About this file

This is a project plan document prepared by the Iowa Department of Natural Resources Engineering Services for the Langesen WPA 2 NAWCA wetland restoration project in Winnebago County, Iowa, identified as Project #24-02-95-01. The project involves construction of water management infrastructure including four dikes, three ditch plugs, and a water control structure with stoplog system on the Langesen Wildlife Area. The construction documents include grading plans, erosion control specifications, and detailed structural drawings for a concrete intake structure with reinforced concrete walls six inches thick, stainless steel components, and aluminum stoplog assemblies. The contractor must notify the District Inspector, Heath Delzell (515-979-0104), at least two weeks prior to construction and shall conduct a pre-construction site visit to verify actual locations and elevations. General construction requirements mandate compliance with Iowa Statewide Urban Design and Specifications (SUDAS) standards, with the contractor responsible for erosion control installation and maintenance, material disposal, and any damage repairs resulting from their work.

The document specifies that construction survey will be completed by Iowa DNR with two-week minimum notice, and the contractor is responsible for verifying all site dimensions and conditions prior to work commencement. Estimated project quantities include dike and ditch plug construction with specific elevation requirements, stoplog channel installation using aluminum components, and concrete structural work meeting Class C mix specifications at 4,000 PSI. The contractor shall not disturb vegetation outside construction limits and must obtain DNR Inspector approval for storage, parking, and service areas. No specific pricing information, bid dates, or contract award dates are provided in these preliminary construction documents, which are dated August 30, 2024, and designated for future bidding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER:

DATE:

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

PA

RK

A

VE

DE

S M

O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

C O

V

ER

S

HE

ET

A.01

DRAWN BY

H.D

LA

N

G

ES

EN

W

PA

N

A W

C A

PR

O

JE

C

T D

ES

C

RI

PT

IO

N

F O

R:

W

IN

N

EB

A G

O C

O

UN

TY

AUGUST 30, 2024

24-02-95-01

1 PRELIMINARY

SHEET INDEX

IOWA DEPARTMENT OF NATURAL RESOURCES

CONSTRUCTION DOCUMENTS

FOR

LANGESEN WPA 2

NAWCA

WINNEBAGO COUNTY, IOWA

PROJECT #24-02-95-01

DIRECTORY

CONSTRUCTION INSPECTOR

IOWA DEPARTMENT OF NATURAL RESOURCES

6200 PARK AVE.

DES MOINES, IA 50319

TJ HERRICK

515-250-3715 tj.herrick@dnr.iowa.gov

A.01 A.02 C.01 D.01 D.02 D.03 D.04

COVER SHEET

OVERALL PROJECT MAP

ESTIMATED QUANTITIES AND GENERAL NOTES

GRADING PLAN

PLAN AND PROFILE

WATER CONTROL STRUCTURE DETAIL

STOPLOG DETAIL

PROJECT MANAGER

IOWA DEPARTMENT OF NATURAL RESOURCES

6200 PARK AVE

DES MOINES, IA 50321

Heath Delzell

515-979-0104 heath.delzell@dnr.iowa.gov

WMA LOCATION MAP

AutoCAD SHX Text

COMPANY

AutoCAD SHX Text

ADDRESS

AutoCAD SHX Text

CITY,STATE,ZIP

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

FAX

AutoCAD SHX Text

EMAIL

AutoCAD SHX Text

CONTACT

AutoCAD SHX Text

COMPANY

AutoCAD SHX Text

ADDRESS

AutoCAD SHX Text

CITY,STATE,ZIP

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

FAX

AutoCAD SHX Text

EMAIL

AutoCAD SHX Text

CONTACT

AutoCAD SHX Text

WINNEBAGO COUNTY

AutoCAD SHX Text Langesen WMA

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

AUGUST 30, 2024

A.02

O V

ER

A

LL

P

RO

JE

C T

M A

P

LA

N

G

ES

EN

W

PA

N

A W

C A

24-02-95-01DRAWN BY

H.D

PR

O

JE

C

T D

ES

C

RI

PT

IO

N

F O

R:

W

IN

N

EB

A G

O C

O

UN

TY

OVERALL PROJECT MAPSCALE: 1" = 400'

0' 400' 800' NORTH

1 PRELIMINARY

AutoCAD SHX Text Winnebago River

AutoCAD SHX Text Dike 1

AutoCAD SHX Text Dike 2

AutoCAD SHX Text Dike 3

AutoCAD SHX Text Dike 4

AutoCAD SHX Text Ditch Plug 1 WCS Location

AutoCAD SHX Text Ditch Plug 2

AutoCAD SHX Text Ditch Plug 3

AutoCAD SHX Text 510th St.

AutoCAD SHX Text Field Access

AutoCAD SHX Text Field Access

Barrow Sites

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T O

F N

A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, D

ES

M

O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

BID DATE

C.01

Q

UA

N

TIT

IE

S

A N

D G

EN

ER

A L

N O

TE

S

LA

N

G

ES

EN

W

PA

N

A W

C A

24-02-95-01DRAWN BY

H.D

PR

O

JE

C

T D

ES

C

RI

PT

IO

N

F O

R:

W

IN

N

EB

A G

O C

O

UN

TY

1 PRELIMINARY

AutoCAD SHX Text A. The contractor shall notify the following two weeks prior to construction: The contractor shall notify the following two weeks prior to construction: 1. District Inspector: Heath Delzell, P.E. 515-979-0104 B. The contractor shall verify actual locations and elevations with the D.N.R Inspector. The contractor shall verify actual locations and elevations with the D.N.R Inspector. C. All work shall conform to and be performed in accordance with all applicable codes and ordinances. All work shall conform to and be performed in accordance with all applicable codes and ordinances. D. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to the start of work. Failure to visit the project site shall not relieve the actual job conditions prior to the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specifications, special provisions and the contractor from performing the work in accordance to the plans, specifications, special provisions and contract. contract. E. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the D.N.R Inspector of any discrepancies, omissions and/or conflicts prior to proceeding with the work. the D.N.R Inspector of any discrepancies, omissions and/or conflicts prior to proceeding with the work. F. The contractor is responsible for disposal for excess material (excavated material The contractor is responsible for disposal for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed, unless payment for overhaul will be allowed for material hauled to these sites. No material shall be placed, unless specifically stated in the plans or approved by the D.N.R Inspector. G. The contractor shall not disturb desirable grass areas and desirable trees outside construction limits. The The contractor shall not disturb desirable grass areas and desirable trees outside construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the D.N.R Inspector. materials. Storage, parking and service areas will be subject to the approval of the D.N.R Inspector. H. The contractor is expected to have materials, equipment and labor available on a daily basis to install and The contractor is expected to have materials, equipment and labor available on a daily basis to install and maintain erosion control features on the project, if needed. maintain erosion control features on the project, if needed. I. The contractor shall be responsible for any damage to existing facilities resulting from their negligence, The contractor shall be responsible for any damage to existing facilities resulting from their negligence, or that of a subcontractor, and said repairs shall be approved by the owner. or that of a subcontractor, and said repairs shall be approved by the owner. J. All work shall be per Iowa Statewide Urban Design and Specifications (SUDAS). Manuals can be viewed online at All work shall be per Iowa Statewide Urban Design and Specifications (SUDAS). Manuals can be viewed online at www.iowasudas.org. K. Construciton Survey to be completed by Iowa D.N.R. with 2-week minimum notice. Construciton Survey to be completed by Iowa D.N.R. with 2-week minimum notice.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

ITEM

ESTIMATED PROJECT QUANTITIES

AUGUST 30, 2024

D.01

24-02-95-01

PR

O

JE

C

T D

ES

C

RI

PT

IO

N

F O

R:

W

IN

N

EB

A G

O C

O

UN

TY

1 PRELIMINARY

NOT TO SCALE PROJECT NUMBER:

DATE:

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

G

RA

D

IN

G P

LA

N

LA

N

G

ES

EN

W

PA

N

A W

C A

DRAWN BY

H.DGRADING PLAN

AutoCAD SHX Text 96"

AutoCAD SHX Text 6"

AutoCAD SHX Text 5:1

AutoCAD SHX Text Ditch Plug TYP Cross Section

AutoCAD SHX Text Stripping

AutoCAD SHX Text

ELEV. 1234.5

AutoCAD SHX Text 72"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4:1

AutoCAD SHX Text Dike TYP Cross Section

AutoCAD SHX Text Stripping

AutoCAD SHX Text

ELEV. 1234.5

Winnebago River

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

AUGUST 30, 2024

D.02

ER

O

SI

O

N C

O N

TR

O

L

PL

A N

LA

N

G

ES

EN

W

PA

N

A W

C A

24-02-95-01DRAWN BY

H.D

PR

O

JE

C

T D

ES

C

RI

PT

IO

N

F O

R:

W

IN

N

EB

A G

O C

O

UN

TY

1 PRELIMINARY

PLAN AND PROFILE

AutoCAD SHX Text Ditch Plug #1 Cross Section

AutoCAD SHX Text 6" Stripping

AutoCAD SHX Text

ELEV. 1234.5

AutoCAD SHX Text

ELEV. 1230.0

AutoCAD SHX Text 12" Macadam Stone

AutoCAD SHX Text Ditch Plug #1 Profile Plan (Top View)

AutoCAD SHX Text

FLOWLINE ELEV = 1230.0

AutoCAD SHX Text

DITCH PLUG TOP ELEV = 1234.5

5 to 1 Slope

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

SHEET No:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P ar k A ve

D

ES

M

O

IN

ES

, IA

C

LE

A R

LA

KE

W

IL

D

LI

FE

U

N

IT

C O

NS

UL

TA

NT

E.S

H.D

PLAN VIEW

SECTION B SECTION A @ CENTER LINE

DETAIL C

GRATE DETAIL

C O

N C

RE

TE

S

TO

PL

O

G

IN

TA

KE

D.03

SEP/2024

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

1'-0" MIN

AutoCAD SHX Text #4 @ 12" C-C

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 6"

AutoCAD SHX Text

24" DIA CMP 14 GAUGE CMP STUB 2'-6" LONG

AutoCAD SHX Text

24" DIA CMP

AutoCAD SHX Text

LOCKING SEE DETAIL

AutoCAD SHX Text

CONCRETE TO BE POUR IN PLACE. SEE DETAIL FOR REINFORCEMENT

AutoCAD SHX Text

STOP LOGS

AutoCAD SHX Text CHANNEL 3" X 3" X " 14" 2 REQ'D OR APPROVED EQUAL EXTEND 2" ABOVE STRUCTURE FOR LOCKING MECHANISM SEE SHEET 15

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text

14GAUGE CMP STUB

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 6"

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

12" X 6" STAINLESS STEEL WEDGE ANCHORS 12" C-C

AutoCAD SHX Text

3" X 3" X " ANGLES 14" ANGLES GRATING SUPPORT

AutoCAD SHX Text McNICHOLS GW-150A 1 " X " 12" X " 18" GALVANIZED GRATING OR APPROVED EQUAL

AutoCAD SHX Text 6"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text

STOP LOGS

AutoCAD SHX Text DETAIL A1 NOTE: ALL CONCRETE SHALL BE REINFORCED CLASS `C' MIX 4,000 PSI 6 INCHES THICK WALLS 3 INCH CONCRETE COVER STEEL SHALL BE #4 DEFORMED STEEL REINFORCEMENT BOTH WAYS AT 12 INCHES ON CENTER. THE BEDDING MATERIAL SHALL BE A MINIMUM OF 3 INCHES LAYER OF CLASS `A' CRUSHED STONE COMPACTED

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

OF PIPEOF PIPE

AutoCAD SHX Text

OF PIPEOF PIPE

AutoCAD SHX Text C

AutoCAD SHX Text

WATERTIGHT GASKET OR CONCRETE COLLAR

AutoCAD SHX Text

WATERTIGHT GASKET OR CONCRETE COLLAR

AutoCAD SHX Text 0"

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text H-3 SADDLE GRATING ANCHORS WITH BX2 TEK 3 STAINLESS STEEL WEDGE ANCHORS 12" C-C (8 REQUIRED) OR APPROVED EQUAL BY THE DNR ENGINEER

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

WINNEBAGO COUNTY, IOWA

AutoCAD SHX Text

LANGESEN WETLAND RESTORATION FOR:

AutoCAD SHX Text

SEE DETAIL ON SHEET 15

4'-3"

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

SHEET No:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P ar k A ve

, D

ES

M

O

IN

ES

, IA

C O

NS

UL

TA

NT

E.S

H.D

STOP LOG LIFTING HOOK DETAIL

STOP LOG LOCK BAR DETAIL

D.04

STOP LOG CHANNEL DETAILALUMINUM STOPLOG DETAIL

S

TO

P

LO

G D

ET

A

IL

S

C

LE

A R

LA

KE

W

IL

D

LI

FE

U

N

IT

H.D

W

IN

N

EB

A G

O C

O

UN

TY

, I

O W

A

LA

N

G

ES

EN

W

ET

LA

N D

R

ES

TO

RA

TIO

N

F O

R:

SEP/2024STOP LOG CHANNEL ANCHORING DETAIL

HEIGHT OF INLET

AutoCAD SHX Text 2"

AutoCAD SHX Text 12"

AutoCAD SHX Text 2-1/2"

AutoCAD SHX Text 4"

AutoCAD SHX Text FLATTEN END OF THE ROD TO APPROX. " X 1 " 38" X 1 " 12" AND DRILL " DIA. HOLE CENTERED 1" FROM END 12" DIA. HOLE CENTERED 1" FROM END

AutoCAD SHX Text

12" DIA. STEEL ROD

AutoCAD SHX Text 5'-2"

AutoCAD SHX Text NOTE: THE STOP LOG SHALL BE ALUMINUM AND THE CONTRACTOR IS RESPONSIBLE FOR CUTTING STOP LOGS TO PROPER LENGTH AND ALL FABRICATION REQUIRED TO AVOID LEAKAGE. THE " DIMENSION IS CRITICAL AND 34" DIMENSION IS CRITICAL AND NEEDS TO BE CENTERED IN THE STOP LOG TO AVOID LEAKAGE. ACTUAL LENGTH IS TO BE DETERMINED ON SITE.

AutoCAD SHX Text

1" LESS THAN TIGHT FIT, TO BE DETERMINED IN THE FIELD

AutoCAD SHX Text 6"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1'-1"

AutoCAD SHX Text

SEE NOTE

AutoCAD SHX Text 2"

AutoCAD SHX Text 5/8"

AutoCAD SHX Text NOTE: STOP LOGS TO BE MANUFACTURED FROM " ALUMINUM TUBE 14" ALUMINUM TUBE STOCK (2 CHANNELS CANNOT BE WELDED TOGETHER) CONTRACTOR TO SUPPLY 10 STOP LOGS WITH A 6" HEIGHT AND 2 STOP LOGS WITH A 3" HEIGHT

AutoCAD SHX Text

CUT HOLES TO FORM LIFTING PEGS

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1/4"

AutoCAD SHX Text STOPLOG COMPONENTS: ( ALL ALUMINUM) STOPLOG 2" X 6" X 1/4" ALUMINUM (6061-T6) 6 REQ'D 6 REQ'D STOPLOGS 2" X 4" X 1/4" ALUMINUM (6061-T6) 3 REQ'D 3 REQ'D STOPLOG CHANNEL GUIDE 3" X 3" X " 16 LF 14" 16 LF (ANGLES WELDED TOGETHER BY A CONTINUOUS WELD AND WATERTIGHT.) LIFTING HOOKS GALVANIZED 2 REQ'D. 2 REQ'D. THIS LIST IS PROVIDED FOR INFORMATION ONLY ADDITIONAL MATERIALS NOT LISTED HERE MAY BE REQUIRED. LENGTH OF STEEL STOCK BEYOND WHAT'S LISTED HERE MAY BE REQUIRED TO ALLOW FOR FABRICATION

AutoCAD SHX Text 2"

AutoCAD SHX Text 58" X 2 " STAINLESS STEEL 34" STAINLESS STEEL ANCHOR BOLTS, 8 REQ'D OR APPROVED EQUAL BY THE D.N.R ENGINEER

STOPLOG CHANNEL

24-02-95-01 LANGESEN 2 WPA - NAWCA-Plan Set_V2.pdf
Sheets and Views
24-02-95-01 LANGESEN 2 WPA - NAWCA-1 - COVER
24-02-95-01 LANGESEN 2 WPA - NAWCA-2 - OVERALL PLAN
24-02-95-01 LANGESEN 2 WPA - NAWCA-3 - NOTES
24-02-95-01 LANGESEN 2 WPA - NAWCA-5 - GRADING
24-02-95-01 LANGESEN 2 WPA - NAWCA-6 - PLAN & PROFILE
Langesen Concrete Box Sheets.pdf
Sheets and Views
Concrete Box Intake Structure-Layout1
Langesen Concrete Box Sheets.pdf
Sheets and Views
Concrete Box Intake Structure-8. STOPLOG DETAIL (2)

File details come from the government source that posted it. Updated .