UPGRADE]: COVER ENTIRE ROOF DECK (INCLUDING TURRET AND DORMER) WITH GRACE SELF-ADHERED WATER AND ICE SHIELD (IN LIEU OF THE CERTAINTEED UNDERLAYMENT), THEN INSTALL Roser Roser SteelGUARD Birch Stone Coated Steel Shingles, OR APPROVED EQUAL, PER Birch Stone Coated Steel Shingles, OR APPROVED EQUAL, PER , OR APPROVED EQUAL, PER MANUFACTURER'S INSTRUCTIONS.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
BA
RN
S
ID
E
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
1 REBID
BARN SIDE ELEVATION - N.T.S.
AutoCAD SHX Text A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND MATCH DIMENSIONS AND PROFILE OF EXISTING FASCIA AND REVIEW WITH ENGINEER PRIOR TO INSTALLATION. 2. REPAIR ANY DAMAGED STUCCO BOARD (APPROXIMATELY TWO SECTIONS ON REPAIR ANY DAMAGED STUCCO BOARD (APPROXIMATELY TWO SECTIONS ON SOUTH SIDE), MATCH SIMILAR STYLE AND COLOR. VERIFY DAMAGED SECTIONS WITH ENGINEER PRIOR TO INSTALLATION.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
BA
RN
R
EA
R
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
BARN REAR ELEVATION - N.T.S.
A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. SCRAPE AND CLEAN ALL WOOD SURFACES OF TURRET, PAINT WITH TWO SCRAPE AND CLEAN ALL WOOD SURFACES OF TURRET, PAINT WITH TWO (2) COATS OF SHERWIN WILLIAMS EXTERIOR DURATION PAINT, OR APPROVED EQUAL, COLOR TO MATCH EXISTING. 2. REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF DECK FOR NEW ROOFING MATERIAL. ASBESTOS ABATEMENT REQUIRED PER REPORT PROVIDED IN SPECIFICATIONS. 3. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. CONTRACTOR TO VERIFY THICKNESS PRIOR TO INSTALLING. ALL DAMAGED SHEATHING TO BE REVIEWED BY ENGINEER PRIOR TO INSTALLATION. 4. REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND MATCH EXISTING DIMENSIONS AND REVIEW WITH ENGINEER PRIOR TO INSTALLATION. 5. REMOVE ALL GUTTERS AND DOWNSPOUT, INSTALL NEW 6" ALUMINUM REMOVE ALL GUTTERS AND DOWNSPOUT, INSTALL NEW 6" ALUMINUM SEAMLESS GUTTERS AND DOWNSPOUTS, COLOR TO BE DETERMINED. 6. COVER ENTIRE ROOF DECK (INCLUDING TURRET AND DORMER) WITH COVER ENTIRE ROOF DECK (INCLUDING TURRET AND DORMER) WITH CERTAINTEED DIAMOND-DECK UNDERLAYMENT, THEN INSTALL ATLAS ATLAS STORMMASTER SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHINGLES, OR APPROVED EQUAL, OVER THE ENTIRE ROOF. , OR APPROVED EQUAL, OVER THE ENTIRE ROOF. 7. ALTERNATE #1 [UPGRADE]: COVER ENTIRE ROOF DECK (INCLUDING TURRET ALTERNATE #1 [UPGRADE]: COVER ENTIRE ROOF DECK (INCLUDING TURRET AND DORMER) WITH GRACE SELF-ADHERED WATER AND ICE SHIELD (IN LIEU OF THE CERTAINTEED UNDERLAYMENT), THEN INSTALL ROSER ROSER STEELGUARD BIRCH STONE COATED STEEL SHINGLES, OR APPROVED EQUAL, BIRCH STONE COATED STEEL SHINGLES, OR APPROVED EQUAL, , OR APPROVED EQUAL, PER MANUFACTURER'S INSTRUCTIONS.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
O
FF
IC
E
FR
O
N T
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
OFFICE FRONT ELEVATION - N.T.S.
A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF DECK FOR NEW ROOFING MATERIAL. 2. REMOVE EXISTING FLASHING AND TAR AROUND CHIMNEY AND VENT PIPE. REMOVE EXISTING FLASHING AND TAR AROUND CHIMNEY AND VENT PIPE. THE TAR CONTAINS ASBESTOS AND ABATEMENT IS REQUIRED PER THE REPORT PROVIDED IN THE SPECIFICATIONS. 3. CONTRACTOR SHALL REMOVE AND DISPOSE OF THE BRICK CHIMNEY TO CONTRACTOR SHALL REMOVE AND DISPOSE OF THE BRICK CHIMNEY TO BELOW THE ROOF LINE. REPLACE ANY SHEATHING IN THE AREA TO FILL HOLE. THE STATE WILL REPLACE THE CHIMNEY WITH A STANDARD INSULATED PIPE (TO BE INSTALLED BY OTHERS). THE CONTRACTOR SHALL COORDINATE THIS INSTALLATION INTO THEIR CONSTRUCTION SCHEDULE (APPROXIMATELY 1-WEEK) AND PROVIDE ANY NECESSARY FLASHING. 4. PROVIDE NEW SEAL AND REALIGN VENT PIPE. PROVIDE NEW SEAL AND REALIGN VENT PIPE. 5. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. CONTRACTOR TO VERIFY THICKNESS PRIOR TO INSTALLING. ALL DAMAGED SHEATHING TO BE REVIEWED BY ENGINEER PRIOR TO INSTALLATION. 6. REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND MATCH EXISTING DIMENSIONS AND REVIEW WITH ENGINEER PRIOR TO INSTALLATION. WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE DETERMINED. 7. REMOVE ALL GUTTERS AND DOWNSPOUT, INSTALL NEW 6" ALUMINUM REMOVE ALL GUTTERS AND DOWNSPOUT, INSTALL NEW 6" ALUMINUM SEAMLESS GUTTERS AND DOWNSPOUTS, COLOR TO BE DETERMINED. 8. COVER ENTIRE ROOF DECK WITH CERTAINTEED DIAMOND-DECK COVER ENTIRE ROOF DECK WITH CERTAINTEED DIAMOND-DECK UNDERLAYMENT, THEN INSTALL ATLAS STORMMASTER SHAKE BLACK ATLAS STORMMASTER SHAKE BLACK SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHINGLES, OR APPROVED EQUAL, , OR APPROVED EQUAL, OVER THE ENTIRE ROOF.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
O
FF
IC
E
SI
D
E
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
1 REBID
OFFICE SIDE ELEVATION - N.T.S.
AutoCAD SHX Text A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. SCRAPE AND CLEAN WOOD SURFACE (ONLY AT THE NORTH AND EAST SCRAPE AND CLEAN WOOD SURFACE (ONLY AT THE NORTH AND EAST GABLES), PAINT WITH TWO (2) COATS OF SHERWIN WILLIAMS EXTERIOR DURATION PAINT, OR APPROVED EQUAL, COLOR TO MATCH EXISTING. 2. WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE DETERMINED.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
O
FF
IC
E
RE
A
R
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
OFFICE REAR ELEVATION - N.T.S.
A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING, PREP ROOF DECK FOR NEW ROOFING MATERIAL. 2. REMOVE SATELLITE DISH, SEAL ANY HOLES IN ROOF. REMOVE SATELLITE DISH, SEAL ANY HOLES IN ROOF. 3. SCRAPE AND CLEAN WOOD SURFACE (ONLY AT THE NORTH AND EAST SCRAPE AND CLEAN WOOD SURFACE (ONLY AT THE NORTH AND EAST GABLES), PAINT WITH TWO (2) COATS OF SHERWIN WILLIAMS EXTERIOR DURATION PAINT, OR APPROVED EQUAL, COLOR TO MATCH EXISTING. 4. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. REPAIR ANY DAMAGED SHEATHING WITH 1/2" - 3/4" PLYWOOD. CONTRACTOR TO VERIFY THICKNESS PRIOR TO INSTALLING. ALL DAMAGED SHEATHING TO BE REVIEWED BY ENGINEER PRIOR TO INSTALLATION. 5. REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND REPAIR DAMAGED FASCIA BOARD WITH NEW. CONTRACTOR TO VERIFY AND MATCH EXISTING DIMENSIONS AND REVIEW WITH ENGINEER PRIOR TO INSTALLATION. WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE DETERMINED. 6. REMOVE ALL GUTTERS AND DOWNSPOUTS, INSTALL NEW 6" ALUMINUM REMOVE ALL GUTTERS AND DOWNSPOUTS, INSTALL NEW 6" ALUMINUM SEAMLESS GUTTERS AND DOWNSPOUTS, COLOR TO BE DETERMINED. 7. CONSTRUCT NEW HEADER AND FASCIA BOARD TO PROVIDE A NEW ROOF CONSTRUCT NEW HEADER AND FASCIA BOARD TO PROVIDE A NEW ROOF OVERHANG AT A 45 DEG ANGLE ACROSS ENTRANCE. 8. CONSTRUCT NEW "HIP" ROOF TO NEW HEADER WITH 5/8" PLYWOOD. CONSTRUCT NEW "HIP" ROOF TO NEW HEADER WITH 5/8" PLYWOOD. 9. COVER ENTIRE ROOF DECK WITH CERTAINTEED DIAMOND-DECK COVER ENTIRE ROOF DECK WITH CERTAINTEED DIAMOND-DECK UNDERLAYMENT, THEN INSTALL ATLAS STORMMASTER SHAKE BLACK ATLAS STORMMASTER SHAKE BLACK SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHINGLES, OR APPROVED EQUAL, , OR APPROVED EQUAL, OVER THE ENTIRE ROOF.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
C
HE
M
IC
A L
SH
ED
F
RO
N T
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
CHEMICAL SHED FRONT ELEVATION - N.T.S.
A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
1. REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING. REMOVE ALL ROOFING MATERIAL DOWN TO THE SHEATHING. 2. INSTALL 4X4 TREATED POSTS ON MIN 4' DEPTH SONOTUBE FOOTINGS. INSTALL 4X4 TREATED POSTS ON MIN 4' DEPTH SONOTUBE FOOTINGS. 3. CONSTRUCT NEW HEADER AND FASCIA BOARD TO PROVIDE A NEW ROOF CONSTRUCT NEW HEADER AND FASCIA BOARD TO PROVIDE A NEW ROOF OVERHANG MATCHING APPROXIMATELY WHERE EXISTING OVERHANG EXTENDS. 4. INSTALL NEW 5/8" PLYWOOD SHEATHING ON NEW RAFTERS FOR NEW ROOF INSTALL NEW 5/8" PLYWOOD SHEATHING ON NEW RAFTERS FOR NEW ROOF PITCH. 5. REMOVE ALL GUTTERS AND DOWNSPOUTS, INSTALL NEW 6" ALUMINUM REMOVE ALL GUTTERS AND DOWNSPOUTS, INSTALL NEW 6" ALUMINUM SEAMLESS GUTTERS AND DOWNSPOUTS, COLOR TO BE DETERMINED. 6. WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE DETERMINED. 7. COVER ENTIRE ROOF DECK WITH CERTAINTEED DIAMOND-DECK COVER ENTIRE ROOF DECK WITH CERTAINTEED DIAMOND-DECK UNDERLAYMENT, THEN INSTALL ATLAS STORMMASTER SHAKE BLACK ATLAS STORMMASTER SHAKE BLACK SHAKE BLACK SHADOW IMPACT-RESISTANT ROOFING SHINGLES, OR APPROVED EQUAL, , OR APPROVED EQUAL, OVER THE ENTIRE ROOF.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
W
AL
LA
C E
BU
ILI
NG
E.
TH
ST
DE
S M
O
IN
ES
, IA
-0
C O
NS
UL
TA
NT
NO
NE
SHEET No:
JANUARY 27, 2025
C
HE
M
IC
A L
SH
ED
S
ID
E
EL
EV
A
TIO
N
FA
IR
PO
RT
S
TA
TE
F
IS
H
HA
TC
HE
RY
24-06-70-02DRAWN BY
H.D
RO
O
F
RE
PL
A
C
EM
EN
TS
(R
EB
ID
) F
O R:
M
US
C A
TIN
E
C O
UN
TY
1 REBID
CHEMICAL SHED SIDE ELEVATION - N.T.S.
AutoCAD SHX Text A. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. B. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. RESTORE ALL FINISHES DISTURBED IN THE PROCESS OF RESTORATION. C. INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL INSTALL SHINGLES PER MANUFACTURER'S RECOMMENDATIONS. INCLUDED ALL ASSOCIATED ITEMS NEEDED FOR A COMPLETE ROOF PRODUCT. D. ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE ALL EXISTING ROOF PENETRATIONS, TO REMAIN IN PLACE, AND TO BE PROPERLY FLASHED AND BOOTED PER MANUFACTURER'S RECOMMENDATIONS.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. INSTALL 4X4 TREATED POSTS ON MIN 4' DEPTH SONOTUBE FOOTINGS. INSTALL 4X4 TREATED POSTS ON MIN 4' DEPTH SONOTUBE FOOTINGS. 2. CONSTRUCT NEW HEADER AND FASCIA BOARD TO PROVIDE A NEW ROOF CONSTRUCT NEW HEADER AND FASCIA BOARD TO PROVIDE A NEW ROOF OVERHANG MATCHING APPROXIMATELY WHERE EXISTING OVERHANG EXTENDS. 3. WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE WRAP ALL FASCIA AND SOFFITS WITH NEW ALUMINUM, COLOR TO BE DETERMINED. 4. CUT EXISTING TRIM BOARDS AND MATCH WITH NEW TO FILL IN AREA CUT EXISTING TRIM BOARDS AND MATCH WITH NEW TO FILL IN AREA CREATED BY NEW ROOF PITCH. PAINT WITH TWO (2) COATS OF SHERWIN WILLIAMS EXTERIOR DURATION PAINT, OR APPROVED EQUAL, COLOR TO MATCH EXISTING.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| 24-06-70-01 Fairport Roof Replacements - Plans-1 - COVER |
| 24-06-70-01 Fairport Roof Replacements - Plans-2 - OVERALL PLAN |
| 24-06-70-01 Fairport Roof Replacements - Plans-3 - NOTES |
| 24-06-70-01 Fairport Roof Replacements - Plans-4-BARN FRONT |
| 24-06-70-01 Fairport Roof Replacements - Plans-5-BARN SIDE |
| 24-06-70-01 Fairport Roof Replacements - Plans-6- BARN BACK |
| 24-06-70-01 Fairport Roof Replacements - Plans-7-OFFICE FRONT |
| 24-06-70-01 Fairport Roof Replacements - Plans-8-OFFICE SIDE |
| 24-06-70-01 Fairport Roof Replacements - Plans-9-OFFICE BACK |
| 24-06-70-01 Fairport Roof Replacements - Plans-10-CHEM SHED FRONT |
| 24-06-70-01 Fairport Roof Replacements - Plans-11-CHEM SHED SIDE |
File details come from the government source that posted it. Updated .